Ano #1
|
Surface
|
Abandoned
|
Coal (Bituminous)
|
|
Parties
Name
|
Ikerd-Bandy Company Inc
|
Role
|
Operator
|
Start Date
|
1950-01-01
|
End Date
|
1985-02-14
|
|
Name
|
Ikerd-Bandy Company Inc
|
Role
|
Operator
|
Start Date
|
1985-02-15
|
|
Name
|
James J Kocian
|
Role
|
Current Controller
|
Start Date
|
1985-02-15
|
|
Name
|
Ikerd-Bandy Company Inc
|
Role
|
Current Operator
|
|
|
No 7 Mine
|
Underground
|
Abandoned
|
Coal (Bituminous)
|
|
Parties
Name
|
Ikerd-Bandy Company Inc
|
Role
|
Operator
|
Start Date
|
1950-01-01
|
|
Name
|
Kaneb Services Inc
|
Role
|
Current Controller
|
Start Date
|
1950-01-01
|
|
Name
|
Ikerd-Bandy Company Inc
|
Role
|
Current Operator
|
|
|
Ikerd Coal Company LLC
|
Facility
|
Abandoned
|
Coal (Bituminous)
|
|
Parties
Name
|
Ikerd Coal Company LLC
|
Role
|
Operator
|
Start Date
|
2005-05-05
|
End Date
|
2005-07-10
|
|
Name
|
Ikerd-Bandy Company Inc
|
Role
|
Operator
|
Start Date
|
1950-01-01
|
End Date
|
1985-02-14
|
|
Name
|
Cumberland Creek Coal Company
|
Role
|
Operator
|
Start Date
|
1988-02-19
|
End Date
|
1991-04-22
|
|
Name
|
Ikerd Terminal Co LLC
|
Role
|
Operator
|
Start Date
|
2005-07-11
|
|
Name
|
Ikerd-Bandy Company Inc
|
Role
|
Operator
|
Start Date
|
1985-02-15
|
End Date
|
1988-02-18
|
|
Name
|
R A I Inc
|
Role
|
Operator
|
Start Date
|
1991-04-23
|
End Date
|
1998-05-17
|
|
Name
|
Re-New Energy L L C
|
Role
|
Operator
|
Start Date
|
1998-05-18
|
End Date
|
1998-10-30
|
|
Name
|
Kentucky Energy Llc
|
Role
|
Operator
|
Start Date
|
1998-10-31
|
End Date
|
2005-05-04
|
|
Name
|
Frank H Ikerd III
|
Role
|
Current Controller
|
Start Date
|
2005-07-11
|
|
Name
|
Ikerd Terminal Co LLC
|
Role
|
Current Operator
|
|
Inspections
Start Date |
2022-05-05
|
End Date |
2022-05-05
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
6
|
|
Start Date |
2022-02-24
|
End Date |
2022-02-24
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
5
|
|
Start Date |
2021-04-07
|
End Date |
2021-04-07
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
5.5
|
|
Start Date |
2021-03-31
|
End Date |
2021-03-31
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
9.5
|
|
Start Date |
2021-03-04
|
End Date |
2021-03-04
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
7.75
|
|
Start Date |
2020-07-22
|
End Date |
2020-07-22
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
10
|
|
Start Date |
2019-10-24
|
End Date |
2019-10-24
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
8
|
|
Start Date |
2019-04-24
|
End Date |
2019-04-24
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
9.5
|
|
Start Date |
2019-01-10
|
End Date |
2019-01-10
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
6.5
|
|
Start Date |
2018-06-27
|
End Date |
2018-06-27
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
8.5
|
|
Start Date |
2017-10-12
|
End Date |
2017-10-12
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
8
|
|
Start Date |
2017-04-13
|
End Date |
2017-04-13
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
7.25
|
|
Start Date |
2017-01-13
|
End Date |
2017-01-13
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
8
|
|
Start Date |
2016-04-04
|
End Date |
2016-09-14
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
11
|
|
Start Date |
2015-10-05
|
End Date |
2015-12-29
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
21
|
|
Start Date |
2015-07-06
|
End Date |
2015-07-08
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
22
|
|
Start Date |
2015-03-13
|
End Date |
2015-03-14
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
9.5
|
|
Start Date |
2014-09-30
|
End Date |
2014-09-30
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
6
|
|
Start Date |
2014-06-24
|
End Date |
2014-07-16
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
35
|
|
Start Date |
2013-12-09
|
End Date |
2013-12-09
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
9
|
|
Productions
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2011
|
Annual Hours
|
5249
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
875
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2011
|
Annual Hours
|
431
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
216
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2010
|
Annual Hours
|
13784
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
9
|
Avg. Employee Hours
|
1532
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2010
|
Annual Hours
|
2858
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1429
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2009
|
Annual Hours
|
17573
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
2510
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2009
|
Annual Hours
|
2575
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2575
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2008
|
Annual Hours
|
15600
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
2600
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2008
|
Annual Hours
|
2609
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2609
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2007
|
Annual Hours
|
14087
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
2817
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2007
|
Annual Hours
|
4226
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
2113
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2006
|
Annual Hours
|
13344
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
2669
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2006
|
Annual Hours
|
2131
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2131
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2005
|
Annual Hours
|
9467
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
8
|
Avg. Employee Hours
|
1183
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2005
|
Annual Hours
|
1413
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
283
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2004
|
Annual Hours
|
27663
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
13
|
Avg. Employee Hours
|
2128
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2004
|
Annual Hours
|
8430
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
1686
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2003
|
Annual Hours
|
92950
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
32
|
Avg. Employee Hours
|
2905
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2003
|
Annual Hours
|
13183
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
2197
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2002
|
Annual Hours
|
38756
|
Avg. Annual Empl.
