Name: | AI DISSOLUTION CO. |
Legal type: | Kentucky Corporation |
Status: | Inactive |
Standing: | Bad |
Profit or Non-Profit: | Profit |
Organization Date: | 30 Jan 1974 (51 years ago) |
Last Annual Report: | 01 Jun 2004 (21 years ago) |
Organization Number: | 0000510 |
ZIP code: | 41101 |
City: | Ashland, Summitt, Westwood |
Primary County: | Boyd County |
Principal Office: | 2000 ASHLAND DRIVE, ASHLAND, KY 41101-7058 |
Place of Formation: | KENTUCKY |
Authorized Shares: | 1000 |
CIK number | Mailing Address | Business Address | Phone | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
0001053829 | 1500 N BIG RUN RD, ASHLAND, KY, 41102 | 1500 N BIG RUN RD, ASHLAND, KY, 41102 | 6069283433 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Form type | S-1 |
File number | 333-97693-72 |
Filing date | 2002-08-06 |
File | View File |
Filings since 2001-05-31
Form type | RW |
File number | 333-72327-05 |
Filing date | 2001-05-31 |
File | View File |
Filings since 2001-05-31
Form type | RW |
File number | 333-72355-05 |
Filing date | 2001-05-31 |
File | View File |
Filings since 1999-04-29
Form type | S-4/A |
File number | 333-72355-05 |
Filing date | 1999-04-29 |
Filings since 1999-03-22
Form type | RW |
File number | 333-45111-03 |
Filing date | 1999-03-22 |
Filings since 1999-02-12
Form type | S-4 |
File number | 333-72355-05 |
Filing date | 1999-02-12 |
Filings since 1999-02-12
Form type | S-4 |
File number | 333-72327-05 |
Filing date | 1999-02-12 |
Filings since 1998-01-29
Form type | S-4 |
File number | 333-45111-03 |
Filing date | 1998-01-29 |
Name | Role |
---|---|
LETCHER T. WHITE | Director |
JULIAN C. LEEDY | Director |
Scott Tepper | Director |
Marc Merritt | Director |
ANDREW ADAMS | Director |
Name | Role |
---|---|
ANDREW ADAMS | Incorporator |
Name | Role |
---|---|
Scott Tepper | President |
Name | Role |
---|---|
Lance Sogan | Vice President |
Name | Role |
---|---|
Marc Merritt | Treasurer |
Name | Role |
---|---|
Daniel L. Stickler | Secretary |
Name | Role |
---|---|
C T CORPORATION SYSTEM | Registered Agent |
Name | Action |
---|---|
ACECO, INC | Old Name |
Name | File Date |
---|---|
Administrative Dissolution | 2005-11-01 |
Annual Report | 2003-10-02 |
Annual Report | 2002-12-16 |
Annual Report | 2000-05-25 |
Statement of Change | 1999-07-27 |
Annual Report | 1999-07-19 |
Annual Report | 1998-06-26 |
Amended and Restated Articles | 1998-03-04 |
Statement of Change | 1998-03-04 |
Annual Report | 1997-07-01 |
Mine Name | Type | Status | Primary Sic | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
No 2 Prep Plant | Facility | Abandoned | Coal (Bituminous) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Name | Aceco Inc |
Role | Operator |
Start Date | 1950-01-01 |
Name | Aminex Resources Corp |
Role | Current Controller |
Start Date | 1950-01-01 |
Name | Aceco Inc |
Role | Current Operator |
Parties
Name | Aceco Inc |
Role | Operator |
Start Date | 1950-01-01 |
End Date | 1976-11-29 |
Name | Black Gold Sales Inc |
Role | Operator |
Start Date | 1976-11-30 |
Name | Gorman L D |
Role | Current Controller |
Start Date | 1976-11-30 |
Name | Black Gold Sales Inc |
Role | Current Operator |
Parties
Name | Aceco Inc |
Role | Operator |
Start Date | 1974-01-01 |
Name | Aminex Resources Corp |
Role | Current Controller |
Start Date | 1974-01-01 |
Name | Aceco Inc |
Role | Current Operator |
Parties
Name | Aceco Inc |
Role | Operator |
Start Date | 1975-01-01 |
Name | Aminex Resources Corp |
Role | Current Controller |
Start Date | 1975-01-01 |
Name | Aceco Inc |
Role | Current Operator |
Parties
Name | Aceco Inc |
Role | Operator |
Start Date | 1976-09-01 |
Name | Aminex Resources Corp |
Role | Current Controller |
Start Date | 1976-09-01 |
Name | Aceco Inc |
Role | Current Operator |
Directions to Mine | From office turn Left turn Left on Highway 15 North go 1.3 miles to Hal Rogers Parkway turn left go east on Hal Rogers Parkway 1 mile turn right up hill to Plant |
Parties
Name | ICG Hazard, LLC |
Role | Operator |
Start Date | 2004-10-03 |
End Date | 2014-04-30 |
Name | Pine Branch Mining LLC |
Role | Operator |
Start Date | 2014-05-01 |
Name | Aceco Inc |
Role | Operator |
Start Date | 1982-05-01 |
End Date | 1985-06-30 |
Name | Leslie Resources Inc |
Role | Operator |
Start Date | 1998-03-09 |
End Date | 2004-10-02 |
Name | Aceco Inc |
Role | Operator |
Start Date | 1985-07-01 |
End Date | 1995-06-19 |
