Name: | HOLSTON MINING, INC. |
Legal type: | Foreign Corporation |
Status: | Inactive |
Standing: | Good |
Profit or Non-Profit: | Profit |
File Date: | 12 Jan 1988 (37 years ago) |
Authority Date: | 12 Jan 1988 (37 years ago) |
Last Annual Report: | 17 Jun 2009 (16 years ago) |
Organization Number: | 0238624 |
Principal Office: | THE BRINK'S COMPANY, 1801 BAYBERRY COURT, PO BOX 18100, ATTN: GENERAL COUNSEL, RICHMOND, VA 23226 |
Place of Formation: | WEST VIRGINIA |
Name | Role |
---|---|
Lisa M. Landry | Assistant Treasurer |
Name | Role |
---|---|
McALISTER C MARSHALL, II | Director |
KEVIN A. QUINN | Director |
GAROLD R. SPINDLER | Director |
MICHAEL T DAN | Director |
FRANK T LENNON | Director |
Name | Role |
---|---|
CHARLES Q. GAGE | Incorporator |
Name | Role |
---|---|
David C Fields | President |
Name | Role |
---|---|
Elizabeth C. Restivo | Secretary |
Name | Role |
---|---|
Robert A McGregor | Vice President |
Frank T. Lennon | Vice President |
Name | Role |
---|---|
KY SECRETARY OF STATE | Registered Agent |
Name | File Date |
---|---|
App. for Certificate of Withdrawal | 2009-07-20 |
Annual Report | 2009-06-17 |
Registered Agent name/address change | 2008-10-14 |
Principal Office Address Change | 2008-07-07 |
Annual Report | 2008-06-26 |
Annual Report | 2007-05-03 |
Annual Report | 2006-06-30 |
Annual Report | 2005-05-26 |
Annual Report | 2003-09-03 |
Annual Report | 2002-08-26 |
Mine Name | Type | Status | Primary Sic | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Bent Branch Plant | Facility | Abandoned | Coal (Bituminous) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Name | Sidney Coal Company, LLC |
Role | Operator |
Start Date | 2002-07-22 |
End Date | 2018-02-15 |
Name | Matergy, Inc. |
Role | Operator |
Start Date | 2018-02-16 |
Name | Holston Mining Inc |
Role | Operator |
Start Date | 1990-07-23 |
End Date | 2002-07-21 |
Name | Utility Coals Company |
Role | Operator |
Start Date | 1988-08-24 |
End Date | 1990-07-22 |
Name | Gex Land Company |
Role | Operator |
Start Date | 1978-10-01 |
End Date | 1988-08-23 |
Name | Paul Snyder |
Role | Current Controller |
Start Date | 2018-02-16 |
Name | Matergy, Inc. |
Role | Current Operator |
Accidents
Accident Date | 2001-01-26 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Struck against a moving object |
Ocupation | Bulldozer operator, Universal operator, Heavy equipment operator, Operating engineer |
Narrative | EE STATED HE WAS BACKING THE DOZER FROM A COAL PILE THAT MEASURED 3' HIGH AND AS THE REAR OF THE DOZER NEARED THE EDGE OF THE SMALL PILE, THE DOZER TIPPED, CAUSING THE REAR OF THE DOZER TO STR IKE THE CONCRETE PAD. EE STATED, WHEN THE DOZER STRUCK THE CONCRETE PAD HE WAS JARRED IN THE DOZER'S SEAT. |
Accident Date | 2000-01-14 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Fall to the walkway or working surface |
Ocupation | Warehouseman, Bagger, Palletizer/Stacker, Store keeper, Packager, Fabricator, Cleaning plant operator |
Narrative | ON 01-14-00 EMPLOYEE REPORTED THAT HE FELL AT A FLOOR DRAIN AND STATED THAT HE WAS NOT INJURED. HE CONTINUED TO WORK REGULAR UNTIL 02-18-00 WHEN HE INFORMED MANAGEMENT THAT HE WAS EXPERIENCING KNEE AND BACK PAIN FROM THE 01-14-00 INCIDENT. WENT TO DOCTOR 03-02-00 DID NOT TAKE OFF WEEK AS DOCTOR SUGGESTED. THIS EMPLOYEE HAD PREVIOUS NON WORK RELATED INJURY AND COMPANY WAITING ON POS |
Inspections
Start Date | 2022-08-25 |
End Date | 2022-08-30 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 9 |
Start Date | 2021-10-05 |
