Flag Ridge
|
Surface
|
Abandoned
|
Coal (Bituminous)
|
|
Directions to Mine |
Field Office travel to 11 South @ Barbourville 11 South to 92 East turn left. 92 East to Harpe's Creek Rd (Approx 4 miles). Turn left onto Harpe's Creek Rd. go approximately 2.5 miles to Beech Bottom Church. Turn left onto mine haul road.
|
Parties
Name
|
Mountainside Coal Co., Inc.
|
Role
|
Operator
|
Start Date
|
2011-10-19
|
|
Name
|
Damian Caldwell
|
Role
|
Current Controller
|
Start Date
|
2011-10-19
|
|
Name
|
Mountainside Coal Co., Inc.
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2014-04-09
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Fall to the walkway or working surface
|
Ocupation |
Laborer, Blacksmith, Bull gang, Parts runner, Roustabout, Pick-up man, Pitman
|
Narrative |
The employee was watching another employee hydroseeding with the hose when the other employee lost his footing & stumbled & employee ran to assist the other employee, fell and rolled down the slope, pulling the muscles in his neck.
|
|
Accident Date |
2014-03-15
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Struck against a moving object
|
Ocupation |
Bulldozer operator, Universal operator, Heavy equipment operator, Operating engineer
|
Narrative |
The Dozer operator was tramming backward in a shot when the track slipped off of a boulder and injured his left side soft tissue in the rib area
|
|
Accident Date |
2012-10-26
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Struck by... NEC
|
Ocupation |
Bulldozer operator, Universal operator, Heavy equipment operator, Operating engineer
|
Narrative |
Employee turned the A/C unit on and an unidentified object flew into the employees eye.
|
|
Accident Date |
2012-07-12
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Over-exertion NEC
|
Ocupation |
Rotary bucket excavator operator
|
Narrative |
Employee was exiting the excavator, as he stepped down on the track he lost his balance due to the track being wet and twisted his left knee.
|
|
Inspections
Start Date |
2023-10-11
|
End Date |
2023-10-11
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
2.75
|
|
Start Date |
2023-08-09
|
End Date |
2023-08-09
|
Activity |
Mine Idle Activity
|
Number Inspectors |
2
|
Total Hours |
4
|
|
Start Date |
2022-10-12
|
End Date |
2022-10-12
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
1.75
|
|
Start Date |
2022-04-12
|
End Date |
2022-04-12
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
.75
|
|
Start Date |
2021-10-12
|
End Date |
2021-10-12
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
1.25
|
|
Start Date |
2021-05-11
|
End Date |
2021-05-11
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
9.5
|
|
Start Date |
2021-04-21
|
End Date |
2021-04-21
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
2.5
|
|
Start Date |
2021-03-25
|
End Date |
2021-03-25
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
1.75
|
|
Start Date |
2020-10-01
|
End Date |
2020-10-01
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
4.75
|
|
Start Date |
2020-04-10
|
End Date |
2020-04-10
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
1.75
|
|
Start Date |
2020-03-05
|
End Date |
2020-03-05
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
8.5
|
|
Start Date |
2019-06-12
|
End Date |
2019-06-12
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
5
|
|
Start Date |
2018-11-26
|
End Date |
2018-11-26
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
8
|
|
Start Date |
2018-04-02
|
End Date |
2018-06-25
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
24.25
|
|
Start Date |
2018-03-30
|
End Date |
2018-04-03
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
11.5
|
|
Start Date |
2018-03-29
|
End Date |
2018-03-29
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
6.5
|
|
Start Date |
2017-11-14
|
End Date |
2017-12-05
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
29.5
|
|
Start Date |
2017-11-13
|
End Date |
2017-11-13
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
11
|
|
Start Date |
2017-10-02
|
End Date |
2018-03-28
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
44.75
|
|
Start Date |
2017-09-12
|
End Date |
2017-09-25
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
44
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2018
|
Annual Hours
|
8217
|
Annual Coal Prod
|
25019
|
Avg. Annual Empl.
|
13
|
Avg. Employee Hours
|
632
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2017
|
Annual Hours
|
7087
|
Annual Coal Prod
|
28623
|
Avg. Annual Empl.
