Name: | ISLAND FORK CONSTRUCTION, LTD. |
Legal type: | Foreign Corporation |
Status: | Inactive |
Standing: | Bad |
Profit or Non-Profit: | Profit |
File Date: | 25 Mar 1994 (31 years ago) |
Authority Date: | 25 Mar 1994 (31 years ago) |
Last Annual Report: | 25 Apr 2003 (22 years ago) |
Organization Number: | 0328437 |
Principal Office: | 3677 ROBERT C BYRD DR, BECKLEY, WV 25801 |
Place of Formation: | WEST VIRGINIA |
Name | Role |
---|---|
Amon L Mahon | Director |
Name | Role |
---|---|
Sharon L Mahon | Secretary |
Name | Role |
---|---|
Sharon L Mahon | Treasurer |
Name | Role |
---|---|
Amon L Mahon | President |
Name | File Date |
---|---|
Revocation Return | 2004-08-09 |
Revocation of Certificate of Authority | 2004-08-03 |
Agent Resignation | 2003-12-11 |
Annual Report | 2003-07-16 |
Annual Report | 2002-08-06 |
Statement of Change | 2002-06-12 |
Annual Report | 2001-06-07 |
Annual Report | 2000-08-08 |
Annual Report | 1999-06-18 |
Statement of Change | 1998-06-25 |
Mine Name | Type | Status | Primary Sic | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
No 8 | Underground | Abandoned and Sealed | Coal (Bituminous) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Name | Canada Coal Company Inc |
Role | Operator |
Start Date | 1974-08-02 |
End Date | 1993-03-04 |
Name | Deskins Branch Coal Company |
Role | Operator |
Start Date | 1950-01-01 |
End Date | 1974-08-01 |
Name | North Star Contractors Inc |
Role | Operator |
Start Date | 1995-01-26 |
End Date | 1996-08-06 |
Name | Mouthcard Development Company Inc |
Role | Operator |
Start Date | 1993-04-26 |
End Date | 1994-05-19 |
Name | Eclipse Collieries Inc |
Role | Operator |
Start Date | 1993-03-05 |
End Date | 1993-04-25 |
Name | Island Fork Construction Ltd |
Role | Operator |
Start Date | 1996-08-07 |
Name | Citation Resources Inc |
Role | Operator |
Start Date | 1994-05-20 |
End Date | 1995-01-25 |
Name | Amon L Mahon |
Role | Current Controller |
Start Date | 1996-08-07 |
Name | Island Fork Construction Ltd |
Role | Current Operator |
Inspections
Start Date | 2000-05-23 |
End Date | 2000-05-25 |
Activity | SPOT INSPECTION |
Number Inspectors | 1 |
Total Hours | 4 |
Directions to Mine | Prestonsburg field office to US23N. Travel 23N towards Louisa, KY approximately 40 miles. Turn left on to KY3398, Full Branch Road. Mine facility is on the right. |
Parties
Name | Kanawha River Terminals LLC |
Role | Operator |
Start Date | 2010-06-08 |
Name | Tri-State Terminals Inc |
Role | Operator |
Start Date | 1977-08-01 |
End Date | 1982-04-25 |
Name | Belfry Coal Corp |
Role | Operator |
Start Date | 1982-04-26 |
End Date | 1990-09-12 |
Name | Big Sandy Resources Inc |
Role | Operator |
Start Date | 1995-04-03 |
End Date | 1998-05-07 |
Name | Kentucky May Coal Company Inc |
Role | Operator |
Start Date | 1990-09-13 |
End Date | 1994-05-23 |
Name | Kentucky May Coal Company Inc |
Role | Operator |
Start Date | 1995-03-13 |
End Date | 1995-04-02 |
Name | Colona Synfuel Llc |
Role | Operator |
Start Date | 1998-05-08 |
End Date | 2000-11-29 |
Name | Island Fork Construction Ltd |
Role | Operator |
Start Date | 1994-11-17 |
End Date | 1995-03-12 |
Name | Double C Construction Ltd |
Role | Operator |
Start Date | 1994-05-24 |
End Date | 1994-11-16 |
Name | Colona Synfuel L L C |
Role | Operator |
Start Date | 2000-11-30 |
End Date | 2010-06-07 |
Name | SunCoke Energy Incorporated |
Role | Current Controller |
Start Date | 2010-06-08 |
Name | Kanawha River Terminals LLC |
Role | Current Operator |
Accidents
Accident Date | 2000-09-08 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Struck against a moving object |
Ocupation | Warehouseman, Bagger, Palletizer/Stacker, Store keeper, Packager, Fabricator, Cleaning plant operator |
Narrative | EE STATES THAT A TWISTING MOTION INSIDE ENDLOADER CAUSED PAIN IN CENTER OF BACK. |
Accident Date | 2000-06-05 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Over-exertion in lifting objects |
Ocupation | Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech |
Narrative | PICKING UP A PIECE OF RE-BAR. |
Inspections
Start Date | 2023-07-13 |