Name | Leslie Resources Inc |
Role | Operator |
Start Date | 1996-02-01 |
End Date | 1998-03-08 |
Name | Aceco Inc |
Role | Operator |
Start Date | 1995-06-20 |
End Date | 1996-01-31 |
Name | Sev.en Global Investments a.s. |
Role | Current Controller |
Start Date | 2014-05-01 |
Name | Pine Branch Mining LLC |
Role | Current Operator |
Accidents
Accident Date | 2019-12-06 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Struck by falling object |
Ocupation | Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech |
Narrative | Employee and another employee were closing a garage door and the cable broke causing one of the rollers to come out hitting the employee in the head requiring 2 staples. |
Accident Date | 2019-06-17 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Bodily reaction, NEC |
Ocupation | Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech |
Narrative | While removing bolts from pins that connect the radiator nose cone to the frame left knee locked up and they couldn't straighten it. |
Accident Date | 2017-10-24 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Struck by... NEC |
Ocupation | Prep plant foreman, Supervisor, Mill plant supervisor, Kiln supervisor |
Narrative | Employee was opening the inspection door on the sampler system in the load out building and it struck employee's left index finger and cut it. Resulted in 5 sutures and employee returned back to work next scheduled shift. |
Accident Date | 2017-04-24 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Caught in, under or between NEC |
Ocupation | Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech |
Narrative | Caught employee's left arm in the steering wheel of a sweeper truck causing a hair line fracture. |
Accident Date | 2015-03-18 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Fall to the walkway or working surface |
Ocupation | Weighman, Scale person |
Narrative | Employee was reaching for ticket and when she tried to sit back down the chair rolled away causing her to fall on desk and floor. Started missing work on 10/19/2015. |
Accident Date | 2015-02-10 |
Degree Inhury | ACCIDENT ONLY |
Accident Type | Accident type, without injuries |
Ocupation | NO VALUE FOUND |
Narrative | MSHA inspector observed coal at #1 and #4 silos smoking and issued a K-order #8321634. A citation for not reporting the incident was issued, citation #8321634, for failure to report. No actual fire was observed. This is being reported to prevent further action against the operator. |
Accident Date | 2014-06-11 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Over-exertion NEC |
Ocupation | Weighman, Scale person |
Narrative | EE was walking and stepped out of scale house turning her left ankle. Was taken to Hazard ARH and diagnosed with a severe sprained ankle. Returned to work.EE worked til July 1st with no restrictions doctor excused her from work because of swelling in foot. |
Accident Date | 2014-03-08 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Struck by... NEC |
Ocupation | Prep plant foreman, Supervisor, Mill plant supervisor, Kiln supervisor |
Narrative | Chute was plugged with large blocks of coal at crusher. A slate bar was being utilized with a sledge hammer to break the material free. Sledge hammer glanced off of bar being used and struck victim in right forearm resulting in cracked ulna bone. |
Accident Date | 2009-07-07 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Over-exertion NEC |
Ocupation | Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech |
Narrative | Employee was repairing a steering clutch in a bent over postion. As he raised up. He felt a sharp pain in his lower back. He went to dr and was placed off work on 7/8/09. |
Accident Date | 2008-07-21 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Over-exertion in lifting objects |
Ocupation | Electrician, Lineman |
Narrative | Employee hurt his shoulder on 7/21/08 but continued to work. He went in for surgery on 9/2/08 and his first day away was 9/3/08. |
Accident Date | 2007-06-02 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Struck by... NEC |
Ocupation | Welder (shop) |
Narrative | While cutting dust mats for #2 silo, employee was attempting to cut excess mat when the knife slipped through the belt, striking him in his left wrist & causing a cut approx. 3 in. long. |
Accident Date | 2005-09-12 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Over-exertion NEC |
