Name: | RANGER CONTRACTING, INC. |
Legal type: | Kentucky Corporation |
Status: | Inactive |
Standing: | Bad |
Profit or Non-Profit: | Profit |
File Date: | 07 Oct 1993 (32 years ago) |
Organization Date: | 07 Oct 1993 (32 years ago) |
Last Annual Report: | 19 Jun 2006 (19 years ago) |
Organization Number: | 0321184 |
ZIP code: | 41649 |
City: | Martin, Hite, Risner |
Primary County: | Floyd County |
Principal Office: | P.O. BOX 1427, MARTIN, KY 41649 |
Place of Formation: | KENTUCKY |
Authorized Shares: | 100 |
Name | Role |
---|---|
RONDAL REED | Signature |
Name | Role |
---|---|
SCOTT LYON | Director |
Name | Role |
---|---|
SCOTT LYON | Incorporator |
Name | Role |
---|---|
RONDAL REED | Registered Agent |
Name | Role |
---|---|
Rondal Reed | Sole Officer |
Name | File Date |
---|---|
Administrative Dissolution | 2007-11-01 |
Annual Report | 2006-06-19 |
Annual Report | 2005-09-27 |
Statement of Change | 2005-01-12 |
Reinstatement | 2004-12-06 |
Administrative Dissolution | 2002-11-01 |
Annual Report | 2001-09-11 |
Reinstatement | 2000-12-12 |
Administrative Dissolution | 2000-11-01 |
Annual Report | 2000-07-01 |
Mine Name | Type | Status | Primary Sic | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Buckeye Surface Mine | Surface | Abandoned | Coal (Bituminous) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Name | Ranger Contracting |
Role | Operator |
Start Date | 2001-05-01 |
Name | Rondall Reed |
Role | Current Controller |
Start Date | 2001-05-01 |
Name | Ranger Contracting |
Role | Current Operator |
Inspections
Start Date | 2003-01-14 |
End Date | 2003-01-14 |
Activity | Regular Inspection |
Number Inspectors | 1 |
Total Hours | 3 |
Start Date | 2002-10-09 |
End Date | 2002-10-09 |
Activity | SPOT INSPECTION |
Number Inspectors | 1 |
Total Hours | 2 |
Start Date | 2002-08-07 |
End Date | 2002-08-07 |
Activity | Regular Inspection |
Number Inspectors | 1 |
Total Hours | 8 |
Start Date | 2002-02-14 |
End Date | 2002-02-14 |
Activity | Regular Inspection |
Number Inspectors | 1 |
Total Hours | 4 |
Start Date | 2002-02-14 |
End Date | 2002-02-14 |
Activity | ACCIDENT PREVENTION SPOT INSPECTION |
Number Inspectors | 1 |
Total Hours | 2 |
Start Date | 2001-09-26 |
End Date | 2001-09-26 |
Activity | Regular Inspection |
Number Inspectors | 1 |
Total Hours | 5 |
Start Date | 2001-09-04 |
End Date | 2001-09-06 |
Activity | NOISE TECHNICAL INVESTIGATION |
Number Inspectors | 1 |
Total Hours | 8 |
Start Date | 2001-09-04 |
End Date | 2001-09-13 |
Activity | RESP DUST TECH INSP - SURFACE MINES |
Number Inspectors | 1 |
Total Hours | 11 |
Start Date | 2001-06-07 |
End Date | 2001-06-07 |
Activity | SPOT INSPECTION |
Number Inspectors | 1 |
Total Hours | 2 |
Productions
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2001 |
Annual Hours | 7498 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 11 |
Avg. Employee Hours | 682 |
Directions to Mine | U.S. 23 South to 1469 (Virgie) Penny Road to Rt. 122 - Turn right onto Anderson Fork - Approximately 1.2 miles to mine. |
Parties
Name | Premier Elkhorn Coal Company |
Role | Operator |
Start Date | 2001-09-01 |
End Date | 2001-10-08 |
Name | South Akers Mining, LLC |
Role | Operator |
Start Date | 2001-12-18 |
End Date | 2013-07-17 |
Name | Ranger Contracting |
Role | Operator |
Start Date | 2013-07-18 |
Name | Kay & Kay Contracting, LLC |
Role | Operator |
Start Date | 2001-10-09 |
End Date | 2001-12-17 |
Name | Rondall Reed |
Role | Current Controller |
Start Date | 2013-07-18 |
Name | Ranger Contracting |
Role | Current Operator |
Accidents
Accident Date | 2011-10-19 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Struck by... NEC |
Ocupation | Laborer, Bull gang, Parts runner, Roustabout, Roof trimmer/scaler |
Narrative | EE was changing places when the hook on the boom of the miner came loose striking him on the left arm. There forth causing a knot to come up. |
Accident Date | 2011-10-17 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Struck by falling object |
Ocupation | Discontinued 1/31/2014. Several other codes cover Scoop Car Operator |
Narrative | EE was attempting to get drill steel out of the top when steel fell approx 3 1/2 foot striking the head of the bolter, causing the steel to bounce back and hitting him in the head. |