|
27
|
Avg. Employee Hours
|
1435
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2002
|
Annual Hours
|
6011
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
1202
|
|
|
Alamo
|
Facility
|
Abandoned
|
Coal (Bituminous)
|
|
Directions to Mine |
12 miles on Highway 66 From Pineville Kentucky
|
Parties
Name
|
Chas Coal LLC
|
Role
|
Operator
|
Start Date
|
2001-06-01
|
End Date
|
2009-05-25
|
|
Name
|
M3 Energy Resources, LLC
|
Role
|
Operator
|
Start Date
|
2010-07-28
|
End Date
|
2013-03-11
|
|
Name
|
Straight Creek Coal Mining, Inc
|
Role
|
Operator
|
Start Date
|
2013-03-12
|
|
Name
|
Sandy Fork Mining Company Inc
|
Role
|
Operator
|
Start Date
|
1974-10-02
|
End Date
|
1988-05-05
|
|
Name
|
Nally & Gibson Surfacing
|
Role
|
Operator
|
Start Date
|
1950-01-01
|
End Date
|
1974-10-01
|
|
Name
|
Andalex Resources Inc
|
Role
|
Operator
|
Start Date
|
1988-05-06
|
End Date
|
1993-12-15
|
|
Name
|
Ikerd-Bandy Company Inc
|
Role
|
Operator
|
Start Date
|
1997-10-30
|
End Date
|
2001-05-31
|
|
Name
|
Ikerd-Bandy Company Inc
|
Role
|
Operator
|
Start Date
|
1993-12-16
|
End Date
|
1997-10-29
|
|
Name
|
Jadco Enterprises Inc
|
Role
|
Operator
|
Start Date
|
2009-05-26
|
End Date
|
2010-07-27
|
|
Name
|
JW Resources Inc
|
Role
|
Current Controller
|
Start Date
|
2013-03-12
|
|
Name
|
Straight Creek Coal Mining, Inc
|
Role
|
Current Operator
|
|
Inspections
Start Date |
2023-09-07
|
End Date |
2023-09-07
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
2.25
|
|
Start Date |
2022-11-22
|
End Date |
2022-11-22
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
6.25
|
|
Start Date |
2022-04-19
|
End Date |
2022-04-19
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
10
|
|
Start Date |
2022-02-10
|
End Date |
2022-02-10
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
6
|
|
Start Date |
2021-11-23
|
End Date |
2021-11-23
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
4
|
|
Start Date |
2021-08-04
|
End Date |
2021-08-04
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
4
|
|
Start Date |
2021-06-29
|
End Date |
2021-06-29
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
6.5
|
|
Start Date |
2020-12-15
|
End Date |
2020-12-15
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
10
|
|
Start Date |
2020-04-13
|
End Date |
2020-04-13
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
6
|
|
Start Date |
2019-12-10
|
End Date |
2019-12-10
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
9
|
|
Start Date |
2019-06-20
|
End Date |
2019-06-20
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
8
|
|
Start Date |
2018-10-26
|
End Date |
2018-10-26
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
4.75
|
|
Start Date |
2018-06-29
|
End Date |
2018-06-29
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
5
|
|
Start Date |
2017-10-10
|
End Date |
2017-10-10
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
4
|
|
Start Date |
2017-07-07
|
End Date |
2017-07-07
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
6
|
|
Start Date |
2017-04-14
|
End Date |
2017-04-14
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
4.75
|
|
Start Date |
2016-11-17
|
End Date |
2016-11-17
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
7.5
|
|
Start Date |
2016-06-21
|
End Date |
2016-06-21
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
10
|
|
Start Date |
2016-03-10
|
End Date |
2016-03-10
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
3.5
|
|
Start Date |
2015-10-06
|
End Date |
2015-10-07
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
2.75
|
|
Productions
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2011
|
Annual Hours
|
320
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
160
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2010