|
12
|
Avg. Employee Hours
|
591
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2015
|
Annual Hours
|
1163
|
Annual Coal Prod
|
593
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
582
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2014
|
Annual Hours
|
83016
|
Annual Coal Prod
|
176736
|
Avg. Annual Empl.
|
34
|
Avg. Employee Hours
|
2442
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2013
|
Annual Hours
|
71485
|
Annual Coal Prod
|
78485
|
Avg. Annual Empl.
|
27
|
Avg. Employee Hours
|
2648
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2013
|
Annual Hours
|
1560
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1560
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2012
|
Annual Hours
|
52798
|
Annual Coal Prod
|
93084
|
Avg. Annual Empl.
|
20
|
Avg. Employee Hours
|
2640
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2012
|
Annual Hours
|
1560
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1560
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2011
|
Annual Hours
|
226
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
57
|
|
|
Flat Creek Mine
|
Surface
|
Abandoned
|
Coal (Bituminous)
|
|
Directions to Mine |
Right on 25E North 4 miles to Hwy 11 South. Left 6.5 miles to Hwy 1530. Right 4 miles to Hwy 779. Right 2 miles to Hwy 1418. Right 2 miles mine entrance on right.
|
Parties
Name
|
Mountainside Coal Co., Inc.
|
Role
|
Operator
|
Start Date
|
2014-07-24
|
|
Name
|
Damian Caldwell
|
Role
|
Current Controller
|
Start Date
|
2014-07-24
|
|
Name
|
Mountainside Coal Co., Inc.
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2015-06-18
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Fall to the walkway or working surface
|
Ocupation |
Haul/Off road/Coal/Ore/Pit/Quarry/Rock/Rubber tire truck driver, Transportation truck driver
|
Narrative |
EE was attempting to pump water from the pond and as he was approaching the water pump, he fell in the spillway bruising his left elbow and left thigh
|
|
Accident Date |
2015-03-31
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Over-exertion NEC
|
Ocupation |
Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech
|
Narrative |
The serviceman had finished servicing the D10N Dozer, stepped off of the push arm, and while holding onto the handhold, he stepped onto the ground while turning around and twisted his back resulting in a muscle sprain.
|
|
Accident Date |
2015-03-12
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Over-exertion in lifting objects
|
Ocupation |
Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech
|
Narrative |
Mr. Hatfield had assisted in moving the port-a-potty, and upon entering his service truck, he experienced pain & a burning sensation in his hips and legs.
|
|
Accident Date |
2015-02-23
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Fall to the walkway or working surface
|
Ocupation |
Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech
|
Narrative |
The equipment serviceman slipped and fell on ice while servicing a light plant
|
|
Inspections
Start Date |
2016-10-19
|
End Date |
2016-11-30
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
8.5
|
|
Start Date |
2016-04-05
|
End Date |
2016-08-18
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
63
|
|
Start Date |
2016-03-30
|
End Date |
2016-03-30
|
Activity |
Spot Inspection
|
Number Inspectors |
2
|
Total Hours |
7.75
|
|
Start Date |
2015-12-14
|
End Date |
2016-02-26
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
3
|
Total Hours |
91.25
|
|
Start Date |
2015-08-31
|
End Date |
2015-09-23
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
55.25
|
|
Start Date |
2015-06-01
|
End Date |
2015-06-02
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
2
|
|
Start Date |
2015-05-20
|
End Date |
2015-05-20
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
10.5
|
|
Start Date |
2015-01-28
|
End Date |
2015-02-25
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
79.75
|
|
Start Date |
2015-01-15
|
End Date |
2015-01-15
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
5.25
|
|
Start Date |
2014-12-09
|
End Date |
2014-12-09
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
4.5
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2016
|
Annual Hours
|
36868
|
Annual Coal Prod
|
81376
|
Avg. Annual Empl.
|
27
|
Avg. Employee Hours
|
1365
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2015
|
Annual Hours
|
84242
|
Annual Coal Prod
|
60419
|
Avg. Annual Empl.