Ocupation | Prep plant foreman, Supervisor, Mill plant supervisor, Kiln supervisor |
Narrative | Employee had hurt his shoulder on 9-12-05 but had continued to work. Employee Dr. decided on 12-15-05 employee needed some corrective surgery. |
Accident Date | 2004-04-21 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Fall down stairs |
Ocupation | Laborer, Blacksmith, Bull gang, Parts runner, Roustabout, Pick-up man, Pitman |
Narrative | AS HE WAS STARTING DOWN STAIRWAY, EMPLOYEE MIS-STEPPED AND FELL DOWN STAIRS. |
Accident Date | 2004-03-25 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Struck by... NEC |
Ocupation | Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech |
Narrative | EMPLOYEE WAS CUTTING BELTS WHEN KNIFE SLIPPED AND HIS HIS LEFT HAND CAUSING A LACERATION. |
Accident Date | 2003-12-05 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Struck by falling object |
Ocupation | Backhoe operator, Trackhoe operator, Crane operator |
Narrative | EMPLOYEE WAS LOADING ROLLERS WHEN ONE SLIPPED STRIKING EE IN RIGHT LEG. RETURNED TO WORK THE SAME SHIFT. |
Accident Date | 2003-01-16 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Fall from machine |
Ocupation | Laborer, Blacksmith, Bull gang, Parts runner, Roustabout, Pick-up man, Pitman |
Narrative | WHILE FUELING DOZER EE'S FOOT SLIPPED & WENT BETWEEN PUSHARM & ROLLER FRAME. SNOW CONTRIBUTED TO THIS ACCIDENT. THE BONE WAS BROKE IN HIS RIGHT FOOT. |
Accident Date | 2002-08-19 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Over-exertion NEC |
Ocupation | Electrician, Lineman |
Narrative | WALKING DOWN MAIN BELT COMING INTO LOADOUT EMPLOYEE SLIPPED HURTING HIS LEFT KNEE. |
Accident Date | 2002-02-20 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Struck against a moving object |
Ocupation | Front-end loader, Scraper-loader operator, Pan operator, Payloader, Scraper rig operator |
Narrative | OPERATOR WAS OPERATING A 980C CAT LOADER CLEANING UP DUMP PAD AND BACK INTO COAL TRUCK. LOADER OPERATOR WENT TO HOSPITAL WITH COMPLAINTS OF BACK PAIN. XRAYS WERE NEGATIVE. HE RETURNED TO WORK AND CONTINUED TO WORK UNTIL 3-25-02. HE CALLED AND SAID DR. PUT HIM OFF FROM WORK. |
Accident Date | 2002-02-09 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Struck by... NEC |
Ocupation | Truck driver |
Narrative | DRIVER STOPPED TO INSPECT TIRES WHILE WAITING TO CROSS SCALES AND THE TIRE BLEW OUT AS HE LEANEDOVER IT. |
Accident Date | 2000-04-25 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Contact with hot objects or substances |
Ocupation | Electrician, Lineman |
Narrative | EE WAS STANDING 6-10' AWAY FROM THE BREAKER EXPLOSION WHERE TWO COWORKERS WERE WORKING. HE RECEIVED BURNS TO HIS HANDS WHILE TRYING TO EXTINGUISH THE FIRE ON THE COWORKERS. HE WAS TRANSPORTED TO HOSPITAL WHERE HE WAS TREATED AND RELEASED 2 DAYS LATER. |
Inspections
Start Date | 2025-01-31 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 3 |
Total Hours | 25 |
Start Date | 2024-12-02 |
End Date | 2024-12-03 |
Activity | Spot Inspection |
Number Inspectors | 1 |
Total Hours | 18 |
Start Date | 2024-10-13 |
End Date | 2024-11-15 |
Activity | Non-Injury Accident Investigation |
Number Inspectors | 6 |
Total Hours | 54.75 |
Start Date | 2024-09-23 |
End Date | 2024-09-30 |
Activity | Spot Inspection |
Number Inspectors | 2 |
Total Hours | 52 |
Start Date | 2024-05-22 |
End Date | 2024-05-22 |
Activity | Special Emphasis Programs |
Number Inspectors | 1 |
Total Hours | 4 |
Start Date | 2024-05-02 |
End Date | 2024-05-02 |
Activity | Verbal Hazard Complaint Inspections |
Number Inspectors | 1 |
Total Hours | 2.75 |
Start Date | 2024-05-02 |
End Date | 2024-06-13 |
Activity | Non-Injury Accident Investigation |
Number Inspectors | 4 |
Total Hours | 13 |
Start Date | 2024-04-01 |
End Date | 2024-06-12 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 5 |
Total Hours | 157.25 |
Start Date | 2024-03-26 |
End Date | 2024-03-28 |
Activity | Spot Inspection |
Number Inspectors | 2 |
Total Hours | 54.5 |
Start Date | 2024-02-21 |
End Date | 2024-03-05 |
Activity | Non-Injury Accident Investigation |
Number Inspectors | 3 |
Total Hours | 6.25 |
Start Date | 2024-02-21 |
End Date | 2024-02-21 |
Activity | Spot Inspection |
Number Inspectors | 1 |
Total Hours | 9.75 |
Start Date | 2024-01-11 |
End Date | 2024-03-05 |
Activity | Non-Injury Accident Investigation |
Number Inspectors | 2 |
Total Hours | 10.75 |