End Date | 2023-07-13 |
Activity | Spot Inspection |
Number Inspectors | 1 |
Total Hours | 5 |
Start Date | 2023-05-24 |
End Date | 2023-05-24 |
Activity | Mine Idle Activity |
Number Inspectors | 1 |
Total Hours | 4 |
Start Date | 2023-03-02 |
End Date | 2023-03-02 |
Activity | Mine Idle Activity |
Number Inspectors | 1 |
Total Hours | 3 |
Start Date | 2022-04-12 |
End Date | 2022-04-12 |
Activity | Mine Idle Activity |
Number Inspectors | 1 |
Total Hours | 8 |
Start Date | 2022-03-22 |
End Date | 2022-03-22 |
Activity | Mine Idle Activity |
Number Inspectors | 1 |
Total Hours | 8 |
Start Date | 2021-09-23 |
End Date | 2021-09-23 |
Activity | Mine Idle Activity |
Number Inspectors | 1 |
Total Hours | 10 |
Start Date | 2020-12-16 |
End Date | 2020-12-16 |
Activity | Mine Idle Activity |
Number Inspectors | 1 |
Total Hours | 7 |
Start Date | 2020-04-15 |
End Date | 2020-04-15 |
Activity | Mine Idle Activity |
Number Inspectors | 1 |
Total Hours | 3.5 |
Start Date | 2019-12-04 |
End Date | 2019-12-04 |
Activity | Mine Idle Activity |
Number Inspectors | 1 |
Total Hours | 2.5 |
Start Date | 2019-08-26 |
End Date | 2019-08-26 |
Activity | Mine Idle Activity |
Number Inspectors | 1 |
Total Hours | 4.25 |
Start Date | 2019-03-25 |
End Date | 2019-03-25 |
Activity | Mine Idle Activity |
Number Inspectors | 1 |
Total Hours | 5 |
Start Date | 2018-09-26 |
End Date | 2018-09-26 |
Activity | Mine Idle Activity |
Number Inspectors | 1 |
Total Hours | 2.75 |
Start Date | 2017-12-13 |
End Date | 2017-12-13 |
Activity | Mine Idle Activity |
Number Inspectors | 1 |
Total Hours | 8 |
Start Date | 2017-04-10 |
End Date | 2017-06-13 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 22 |
Start Date | 2017-03-16 |
End Date | 2017-03-16 |
Activity | Mine Idle Activity |
Number Inspectors | 1 |
Total Hours | 6.5 |
Start Date | 2016-08-04 |
End Date | 2016-08-04 |
Activity | Mine Idle Activity |
Number Inspectors | 1 |
Total Hours | 8 |
Start Date | 2015-12-21 |
End Date | 2015-12-21 |
Activity | Mine Idle Activity |
Number Inspectors | 1 |
Total Hours | 6.5 |
Start Date | 2015-07-01 |
End Date | 2015-07-02 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 8.75 |
Start Date | 2014-12-18 |
End Date | 2014-12-31 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 17 |
Start Date | 2014-08-15 |
End Date | 2014-09-04 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 35.75 |
Productions
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2014 |
Annual Hours | 8692 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 4 |
Avg. Employee Hours | 2173 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2013 |
Annual Hours | 4031 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 3 |
Avg. Employee Hours | 1344 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2012 |
Annual Hours | 1000 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 5 |
Avg. Employee Hours | 200 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2011 |
Annual Hours | 10440 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 5 |
Avg. Employee Hours | 2088 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2010 |
Annual Hours | 1650 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 3 |
Avg. Employee Hours | 550 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2009 |
Annual Hours | 2400 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 3 |
Avg. Employee Hours | 800 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2008 |
Annual Hours | 336 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 2 |
Avg. Employee Hours | 168 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2007 |
Annual Hours | 60942 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 22 |
Avg. Employee Hours | 2770 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2006 |
Annual Hours | 28580 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 23 |
Avg. Employee Hours | 1243 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2005 |
Annual Hours | 63870 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 27 |
Avg. Employee Hours | 2366 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2004 |