|
Annual Hours
|
1018
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
339
|
|
|
Surface Mine
|
Underground
|
Abandoned
|
Coal (Bituminous)
|
|
Parties
Name
|
Cherokee Construction Corp
|
Role
|
Operator
|
Start Date
|
1974-11-02
|
|
Name
|
Ikerd-Bandy Company Inc
|
Role
|
Operator
|
Start Date
|
1974-01-01
|
End Date
|
1974-11-01
|
|
Name
|
Abner James H
|
Role
|
Current Controller
|
Start Date
|
1974-11-02
|
|
Name
|
Cherokee Construction Corp
|
Role
|
Current Operator
|
|
|
#1 Shop
|
Surface
|
Abandoned
|
Coal (Bituminous)
|
|
Parties
Name
|
Chas Coal Llc
|
Role
|
Operator
|
Start Date
|
2001-06-01
|
|
Name
|
Sandy Fork Mining Company Inc
|
Role
|
Operator
|
Start Date
|
1974-12-27
|
End Date
|
1988-05-05
|
|
Name
|
Andalex Resources Inc
|
Role
|
Operator
|
Start Date
|
1988-05-06
|
End Date
|
1993-12-15
|
|
Name
|
Ikerd-Bandy Company Inc
|
Role
|
Operator
|
Start Date
|
1993-12-16
|
End Date
|
2001-05-31
|
|
Name
|
Broe Companies Inc
|
Role
|
Current Controller
|
Start Date
|
2001-06-01
|
|
Name
|
Chas Coal Llc
|
Role
|
Current Operator
|
|
|
Perry County #1 Strip
|
Surface
|
Abandoned
|
Coal (Bituminous)
|
|
Parties
Name
|
Tesoro Coal Company
|
Role
|
Operator
|
Start Date
|
1975-01-31
|
End Date
|
1984-05-13
|
|
Name
|
Whitaker Coal Corp
|
Role
|
Operator
|
Start Date
|
1984-05-14
|
End Date
|
1994-06-30
|
|
Name
|
Ikerd-Bandy Company Inc
|
Role
|
Operator
|
Start Date
|
1997-10-30
|
|
Name
|
Cockrell'S Fork Mining
|
Role
|
Operator
|
Start Date
|
1994-07-01
|
End Date
|
1997-10-29
|
|
Name
|
Horizon Natural Resources Incorporated
|
Role
|
Current Controller
|
Start Date
|
1997-10-30
|
|
Name
|
Ikerd-Bandy Company Inc
|
Role
|
Current Operator
|
|
|
Wahoo Loadout
|
Facility
|
Abandoned
|
Coal (Bituminous)
|
|
Directions to Mine |
1 mile east of Bonnyman, KY.
|
Parties
Name
|
Knott County Coal, LLC
|
Role
|
Operator
|
Start Date
|
2016-04-12
|
|
Name
|
Tesoro Coal Company
|
Role
|
Operator
|
Start Date
|
1975-01-01
|
End Date
|
1986-03-03
|
|
Name
|
Whitaker Coal Corp
|
Role
|
Operator
|
Start Date
|
1986-03-04
|
End Date
|
1994-06-30
|
|
Name
|
Ikerd-Bandy Company Inc
|
Role
|
Operator
|
Start Date
|
1997-10-30
|
End Date
|
2016-04-11
|
|
Name
|
Cockrell'S Fork Mining
|
Role
|
Operator
|
Start Date
|
1994-07-01
|
End Date
|
1997-10-29
|
|
Name
|
American Resources Corporation
|
Role
|
Current Controller
|
Start Date
|
2016-04-12
|
|
Name
|
Knott County Coal, LLC
|
Role
|
Current Operator
|
|
Inspections
Start Date |
2003-04-02
|
End Date |
2003-04-02
|
Activity |
MINE IDLE
|
Number Inspectors |
1
|
Total Hours |
3
|
|
Start Date |
2002-12-16
|
End Date |
2002-12-16
|
Activity |
Regular Inspection
|
Number Inspectors |
1
|
Total Hours |
4
|
|
Start Date |
2002-10-09
|
End Date |
2002-10-09
|
Activity |
SPOT INSPECTION
|
Number Inspectors |
1
|
Total Hours |
2
|
|
Start Date |
2002-06-28
|
End Date |
2002-06-28
|
Activity |
Regular Inspection
|
Number Inspectors |
1
|
Total Hours |
6
|
|
Start Date |
2002-02-22
|
End Date |
2002-02-22
|
Activity |
MINE IDLE
|
Number Inspectors |
1
|
Total Hours |
6
|
|
Start Date |
2001-09-26
|
End Date |
2001-09-26
|
Activity |
MINE IDLE
|
Number Inspectors |
1
|
Total Hours |
4
|
|
Start Date |
2001-01-19
|
End Date |
2001-01-23
|
Activity |
Regular Inspection
|
Number Inspectors |
1
|
Total Hours |
14
|
|
Start Date |
2000-08-10
|
End Date |
2000-08-10
|
Activity |
MINE IDLE
|
Number Inspectors |
1
|
Total Hours |
4
|
|
Start Date |
2000-04-13
|
End Date |
2000-04-13
|
Activity |
MINE IDLE
|
Number Inspectors |
1
|
Total Hours |
4
|
|
|
Meadow Creek
|
Surface
|
Abandoned
|
Coal (Bituminous)
|
|
Parties
Name
|
Ikerd-Bandy Company Inc
|
Role
|
Operator
|
Start Date
|
1976-06-28
|
End Date
|
1985-02-14
|
|
Name
