Name: | REEDY COAL CO., INC. |
Legal type: | Foreign Corporation |
Status: | Inactive |
Standing: | Bad |
Profit or Non-Profit: | Profit |
File Date: | 17 Jul 1992 (33 years ago) |
Authority Date: | 17 Jul 1992 (33 years ago) |
Last Annual Report: | 11 Aug 2011 (14 years ago) |
Organization Number: | 0303000 |
Principal Office: | P.O. BOX 3546, WISE, VA 24293 |
Place of Formation: | VIRGINIA |
Name | Role |
---|---|
KY SECRETARY OF STATE | Registered Agent |
Name | Role |
---|---|
WILLIS RING | Signature |
DEBRA RING | Signature |
Name | Role |
---|---|
Debra Ring | President |
Name | File Date |
---|---|
Agent Resignation | 2014-12-08 |
Revocation of Certificate of Authority | 2012-09-11 |
Annual Report | 2011-08-11 |
Annual Report | 2010-10-08 |
Annual Report | 2009-10-13 |
Annual Report | 2008-03-18 |
Annual Report | 2007-02-12 |
Annual Report | 2006-09-25 |
Annual Report | 2005-04-07 |
Annual Report | 2003-05-05 |
Mine Name | Type | Status | Primary Sic | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Mine No. 15 | Underground | Abandoned and Sealed | Coal (Bituminous) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Name | Reedy Coal Co., Inc. |
Role | Operator |
Start Date | 2002-04-22 |
Name | Willis Ring |
Role | Current Controller |
Start Date | 2002-04-22 |
Name | Reedy Coal Co., Inc. |
Role | Current Operator |
Accidents
Accident Date | 2003-01-28 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | No Value Found |
Ocupation | Discontinued 1/31/2014. Several other codes cover Scoop Car Operator |
Narrative | EMPLOYEE WAS ROCKDUSTING IN THE #4 ENTRY AS HE WAS WALKING TO HIS SCOOP TO GET ANOTHER BAG OF DUST, HE WAS HIT IN THE HEAD BY A PIECE OF ROCK MEASURING 3 BY 2 BY 2 THICK. |
Accident Date | 2002-11-11 |
Degree Inhury | ACCIDENT ONLY |
Accident Type | Accident type, without injuries |
Ocupation | NO VALUE FOUND |
Narrative | AN UNPLANNED ROOF FALL OCCURED IN THE #7 ENTRY OF THE MAIN INTAKE. OUTBY SPAD #334. THE FALL WAS SUPPORTED INBY AND OUTBY THE AFFECTED AREA. TWO ENTRY. ARE STILL OPEN IN THE INTAKE. |
Accident Date | 2002-10-03 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Struck by falling object |
Ocupation | Roof bolter, Rock bolter, Pinner, Mobile roof support operator (MRS) |
Narrative | EE WAS PREPARING TO BOLT WHEN A PIECE OF ROCK FELL FROM TOP, PINNING HIS HAND BETWEEN ROCK AND ROOF BOLTER. |
Accident Date | 2002-07-07 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Struck by... NEC |
Ocupation | Supply man, Supply worker, Nipper |
Narrative | EE WAS DRIVING A PIN INTO A BELT DRIVE CHAIN, WHEN A SMALL PIECE OF METAL CAME OUT AND LODGED INTO HIS LEFT EYE. |
Accident Date | 2002-06-10 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Struck against stationary object |
Ocupation | Supply man, Supply worker, Nipper |
Narrative | EMPLOYEE WAS WALKING TO END OF TRACK WHEN HE STRUCK A ROOF BOLT WITH HIS BACK. EMPLOYEE CLAIMS HIS BACK WAS INJURED. |
Inspections
Start Date | 2003-07-21 |
End Date | 2003-07-30 |
Activity | NOISE TECHNICAL INVESTIGATION |
Number Inspectors | 1 |
Total Hours | 2.5 |
Start Date | 2003-07-21 |
End Date | 2003-07-30 |