Accident Date | 2011-09-27 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Over-exertion in pulling or pushing objects |
Ocupation | Laborer, Bull gang, Parts runner, Roustabout, Roof trimmer/scaler |
Narrative | We was pulling cable with a premissible ride up #3 entry when the right tire hit a rock 1 ft thick, 1 ft wide causing ee to hurt his back. Didn't need medical attention right away. |
Accident Date | 2011-07-29 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Struck by falling object |
Ocupation | Shuttle car operator, Mantrip operator, Ramcar operator, Rail runner, Buggy operator |
Narrative | EE was assisting the bolter crew when a piece of draw rock fell and hit him in the back and ankle. The rock 5 foot 3 inches 6 inches thick. EE didn't need medical attention a this time. |
Accident Date | 2011-04-06 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Struck against stationary object |
Ocupation | Discontinued 1/31/2014. Several other codes cover Scoop Car Operator |
Narrative | Employee was putting oil in CX2 scoop when he stood up striking head on top. |
Accident Date | 2011-01-31 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Caught in, under or between a moving and a stationary object |
Ocupation | Continuous miner helper, Coal mole helper, Bridgeman |
Narrative | Hit finger loading belt rails on a scoop. |
Accident Date | 2010-10-18 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Struck by falling object |
Ocupation | Miner, NEC |
Narrative | PRE-Shifting the mine a draw rock fell from the top. |
Accident Date | 2010-09-27 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Over-exertion in pulling or pushing objects |
Ocupation | Roof bolter, Rock bolter, Pinner, Mobile roof support operator (MRS) |
Narrative | EE was pulling cable from pinner to power box. |
Accident Date | 2010-09-15 |
Degree Inhury | ALL OTHER CASES (INCL 1ST AID) |
Accident Type | Over-exertion NEC |
Ocupation | Electrician, Lineman |
Narrative | EE was lifting a tire out of a scoop bucket, his feet slipped causing the weight of the tire to shift straining his right arm. |
Accident Date | 2010-06-29 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Struck by falling object |
Ocupation | Roof bolter, Rock bolter, Pinner, Mobile roof support operator (MRS) |
Narrative | Due to loose piece of draw rock falling from mine roof. Rock size approx 30 long 2 thick 1 ft wide. |
Accident Date | 2010-01-26 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Fall to the walkway or working surface |
Ocupation | Laborer, Bull gang, Parts runner, Roustabout, Roof trimmer/scaler |
Narrative | taking nails out of curtain - bent over and went to the ground with sharp pain. |
Inspections
Start Date | 2013-07-11 |
End Date | 2013-07-11 |
Activity | Roof Control Technical Investigation |
Number Inspectors | 1 |
Total Hours | 7 |
Start Date | 2013-07-10 |
End Date | 2013-09-18 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 3 |
Total Hours | 20.5 |
Start Date | 2013-07-05 |
End Date | 2013-07-05 |
Activity | Ventilation Technical Investigation |
Number Inspectors | 2 |
Total Hours | 8 |
Start Date | 2013-04-01 |
End Date | 2013-04-16 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 27 |
Start Date | 2013-01-03 |
End Date | 2013-03-26 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 4 |
Total Hours | 76 |
Start Date | 2012-12-21 |
End Date | 2013-01-16 |
Activity | Spot Inspection |
Number Inspectors | 2 |
Total Hours | 6 |
Start Date | 2012-10-11 |
End Date | 2012-10-11 |
Activity | Roof Control Technical Investigation |
Number Inspectors | 1 |
Total Hours | 8 |
Start Date | 2012-10-09 |
End Date | 2012-12-17 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 7 |
Total Hours | 208.75 |
Start Date | 2012-08-29 |
End Date | 2012-08-29 |
Activity | Roof Control Technical Investigation |
Number Inspectors | 1 |
Total Hours | 8 |
Start Date | 2012-07-09 |
End Date | 2012-09-25 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 5 |
Total Hours | 134.75 |
Start Date | 2012-07-05 |
End Date | 2012-07-16 |
Activity | Ventilation Technical Investigation |