|
Ikerd-Bandy Company Inc
|
Role
|
Operator
|
Start Date
|
1985-02-15
|
|
Name
|
James J Kocian
|
Role
|
Current Controller
|
Start Date
|
1985-02-15
|
|
Name
|
Ikerd-Bandy Company Inc
|
Role
|
Current Operator
|
|
|
Buffalo #3
|
Surface
|
Abandoned and Sealed
|
Coal (Bituminous)
|
|
Parties
Name
|
Ikerd-Bandy Company Inc
|
Role
|
Operator
|
Start Date
|
1977-08-01
|
End Date
|
1985-02-14
|
|
Name
|
Ikerd-Bandy Company Inc
|
Role
|
Operator
|
Start Date
|
1985-02-15
|
|
Name
|
James J Kocian
|
Role
|
Current Controller
|
Start Date
|
1985-02-15
|
|
Name
|
Ikerd-Bandy Company Inc
|
Role
|
Current Operator
|
|
|
Manchester Tipple
|
Facility
|
Abandoned
|
Coal (Bituminous)
|
|
Directions to Mine |
1 mile south of Manchester on Hwy 11
|
Parties
Name
|
B & W Resources Inc
|
Role
|
Operator
|
Start Date
|
2002-06-06
|
|
Name
|
Independence Tipple Company
|
Role
|
Operator
|
Start Date
|
1984-09-11
|
End Date
|
1987-03-08
|
|
Name
|
N E R Of Kentucky Inc
|
Role
|
Operator
|
Start Date
|
1980-08-28
|
End Date
|
1984-09-10
|
|
Name
|
Leslie Resources Inc
|
Role
|
Operator
|
Start Date
|
1998-03-09
|
End Date
|
2001-05-23
|
|
Name
|
Cargill-Johnson Coal Company
|
Role
|
Operator
|
Start Date
|
1978-08-01
|
End Date
|
1980-08-27
|
|
Name
|
Leslie Resources Inc
|
Role
|
Operator
|
Start Date
|
1995-07-11
|
End Date
|
1998-03-08
|
|
Name
|
Ikerd-Bandy Company Inc
|
Role
|
Operator
|
Start Date
|
1987-05-15
|
End Date
|
1995-07-10
|
|
Name
|
Tipple Services Inc
|
Role
|
Operator
|
Start Date
|
1987-03-09
|
End Date
|
1987-05-14
|
|
Name
|
Created Mining Llc
|
Role
|
Operator
|
Start Date
|
2001-05-24
|
End Date
|
2002-06-05
|
|
Name
|
Lipari Energy
|
Role
|
Current Controller
|
Start Date
|
2002-06-06
|
|
Name
|
B & W Resources Inc
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2018-07-19
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Over-exertion NEC
|
Ocupation |
Bulldozer operator, Universal operator, Heavy equipment operator, Operating engineer
|
Narrative |
The employee was working on realigning the tail pulley on a conveyor belt and twisted knee during the work process. The employee stated ee wasn't for sure if the accident occurred when ee got out of the truck or during the realignment process.
|
|
Accident Date |
2016-02-19
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Struck by... NEC
|
Ocupation |
Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech
|
Narrative |
Employee removed a hydraulic hose and got hydraulic fluid on EE's safety glasses and in EE's eye. After EE's eyes were flushed and cleaned, EE had blurred vision and was taken to an optometrist to be checked out. Blurred vision lasted for 2 days.
|
|
Accident Date |
2015-07-24
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Struck by... NEC
|
Ocupation |
Front-end loader, Scraper-loader operator, Pan operator, Payloader, Scraper rig operator
|
Narrative |
The employee was unpacking a new belt line for the raw coal belt. As he was removing a large zip tie with his pocket knife, the knife slipped stabbing him in his right forearm. The employee was taking to the hospital and released a short time later with no restrictions.
|
|
Accident Date |
2013-04-01
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Fall onto or against objects
|
Ocupation |
Pumper
|
Narrative |
while washing crusher and greasing bearing on platform, tripped over rock. Fell on handrail and hurt left side/ribs
|
|
Accident Date |
2013-03-29
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Fall to the walkway or working surface
|
Ocupation |
Haul/Off road/Coal/Ore/Pit/Quarry/Rock/Rubber tire truck driver, Transportation truck driver
|
Narrative |
Walking at tipple and tripped over loose shoe lace and fell landing on arm.