|
39
|
Avg. Employee Hours
|
2160
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2014
|
Annual Hours
|
10118
|
Annual Coal Prod
|
2261
|
Avg. Annual Empl.
|
22
|
Avg. Employee Hours
|
460
|
|
|
Eaton Town Mine
|
Surface
|
Temporarily Idled
|
Coal (Bituminous)
|
|
Directions to Mine |
Travel right on 25E North, travel 17.5 miles to Hwy 2041 (Corbin By-Pass). Turn left travel 4 miles to Hwy 26. Turn right Hwy 26 South travel 2.8 miles to Eaton School Rd. Turn right travel 1 mile mine located on left.
|
Parties
Name
|
Mountainside Coal Co Inc
|
Role
|
Operator
|
Start Date
|
2022-07-22
|
End Date
|
2023-08-28
|
|
Name
|
Harlan Construction & Excavation LLC
|
Role
|
Operator
|
Start Date
|
2018-05-22
|
End Date
|
2018-07-15
|
|
Name
|
Seven Earthmovers,LLC
|
Role
|
Operator
|
Start Date
|
2018-07-16
|
End Date
|
2018-09-27
|
|
Name
|
7 Enterprises LLC
|
Role
|
Operator
|
Start Date
|
2018-09-28
|
End Date
|
2019-09-16
|
|
Name
|
Civil, LLC
|
Role
|
Operator
|
Start Date
|
2019-09-17
|
End Date
|
2022-07-21
|
|
Name
|
Marlow Energy LLC
|
Role
|
Operator
|
Start Date
|
2023-08-29
|
|
Name
|
Derek W Marlow
|
Role
|
Current Controller
|
Start Date
|
2023-08-29
|
|
Name
|
Marlow Energy LLC
|
Role
|
Current Operator
|
|
Inspections
Start Date |
2024-10-01
|
End Date |
2024-10-01
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
10
|
|
Start Date |
2024-07-08
|
End Date |
2024-07-08
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
4.5
|
|
Start Date |
2024-02-08
|
End Date |
2024-02-08
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
5
|
|
Start Date |
2023-09-07
|
End Date |
2023-09-07
|
Activity |
Verbal Hazard Complaint Inspections
|
Number Inspectors |
1
|
Total Hours |
2.5
|
|
Start Date |
2023-07-07
|
End Date |
2023-08-14
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
3
|
Total Hours |
16.5
|
|
Start Date |
2023-06-02
|
End Date |
2023-06-02
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
13.5
|
|
Start Date |
2023-05-17
|
End Date |
2023-05-17
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
3
|
|
Start Date |
2023-02-15
|
End Date |
2023-02-21
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
17
|
|
Start Date |
2023-01-04
|
End Date |
2023-01-11
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
22.5
|
|
Start Date |
2022-10-03
|
End Date |
2022-10-03
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
4
|
|
Start Date |
2022-09-06
|
End Date |
2022-09-21
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
30.75
|
|
Start Date |
2022-04-25
|
End Date |
2022-04-25
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
1.75
|
|
Start Date |
2021-10-14
|
End Date |
2021-10-14
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
1.25
|
|
Start Date |
2021-05-03
|
End Date |
2021-05-03
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
1.75
|
|
Start Date |
2020-10-19
|
End Date |
2020-10-19
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
1.75
|
|
Start Date |
2020-04-08
|
End Date |
2020-04-08
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
1.5
|
|
Start Date |
2019-11-18
|
End Date |
2020-01-09
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
10.5
|
|
Start Date |
2018-10-23
|
End Date |
2018-11-20
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
22.25
|
|
Start Date |
2018-08-02
|
End Date |
2018-08-09
|
Activity |
Spot Inspection
|
Number Inspectors |
3
|
Total Hours |
20.5
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2023
|
Annual Hours
|
6973
|
Annual Coal Prod
|
1632
|
Avg. Annual Empl.
|
10
|
Avg. Employee Hours
|
697
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2022
|
Annual Hours
|
2275
|
Annual Coal Prod
|
2063
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
569
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2019
|
Annual Hours
|
4061
|
Annual Coal Prod
|
795
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
812
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2018
|
Annual Hours
|
3776
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
755
|
|
|