End Date | 2022-01-18 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 2 |
Total Hours | 28 |
Start Date | 2021-04-05 |
End Date | 2021-09-01 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 2 |
Total Hours | 59.5 |
Start Date | 2020-10-05 |
End Date | 2021-03-09 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 2 |
Total Hours | 59 |
Start Date | 2020-04-13 |
End Date | 2020-09-14 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 2 |
Total Hours | 95.75 |
Start Date | 2020-01-24 |
End Date | 2020-02-10 |
Activity | Impoundment Spot Inspection |
Number Inspectors | 1 |
Total Hours | 17 |
Start Date | 2019-10-21 |
End Date | 2020-02-10 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 2 |
Total Hours | 27 |
Start Date | 2019-08-14 |
End Date | 2019-08-21 |
Activity | Impoundment Spot Inspection |
Number Inspectors | 1 |
Total Hours | 20 |
Start Date | 2019-05-07 |
End Date | 2019-09-18 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 2 |
Total Hours | 23.75 |
Start Date | 2019-01-15 |
End Date | 2019-01-17 |
Activity | Impoundment Spot Inspection |
Number Inspectors | 1 |
Total Hours | 16 |
Start Date | 2018-10-01 |
End Date | 2018-10-12 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 2 |
Total Hours | 26.5 |
Start Date | 2018-08-07 |
End Date | 2018-08-07 |
Activity | Spot Inspection |
Number Inspectors | 1 |
Total Hours | 8 |
Start Date | 2018-07-10 |
End Date | 2018-07-27 |
Activity | Impoundment Spot Inspection |
Number Inspectors | 1 |
Total Hours | 17 |
Start Date | 2018-04-04 |
End Date | 2018-05-01 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 2 |
Total Hours | 21.25 |
Start Date | 2018-02-16 |
End Date | 2018-02-28 |
Activity | Impoundment Spot Inspection |
Number Inspectors | 1 |
Total Hours | 12 |
Start Date | 2018-02-12 |
End Date | 2018-02-13 |
Activity | Spot Inspection |
Number Inspectors | 1 |
Total Hours | 5 |
Start Date | 2017-10-16 |
End Date | 2018-03-15 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 4 |
Total Hours | 30.25 |
Start Date | 2017-09-06 |
End Date | 2017-09-08 |
Activity | Impoundment Spot Inspection |
Number Inspectors | 1 |
Total Hours | 10.75 |
Start Date | 2017-05-17 |
End Date | 2017-06-13 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 2 |
Total Hours | 23.5 |
Start Date | 2017-02-21 |
End Date | 2017-02-24 |
Activity | Impoundment Spot Inspection |
Number Inspectors | 1 |
Total Hours | 17 |
Productions
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2019 |
Annual Hours | 60 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 1 |
Avg. Employee Hours | 60 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2018 |
Annual Hours | 240 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 1 |
Avg. Employee Hours | 240 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2003 |
Annual Hours | 535 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 2 |
Avg. Employee Hours | 268 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2002 |
Annual Hours | 21355 |
Avg. Annual Empl. | 10 |
Avg. Employee Hours | 2136 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2001 |
Annual Hours | 33409 |
Avg. Annual Empl. | 17 |
Avg. Employee Hours | 1965 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2000 |
Annual Hours | 37265 |
Avg. Annual Empl. | 17 |
Avg. Employee Hours | 2192 |
Parties
Name | Holston Mining Inc |
Role | Operator |
Start Date | 1991-10-01 |
Name | Pittston Company |
Role | Current Controller |
Start Date | 1991-10-01 |
Name | Holston Mining Inc |
Role | Current Operator |
Sources: Kentucky Secretary of State