|
|
Accident Date |
2011-04-22
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Struck by... NEC
|
Ocupation |
Bulldozer operator, Universal operator, Heavy equipment operator, Operating engineer
|
Narrative |
Working on door of train and prybar slipped striking right side of forehead.
|
|
Accident Date |
2009-07-21
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Over-exertion NEC
|
Ocupation |
Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech
|
Narrative |
While changing a tire on a Lowboy trailer, a tire iron slipped, causing EE to injure his left shoulder. EE continured to work until 8/6/09. EE was diagnosed as having a strained muscle and returned to work on the same day as his diagnosis. No Lost Time.
|
|
Accident Date |
2007-01-15
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Contact with hot objects or substances
|
Ocupation |
Front-end loader, Scraper-loader operator, Pan operator, Payloader, Scraper rig operator
|
Narrative |
EE was in the process of cutting a beam with an acetylene torch when the oxygen hose came apart at the connection to the torch, causing a burn to his left hand. Diagnosis is pending.
|
|
Accident Date |
2004-04-21
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Fall from scaffolds, walkways, platforms
|
Ocupation |
Prep plant foreman, Supervisor, Mill plant supervisor, Kiln supervisor
|
Narrative |
EE WAS INSTALLING CONCRETE FORMS WHEN THE SCAFFOLDING ON WHICH HE WAS STANDING BECAME DISLODGED, CAUSING HIM TO FALL.
|
|
Accident Date |
2004-04-21
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Fall onto or against objects
|
Ocupation |
Laborer, Blacksmith, Bull gang, Parts runner, Roustabout, Pick-up man, Pitman
|
Narrative |
EE WAS ASSISTING THE CREW INSTALLING CONCRETE FORMS. THE SCAFFOLDING ON WHICH THE FOREMAN WAS STANDING BECAME DISLODGED, CAUSING THE FOREMAN TO FALL. AS HE FELL, HE STRUCK EE.
|
|
Inspections
Start Date |
2018-05-01
|
End Date |
2018-07-02
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
5
|
Total Hours |
82.5
|
|
Start Date |
2017-12-19
|
End Date |
2017-12-19
|
Activity |
Spot Inspection
|
Number Inspectors |
3
|
Total Hours |
13.75
|
|
Start Date |
2017-10-10
|
End Date |
2018-03-12
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
67
|
|
Start Date |
2017-05-25
|
End Date |
2017-06-07
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
21
|
|
Start Date |
2017-04-03
|
End Date |
2017-04-25
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
67.75
|
|
Start Date |
2017-03-20
|
End Date |
2017-03-20
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
10.5
|
|
Start Date |
2016-10-17
|
End Date |
2016-12-14
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
7.5
|
|
Start Date |
2016-10-03
|
End Date |
2016-10-13
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
65
|
|
Start Date |
2016-09-20
|
End Date |
2016-09-21
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
10.5
|
|
Start Date |
2016-05-02
|
End Date |
2016-06-27
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
46
|
|
Start Date |
2016-03-22
|
End Date |
2016-04-07
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
42.75
|
|
Start Date |
2015-10-01
|
End Date |
2016-02-05
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
28
|
|
Start Date |
2015-06-22
|
End Date |
2015-06-30
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
43.5
|
|
Start Date |
2015-03-31
|
End Date |
2015-04-10
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
34.5
|
|
Start Date |
2015-03-09
|
End Date |
2015-03-30
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
4
|
Total Hours |
100.5
|
|
Start Date |
2014-07-05
|
End Date |
2014-07-23
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
86.5
|
|
Start Date |
2014-03-10
|
End Date |
2014-03-20
|
Activity |
Spot Inspection
|
Number Inspectors |
3
|
Total Hours |
29.5
|
|
Start Date |
2013-12-23
|
End Date |
2014-01-09
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
60.75
|
|
Start Date |
2013-10-23
|
End Date |
2013-10-23
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
10
|
|
Start Date |
2013-10-07
|
End Date |
2013-10-17
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
14.5
|
|
Productions
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2018
|
Annual Hours
|
9326
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
1865
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2018
|
Annual Hours
|
10178
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
1454
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2017
|
Annual Hours
|
11753
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
2351
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2017
|
Annual Hours
|
12480
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
2080
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2016
|
Annual Hours
|
11828
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
1971
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2016
|
Annual Hours
|
14809
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
2116
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2015
|
Annual Hours
|
9834
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
2459
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2015
|
Annual Hours
|
16256