Number Inspectors | 1 |
Total Hours | 17.5 |
Start Date | 2012-06-27 |
End Date | 2012-07-26 |
Activity | Electrical Technical Investigation |
Number Inspectors | 2 |
Total Hours | 57.25 |
Start Date | 2012-05-23 |
End Date | 2012-05-23 |
Activity | Roof Control Technical Investigation |
Number Inspectors | 1 |
Total Hours | 8 |
Start Date | 2012-04-27 |
End Date | 2012-06-25 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 6 |
Total Hours | 178.5 |
Start Date | 2012-04-24 |
End Date | 2012-04-24 |
Activity | Spot Inspection |
Number Inspectors | 1 |
Total Hours | 8 |
Start Date | 2012-04-16 |
End Date | 2012-04-16 |
Activity | Ventilation Technical Investigation |
Number Inspectors | 2 |
Total Hours | 16 |
Start Date | 2012-04-06 |
End Date | 2012-04-06 |
Activity | Roof Control Technical Investigation |
Number Inspectors | 1 |
Total Hours | 8 |
Start Date | 2012-01-05 |
End Date | 2012-03-29 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 3 |
Total Hours | 120 |
Start Date | 2011-11-01 |
End Date | 2011-11-09 |
Activity | Roof Control Technical Investigation |
Number Inspectors | 2 |
Total Hours | 30 |
Start Date | 2011-10-03 |
End Date | 2011-12-28 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 2 |
Total Hours | 152 |
Productions
Sub-Unit Desc | UNDERGROUND |
Year | 2013 |
Annual Hours | 7910 |
Annual Coal Prod | 18373 |
Avg. Annual Empl. | 9 |
Avg. Employee Hours | 879 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2013 |
Annual Hours | 649 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 2 |
Avg. Employee Hours | 325 |
Sub-Unit Desc | UNDERGROUND |
Year | 2012 |
Annual Hours | 45962 |
Annual Coal Prod | 135186 |
Avg. Annual Empl. | 18 |
Avg. Employee Hours | 2553 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2012 |
Annual Hours | 3571 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 3 |
Avg. Employee Hours | 1190 |
Sub-Unit Desc | UNDERGROUND |
Year | 2011 |
Annual Hours | 79606 |
Annual Coal Prod | 207714 |
Avg. Annual Empl. | 32 |
Avg. Employee Hours | 2488 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2011 |
Annual Hours | 7601 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 4 |
Avg. Employee Hours | 1900 |
Sub-Unit Desc | UNDERGROUND |
Year | 2010 |
Annual Hours | 86337 |
Annual Coal Prod | 259573 |
Avg. Annual Empl. | 34 |
Avg. Employee Hours | 2539 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2010 |
Annual Hours | 7313 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 4 |
Avg. Employee Hours | 1828 |
Sub-Unit Desc | UNDERGROUND |
Year | 2009 |
Annual Hours | 66502 |
Annual Coal Prod | 213576 |
Avg. Annual Empl. | 27 |
Avg. Employee Hours | 2463 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2009 |
Annual Hours | 7418 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 4 |
Avg. Employee Hours | 1855 |
Sub-Unit Desc | UNDERGROUND |
Year | 2008 |
Annual Hours | 49163 |
Annual Coal Prod | 190161 |
Avg. Annual Empl. | 21 |
Avg. Employee Hours | 2341 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2008 |
Annual Hours | 5761 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 3 |
Avg. Employee Hours | 1920 |
Sub-Unit Desc | UNDERGROUND |
Year | 2007 |
Annual Hours | 49350 |
Annual Coal Prod | 200751 |
Avg. Annual Empl. | 24 |
Avg. Employee Hours | 2056 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2007 |
Annual Hours | 6184 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 3 |
Avg. Employee Hours | 2061 |
Sub-Unit Desc | UNDERGROUND |
Year | 2006 |
Annual Hours | 72261 |
Annual Coal Prod | 214561 |
Avg. Annual Empl. | 34 |
Avg. Employee Hours | 2125 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2006 |
Annual Hours | 6873 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 3 |
Avg. Employee Hours | 2291 |
Sub-Unit Desc | UNDERGROUND |
Year | 2005 |
Annual Hours | 43296 |
Annual Coal Prod | 159466 |
Avg. Annual Empl. | 19 |
Avg. Employee Hours | 2279 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2005 |
Annual Hours | 3338 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 2 |
Avg. Employee Hours | 1669 |
Sub-Unit Desc | UNDERGROUND |
Year | 2004 |
Annual Hours | 32138 |
Annual Coal Prod | 117831 |