Start Date | 2024-01-11 |
End Date | 2024-01-11 |
Activity | Spot Inspection |
Number Inspectors | 1 |
Total Hours | 1.5 |
Start Date | 2023-10-30 |
End Date | 2024-01-02 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 7 |
Total Hours | 143 |
Start Date | 2023-10-17 |
End Date | 2023-10-17 |
Activity | Verbal Hazard Complaint Inspections |
Number Inspectors | 2 |
Total Hours | 6 |
Start Date | 2023-10-17 |
End Date | 2023-11-01 |
Activity | Non-Injury Accident Investigation |
Number Inspectors | 2 |
Total Hours | 6.75 |
Start Date | 2023-09-25 |
End Date | 2023-09-26 |
Activity | Spot Inspection |
Number Inspectors | 1 |
Total Hours | 12 |
Start Date | 2023-04-03 |
End Date | 2023-07-26 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 6 |
Total Hours | 107 |
Start Date | 2022-12-22 |
End Date | 2023-02-10 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 8 |
Total Hours | 182.25 |
Start Date | 2022-06-21 |
End Date | 2022-07-12 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 2 |
Total Hours | 107 |
Productions
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2024 |
Annual Hours | 34171 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 13 |
Avg. Employee Hours | 2629 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2023 |
Annual Hours | 34980 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 14 |
Avg. Employee Hours | 2499 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2022 |
Annual Hours | 32921 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 13 |
Avg. Employee Hours | 2532 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2021 |
Annual Hours | 24286 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 9 |
Avg. Employee Hours | 2698 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2020 |
Annual Hours | 22363 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 9 |
Avg. Employee Hours | 2485 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2019 |
Annual Hours | 23016 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 9 |
Avg. Employee Hours | 2557 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2018 |
Annual Hours | 26149 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 11 |
Avg. Employee Hours | 2377 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2018 |
Annual Hours | 4891 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 9 |
Avg. Employee Hours | 543 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2017 |
Annual Hours | 24528 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 10 |
Avg. Employee Hours | 2453 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2017 |
Annual Hours | 14299 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 9 |
Avg. Employee Hours | 1589 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2016 |
Annual Hours | 26352 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 10 |
Avg. Employee Hours | 2635 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2015 |
Annual Hours | 44676 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 16 |
Avg. Employee Hours | 2792 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2015 |
Annual Hours | 3840 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 3 |
Avg. Employee Hours | 1280 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2014 |
Annual Hours | 48273 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 15 |
Avg. Employee Hours | 3218 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2014 |
Annual Hours | 11358 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 7 |
Avg. Employee Hours | 1623 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2013 |
Annual Hours | 132291 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 52 |
Avg. Employee Hours | 2544 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2013 |
Annual Hours | 36800 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 15 |
Avg. Employee Hours | 2453 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2012 |
Annual Hours | 146689 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 63 |
Avg. Employee Hours | 2328 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2012 |
Annual Hours | 38200 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 16 |
Avg. Employee Hours | 2388 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2011 |
Annual Hours | 136688 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 49 |
Avg. Employee Hours | 2790 |
Sources: Kentucky Secretary of State