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
11
|
Avg. Employee Hours
|
1478
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2014
|
Annual Hours
|
18373
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
2625
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2013
|
Annual Hours
|
18067
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
2581
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2012
|
Annual Hours
|
19586
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
8
|
Avg. Employee Hours
|
2448
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2011
|
Annual Hours
|
24315
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
9
|
Avg. Employee Hours
|
2702
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2010
|
Annual Hours
|
16651
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
2775
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2010
|
Annual Hours
|
11792
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
12
|
Avg. Employee Hours
|
983
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2009
|
Annual Hours
|
11379
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
2845
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2009
|
Annual Hours
|
22476
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
11
|
Avg. Employee Hours
|
2043
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2008
|
Annual Hours
|
9531
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
3177
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2008
|
Annual Hours
|
590
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
590
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2007
|
Annual Hours
|
10663
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
2133
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2007
|
Annual Hours
|
2400
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1200
|
|
|
Grove Prep Plant
|
Facility
|
Abandoned
|
Coal (Bituminous)
|
|
Parties
Name
|
Ikerd-Bandy Company Inc
|
Role
|
Operator
|
Start Date
|
1979-06-22
|
|
Name
|
Grove Coal Company
|
Role
|
Operator
|
Start Date
|
1978-08-01
|
End Date
|
1979-06-21
|
|
Name
|
Kaneb Services Inc
|
Role
|
Current Controller
|
Start Date
|
1979-06-22
|
|
Name
|
Ikerd-Bandy Company Inc
|
Role
|
Current Operator
|
|
|
No 1 Tipple
|
Facility
|
Abandoned
|
Coal (Bituminous)
|
|
Parties
Name
|
Ikerd-Bandy Company Inc
|
Role
|
Operator
|
Start Date
|
1982-05-24
|
End Date
|
1983-03-31
|
|
Name
|
Warren & Jasper Inc
|
Role
|
Operator
|
Start Date
|
1979-10-03
|
End Date
|
1982-05-23
|
|
Name
|
Brown Energy Company Inc
|
Role
|
Operator
|
Start Date
|
1978-10-01
|
End Date
|
1979-10-02
|
|
Name
|
Jasper & Associates Inc
|
Role
|
Operator
|
Start Date
|
1983-04-01
|
End Date
|
1984-05-09
|
|
Name
|
Regal Energy Inc
|
Role
|
Operator
|
Start Date
|
1984-05-10
|
|
Name
|
Zieverink Joseph
|
Role
|
Current Controller
|
Start Date
|
1984-05-10
|
|
Name
|
Regal Energy Inc
|
Role
|
Current Operator
|
|
|
Laurel Co #1 Strip
|
Surface
|
Abandoned
|
Coal (Bituminous)
|
|
Parties
Name
|
Ikerd-Bandy Company Inc
|
Role
|
Operator
|
Start Date
|
1979-04-01
|
End Date
|
1985-02-14
|
|
Name
|
Ikerd-Bandy Company Inc
|
Role
|
Operator
|
Start Date
|
1985-02-15
|
|
Name
|
James J Kocian
|
Role
|
Current Controller
|
Start Date
|
1985-02-15
|
|
Name
|
Ikerd-Bandy Company Inc
|
Role
|
Current Operator
|
|
|
P-9A Red Bird
|
Surface
|
NonProducing
|
Coal (Bituminous)
|
|
Directions to Mine |
Turn left on 25E South, travel 12.5 miles to Hwy. 66. Turn left travel 20 miles, mine location is on left side of Hwy.
|
Parties
Name
|
Century Operations LLC
|
Role
|
Operator
|
Start Date
|
2005-01-14
|
End Date
|
2009-05-19
|
|
Name
|
Chas Coal Llc
|
Role
|
Operator
|
Start Date
|
2001-06-01
|
End Date
|
2005-01-13
|
|
Name
|
Xinergy Corp.
|
Role
|
Operator
|
Start Date
|
2012-04-20
|
End Date
|
2013-02-06
|
|
Name
|
M3 Energy Resources, LLC
|
Role
|
Operator
|
Start Date
|
2010-07-28
|
End Date
|
2012-04-19
|
|
Name
|
Straight Creek Coal Mining, Inc.
|
Role
|
Operator
|
Start Date
|
2013-02-07
|
End Date
|
2015-11-18
|
|
Name
|
Cardinal Reclamation Company, LLC
|
Role
|
Operator
|
Start Date
|
2021-10-21
|
|
Name
|
Sandy Fork Mining Company Inc
|
Role
|
Operator
|
Start Date
|
1979-09-01
|
End Date
|
1988-05-05
|
|
Name
|
Andalex Resources Inc
|
Role
|
Operator
|
Start Date
|
1988-05-06
|
End Date
|
1993-12-15
|
|
Name
|
Ikerd-Bandy Company Inc
|
Role
|
Operator
|
Start Date
|
1997-10-30
|
End Date
|
2001-05-31
|
|
Name
|
Ikerd-Bandy Company Inc
|
Role
|
Operator
|
Start Date
|
1993-12-16
|
End Date
|
1997-10-29
|
|
Name
|
Jadco Enterprises Inc
|
Role
|
Operator
|
Start Date
|
2009-05-20
|
End Date
|
2010-07-27
|
|
Name
|
Revelation Energy, LLC
|
Role
|
Operator
|
Start Date
|
2015-11-19
|
End Date
|
2021-10-20
|
|
Name
|
David Michael Jamison; Petri E Koivula
|
Role
|
Current Controller
|
Start Date
|
2021-10-21
|
|
Name
|
Cardinal Reclamation Company, LLC
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2010-08-24
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Struck by flying object
|
Ocupation |
Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech
|
Narrative |
Employee was hitting on a track pin when a piece of metal hit him under the chin. Medical treatment was provided to remove the metal.