Avg. Annual Empl. | 18 |
Avg. Employee Hours | 1785 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2004 |
Annual Hours | 5370 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 3 |
Avg. Employee Hours | 1790 |
Directions to Mine | U.S. 23 South to 1469 (Virgie) to Penny Road to Rt. 122. Turn right on Anderson Fork - 1.2 miles to mine. |
Parties
Name | Premier Elkhorn Coal Company |
Role | Operator |
Start Date | 2012-08-06 |
End Date | 2013-07-17 |
Name | South Akers Mining, LLC |
Role | Operator |
Start Date | 2005-06-28 |
End Date | 2012-08-05 |
Name | Ranger Contracting |
Role | Operator |
Start Date | 2013-07-18 |
Name | Rondall Reed |
Role | Current Controller |
Start Date | 2013-07-18 |
Name | Ranger Contracting |
Role | Current Operator |
Accidents
Accident Date | 2006-05-30 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Struck by falling object |
Ocupation | Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech |
Narrative | Draw rock. |
Accident Date | 2006-03-13 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Over-exertion in pulling or pushing objects |
Ocupation | Electrician, Lineman |
Narrative | Pulling miner cable slack to hang cable. |
Accident Date | 2005-08-28 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Struck by falling object |
Ocupation | Laborer, Bull gang, Parts runner, Roustabout, Roof trimmer/scaler |
Narrative | EMPLOYEE WAS TAKING SHUTTLE CAR CABLE AROUND THE CAR. HE HAD HIS HAND ON TOP OF CAR AND A PIECE OF DRAW ROCK FELL STRIKING HIS HAND |
Inspections
Start Date | 2014-08-04 |
End Date | 2014-08-04 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 5 |
Start Date | 2013-12-09 |
End Date | 2013-12-27 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 3 |
Total Hours | 9.5 |
Start Date | 2013-10-02 |
End Date | 2013-10-02 |
Activity | Spot Inspection |
Number Inspectors | 1 |
Total Hours | 3.5 |
Start Date | 2013-09-23 |
End Date | 2013-09-26 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 2 |
Total Hours | 27.25 |
Start Date | 2012-09-12 |
End Date | 2012-09-17 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 2 |
Total Hours | 8 |
Start Date | 2012-08-21 |
End Date | 2012-08-21 |
Activity | Roof Control Technical Investigation |
Number Inspectors | 2 |
Total Hours | 8.5 |
Start Date | 2006-07-10 |
End Date | 2006-09-28 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 11.5 |
Start Date | 2006-04-05 |
End Date | 2006-06-30 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 2 |
Total Hours | 76.5 |
Start Date | 2006-01-09 |
End Date | 2006-03-24 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 2 |
Total Hours | 102 |
Start Date | 2006-01-04 |
End Date | 2006-01-04 |
Activity | Spot Inspection |
Number Inspectors | 1 |
Total Hours | 8 |
Start Date | 2005-10-21 |
End Date | 2005-12-21 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 4 |
Total Hours | 121 |
Start Date | 2005-08-30 |
End Date | 2005-09-01 |
Activity | Verbal Hazard Complaint Inspections |
Number Inspectors | 1 |
Total Hours | 4 |
Start Date | 2005-08-17 |
End Date | 2005-08-17 |
Activity | Spot Inspection |
Number Inspectors | 1 |
Total Hours | 8 |
Start Date | 2005-07-25 |
End Date | 2005-08-03 |
Activity | Electrical Technical Investigation |
Number Inspectors | 2 |
Total Hours | 16.5 |
Start Date | 2005-07-14 |
End Date | 2005-07-14 |
Activity | Spot Inspection |
Number Inspectors | 1 |
Total Hours | 3 |
Start Date | 2005-07-12 |
End Date | 2005-07-12 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 4 |
Productions
Sub-Unit Desc | UNDERGROUND |
Year | 2006 |
Annual Hours | 18041 |
Annual Coal Prod | 80754 |
Avg. Annual Empl. | 11 |
Avg. Employee Hours | 1640 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2006 |
Annual Hours | 5717 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 6 |
Avg. Employee Hours | 953 |
Sub-Unit Desc | UNDERGROUND |
Year | 2005 |
Annual Hours | 17700 |
Annual Coal Prod | 57595 |
Avg. Annual Empl. | 19 |
Avg. Employee Hours | 932 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2005 |
Annual Hours | 3409 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 6 |
Avg. Employee Hours | 568 |
Sources: Kentucky Secretary of State