Activity | RESP DUST TECH INSP - U. G. MINES |
Number Inspectors | 1 |
Total Hours | 3.5 |
Start Date | 2003-07-01 |
End Date | 2003-09-03 |
Activity | Regular Inspection |
Number Inspectors | 1 |
Total Hours | 26 |
Start Date | 2003-04-22 |
End Date | 2003-04-28 |
Activity | RESP DUST TECH INSP - SURFACE MINES |
Number Inspectors | 1 |
Total Hours | 15 |
Start Date | 2003-04-09 |
End Date | 2003-06-04 |
Activity | RESP DUST TECH INSP - U. G. MINES |
Number Inspectors | 3 |
Total Hours | 31.5 |
Start Date | 2003-04-01 |
End Date | 2003-06-30 |
Activity | Regular Inspection |
Number Inspectors | 4 |
Total Hours | 92 |
Start Date | 2003-03-10 |
End Date | 2003-03-10 |
Activity | SPOT INSPECTION |
Number Inspectors | 1 |
Total Hours | 8 |
Start Date | 2003-03-03 |
End Date | 2003-03-27 |
Activity | RESP DUST TECH INSP - U. G. MINES |
Number Inspectors | 2 |
Total Hours | 20 |
Start Date | 2003-01-09 |
End Date | 2003-03-04 |
Activity | Regular Inspection |
Number Inspectors | 1 |
Total Hours | 91.5 |
Start Date | 2002-12-02 |
End Date | 2002-12-09 |
Activity | RESP DUST TECH INSP - SURFACE MINES |
Number Inspectors | 1 |
Total Hours | 15.5 |
Start Date | 2002-11-26 |
End Date | 2002-11-27 |
Activity | SPOT INSPECTION |
Number Inspectors | 2 |
Total Hours | 10 |
Start Date | 2002-10-30 |
End Date | 2002-11-06 |
Activity | RESP DUST TECH INSP - U. G. MINES |
Number Inspectors | 1 |
Total Hours | 17 |
Start Date | 2002-10-01 |
End Date | 2002-12-30 |
Activity | Regular Inspection |
Number Inspectors | 3 |
Total Hours | 106.5 |
Start Date | 2002-07-29 |
End Date | 2002-07-29 |
Activity | ROOF CONTROL TECHNICAL INSPECTION |
Number Inspectors | 1 |
Total Hours | 8 |
Start Date | 2002-07-01 |
End Date | 2002-09-18 |
Activity | Regular Inspection |
Number Inspectors | 1 |
Total Hours | 64 |
Start Date | 2002-07-01 |
End Date | 2002-07-18 |
Activity | RESP DUST TECH INSP - U. G. MINES |
Number Inspectors | 2 |
Total Hours | 29 |
Start Date | 2002-07-01 |
End Date | 2002-07-10 |
Activity | NOISE TECHNICAL INVESTIGATION |
Number Inspectors | 2 |
Total Hours | 15 |
Start Date | 2002-05-22 |
End Date | 2002-05-22 |
Activity | ROOF CONTROL TECHNICAL INSPECTION |
Number Inspectors | 0 |
Total Hours | 0 |
Start Date | 2002-05-15 |
End Date | 2002-05-15 |
Activity | ROOF CONTROL TECHNICAL INSPECTION |
Number Inspectors | 1 |
Total Hours | 8 |
Start Date | 2002-05-07 |
End Date | 2002-06-20 |
Activity | Regular Inspection |
Number Inspectors | 3 |
Total Hours | 59 |
Productions
Sub-Unit Desc | UNDERGROUND |
Year | 2003 |
Annual Hours | 43793 |
Annual Coal Prod | 245812 |
Avg. Annual Empl. | 60 |
Avg. Employee Hours | 730 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2003 |
Annual Hours | 3932 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 5 |
Avg. Employee Hours | 786 |
Sub-Unit Desc | UNDERGROUND |
Year | 2002 |
Annual Hours | 89460 |
Annual Coal Prod | 527567 |
Avg. Annual Empl. | 60 |
Avg. Employee Hours | 1491 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2002 |
Annual Hours | 8889 |
Avg. Annual Empl. | 4 |
Avg. Employee Hours | 2222 |
Sources: Kentucky Secretary of State