|
|
Accident Date |
2009-07-31
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Over-exertion NEC
|
Ocupation |
Warehouseman, Bagger, Palletizer/Stacker, Store keeper, Packager, Fabricator, Cleaning plant operator
|
Narrative |
Employee was working on a screen in the plant when his knee pain worsen.
|
|
Accident Date |
2007-07-06
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Struck against a moving object
|
Ocupation |
Laborer, Blacksmith, Bull gang, Parts runner, Roustabout, Pick-up man, Pitman
|
Narrative |
Two men were tied off in the basket of a manlift approx. 15' in the air. They went to swing the basket in closer to the concrete forms on the stacking tube. The basket moved quickly causing injured to hit his lower back against the rail of the basket.
|
|
Accident Date |
2006-07-26
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Over-exertion in lifting objects
|
Ocupation |
Electrician, Lineman
|
Narrative |
Employee was taking oil bath off of motor on top floor of washer. Employee said he lifted oil bath off and felt sharp pain in lower back.
|
|
Accident Date |
2000-03-21
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Fall from ladders
|
Ocupation |
Laborer, Blacksmith, Bull gang, Parts runner, Roustabout, Pick-up man, Pitman
|
Narrative |
EMPLOYEE WAS STANDING ON A LADDER WITH A PIECE OF METAL IN HIS HANDS. HIS FOOT SLIPPED AND HE PULLED A MUSCLE IN HIS BACK.
|
|
Inspections
Start Date |
2024-10-28
|
End Date |
2024-10-28
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
4.5
|
|
Start Date |
2024-08-19
|
End Date |
2024-08-19
|
Activity |
Impoundment Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
8.5
|
|
Start Date |
2024-06-03
|
End Date |
2024-06-03
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
9.5
|
|
Start Date |
2024-03-19
|
End Date |
2024-03-19
|
Activity |
Impoundment Spot Inspection
|
Number Inspectors |
2
|
Total Hours |
18
|
|
Start Date |
2023-11-03
|
End Date |
2023-12-13
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
11.5
|
|
Start Date |
2023-09-20
|
End Date |
2023-09-20
|
Activity |
Impoundment Spot Inspection
|
Number Inspectors |
0
|
Total Hours |
0
|
|
Start Date |
2023-04-05
|
End Date |
2023-04-10
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
11.25
|
|
Start Date |
2023-03-27
|
End Date |
2023-03-27
|
Activity |
Impoundment Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
9.5
|
|
Start Date |
2023-03-07
|
End Date |
2023-03-08
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
10
|
|
Start Date |
2022-11-17
|
End Date |
2022-11-17
|
Activity |
Impoundment Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
7.25
|
|
Start Date |
2022-08-03
|
End Date |
2022-08-17
|
Activity |
Impoundment Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
10
|
|
Start Date |
2022-05-25
|
End Date |
2022-05-25
|
Activity |
Impoundment Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
7
|
|
Start Date |
2022-05-11
|
End Date |
2022-05-11
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
8
|
|
Start Date |
2022-02-02
|
End Date |
2022-02-02
|
Activity |
Impoundment Spot Inspection
|
Number Inspectors |
2
|
Total Hours |
12
|
|
Start Date |
2022-01-14
|
End Date |
2022-01-14
|
Activity |
Impoundment Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
8
|
|
Start Date |
2021-11-08
|
End Date |
2021-12-08
|
Activity |
Impoundment Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
9.5
|
|
Start Date |
2021-11-01
|
End Date |
2021-11-01
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
5
|
|
Start Date |
2021-10-04
|
End Date |
2021-10-04
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
6.5
|
|
Start Date |
2021-09-29
|
End Date |
2021-09-29
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
8
|
|
Start Date |
2021-08-26
|
End Date |
2021-08-26
|
Activity |
Spot Inspection
|
Number Inspectors |
3
|
Total Hours |
21.25
|
|
Productions
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2018
|
Annual Hours
|
1248
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1248
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2017
|
Annual Hours
|
192
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
192
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2013
|
Annual Hours
|
2150
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
430
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2012
|
Annual Hours
|
960
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
480
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2011
|
Annual Hours
|
2000
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
400
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2011
|
Annual Hours
|
60
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
60
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2010
|
Annual Hours
|
9629
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
9
|
Avg. Employee Hours
|
1070
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2009
|
Annual Hours
|
14371
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
9
|
Avg. Employee Hours
|
1597
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2008
|
Annual Hours
|
31425
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
18
|
Avg. Employee Hours
|
1746
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2008
|
Annual Hours
|
18394
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
11
|
Avg. Employee Hours
|
1672
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2007
|
Annual Hours
|
30061
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
15
|
Avg. Employee Hours
|
2004
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2007
|
Annual Hours
|
16138
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
11
|
Avg. Employee Hours
|
1467
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2006
|
Annual Hours
|
39983
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
17
|
Avg. Employee Hours
|
2352
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2005
|
Annual Hours
|
35930
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
13
|
Avg. Employee Hours
|
2764
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2003
|
Annual Hours
|
41276
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
14
|
Avg. Employee Hours
|
2948
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2002
|
Annual Hours
|
17424
|
Avg. Annual Empl.
|
10
|
Avg. Employee Hours
|
1742
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2001
|
Annual Hours
|
8364
|
Avg. Annual Empl.
|
18
|
Avg. Employee Hours
|
465
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2000
|
Annual Hours
|
2877
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
411
|
|
|
No 2 Tipple
|
Facility
|
Abandoned
|
Coal (Bituminous)
|
|
Parties
Name
|
Ikerd-Bandy Company Inc
|
Role
|
Operator
|
Start Date
|
1982-08-23
|
End Date
|
1983-03-31
|
|
Name
|
Tenkiller Mining Services Inc
|
Role
|
Operator
|
Start Date
|
1980-07-01
|
End Date
|
1982-08-22
|
|
Name
|
Jasper & Associates Inc
|
Role
|
Operator
|
Start Date
|
1983-04-01
|
|
Name
|
Danny Jasper
|
Role
|
Current Controller
|
Start Date
|
1983-04-01
|
|
Name
|
Jasper & Associates Inc
|
Role
|
Current Operator
|
|
|
#15 Strip
|
Surface
|
Abandoned
|
Coal (Bituminous)
|
|
Parties
Name
|
Ikerd-Bandy Company Inc
|
Role
|
Operator
|
Start Date
|
1987-07-01
|
|
Name
|
James J Kocian
|
Role
|
Current Controller
|
Start Date
|
1987-07-01
|
|
Name
|
Ikerd-Bandy Company Inc
|
Role
|
Current Operator
|
|
|
Leslie Co #1 Strip
|
Surface
|
Abandoned
|
Coal (Bituminous)
|
|
Parties
Name
|
Leslie Energy Inc
|
Role
|
Operator
|
Start Date
|
1989-10-11
|
End Date
|
1990-01-18
|
|
Name
|
Mel-Ash Coal Corp
|
Role
|
Operator
|
Start Date
|
1988-03-01
|
End Date
|
1989-10-10
|
|
Name
|
Ikerd-Bandy Company Inc
|
Role
|
Operator
|
Start Date
|
1990-12-05
|
|
Name
|
Leslie Energy Inc
|
Role
|
Operator
|
Start Date
|
1990-01-19
|
End Date
|
1990-12-04
|
|
Name
|
James J Kocian
|
Role
|
Current Controller
|
Start Date
|
1990-12-05
|
|
Name
|
Ikerd-Bandy Company Inc
|
Role
|
Current Operator
|
|
|
Bear Branch #1
|
Surface
|
Abandoned
|
Coal (Bituminous)
|
|
Parties
Name
|
Ace Coal Company Inc
|
Role
|
Operator
|
Start Date
|
1990-11-01
|
End Date
|
1991-07-21
|
|
Name
|
Andalex Resources Inc
|
Role
|
Operator
|
Start Date
|
1991-07-22
|
End Date
|
1993-04-29
|
|
Name
|
Ikerd-Bandy Company Inc
|
Role
|
Operator
|
Start Date
|
1997-10-30
|
|
Name
|
Ikerd-Bandy Company Inc
|
Role
|
Operator
|
Start Date
|
1994-09-29
|
End Date
|
1997-10-29
|
|
Name
|
C & D Bulldozing & Excavating Company
|
Role
|
Operator
|
Start Date
|
1993-04-30
|
End Date
|
1994-09-28
|
|
Name
|
Horizon Natural Resources Incorporated
|
Role
|
Current Controller
|
Start Date
|
1997-10-30
|
|
Name
|
Ikerd-Bandy Company Inc
|
Role
|
Current Operator
|
|
|
Clay Co #3 Strip
|
Surface
|
Abandoned
|
Coal (Bituminous)
|
|
Parties
Name
|
Ikerd-Bandy Company Inc
|
Role
|
Operator
|
Start Date
|
1994-01-01
|
|
Name
|
James J Kocian
|
Role
|
Current Controller
|
Start Date
|
1994-01-01
|
|
Name
|
Ikerd-Bandy Company Inc
|
Role
|
Current Operator
|
|
|