Annual Hours | 48195 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 19 |
Avg. Employee Hours | 2537 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2003 |
Annual Hours | 34880 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 17 |
Avg. Employee Hours | 2052 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2002 |
Annual Hours | 40063 |
Avg. Annual Empl. | 20 |
Avg. Employee Hours | 2003 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2001 |
Annual Hours | 41909 |
Avg. Annual Empl. | 20 |
Avg. Employee Hours | 2095 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2000 |
Annual Hours | 36823 |
Avg. Annual Empl. | 15 |
Avg. Employee Hours | 2455 |
Directions to Mine | 1.5 miles NW of Intersection of Hwy. 407 and Hwy. 41,S of Mannington, KY |
Parties
Name | Charolais Corp |
Role | Operator |
Start Date | 1984-02-01 |
End Date | 1989-05-14 |
Name | Pyramid Mining Inc |
Role | Operator |
Start Date | 1989-05-15 |
End Date | 1993-10-31 |
Name | Island Fork Construction LTD |
Role | Operator |
Start Date | 2001-11-08 |
Name | Progressive Mining Inc |
Role | Operator |
Start Date | 1993-11-01 |
End Date | 1997-03-15 |
Name | Black Hills Coal Inc |
Role | Operator |
Start Date | 2000-07-01 |
End Date | 2001-11-07 |
Name | Centennial Resources Inc |
Role | Operator |
Start Date | 1997-03-16 |
End Date | 2000-06-30 |
Name | Amon L Mahon |
Role | Current Controller |
Start Date | 2001-11-08 |
Name | Island Fork Construction LTD |
Role | Current Operator |
Accidents
Accident Date | 2002-03-14 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Contact with hot objects or substances |
Ocupation | Drill helper |
Narrative | EE WAS BACKFILLING HOLES WITH A DOZER. HE WAS LETTING DOZER COOL OFF & DIPSTICK TO TRANSMISSION POPPED OUT & OIL FLEW ON HIS RIGHT HAND. |
Inspections
Start Date | 2003-04-08 |
End Date | 2003-06-30 |
Activity | Regular Inspection |
Number Inspectors | 1 |
Total Hours | 6.5 |
Start Date | 2002-10-04 |
End Date | 2003-03-14 |
Activity | Regular Inspection |
Number Inspectors | 3 |
Total Hours | 26 |
Start Date | 2002-04-01 |
End Date | 2002-07-17 |
Activity | Regular Inspection |
Number Inspectors | 1 |
Total Hours | 46 |
Start Date | 2001-10-02 |
End Date | 2002-03-21 |
Activity | Regular Inspection |
Number Inspectors | 1 |
Total Hours | 55 |
Start Date | 2001-06-06 |
End Date | 2001-06-20 |
Activity | RESP DUST TECH INSP - SURFACE MINES |
Number Inspectors | 1 |
Total Hours | 22.5 |
Start Date | 2001-04-05 |
End Date | 2001-04-05 |
Activity | NOISE TECHNICAL INVESTIGATION |
Number Inspectors | 1 |
Total Hours | 12 |
Start Date | 2001-04-02 |
End Date | 2001-09-20 |
Activity | Regular Inspection |
Number Inspectors | 2 |
Total Hours | 94.5 |
Start Date | 2001-03-21 |
End Date | 2001-03-21 |
Activity | NOISE TECHNICAL INVESTIGATION |
Number Inspectors | 1 |
Total Hours | 13 |
Start Date | 2001-01-09 |
End Date | 2001-03-21 |
Activity | RESP DUST TECH INSP - SURFACE MINES |
Number Inspectors | 1 |
Total Hours | 35.75 |
Start Date | 2000-10-03 |
End Date | 2001-03-30 |
Activity | Regular Inspection |
Number Inspectors | 1 |
Total Hours | 107.5 |
Start Date | 2000-08-30 |
End Date | 2000-09-13 |
Activity | RESP DUST TECH INSP - SURFACE MINES |
Number Inspectors | 1 |
Total Hours | 14 |
Start Date | 2000-06-23 |
End Date | 2000-06-26 |
Activity | PART 50 AUDITS |
Number Inspectors | 1 |
Total Hours | 12 |
Start Date | 2000-04-03 |
End Date | 2000-09-18 |
Activity | Regular Inspection |
Number Inspectors | 1 |
Total Hours | 75.5 |
Start Date | 2000-03-09 |
End Date | 2000-03-09 |
Activity | RESP DUST TECHNICAL INVESTIGATION |
Number Inspectors | 1 |
Total Hours | 4 |
Start Date | 2000-03-01 |
End Date | 2000-03-01 |
Activity | NOISE TECHNICAL INVESTIGATION |
Number Inspectors | 1 |
Total Hours | 13 |
Start Date | 2000-02-03 |
End Date | 2000-02-03 |
Activity | RESP DUST TECHNICAL INVESTIGATION |
Number Inspectors | 1 |
Total Hours | 6 |
Start Date | 2000-01-25 |
End Date | 2000-02-25 |
Activity | RESP DUST TECH INSP - SURFACE MINES |
Number Inspectors | 1 |
Total Hours | 13 |
Start Date | 2000-01-03 |
End Date | 2000-01-03 |
Activity | RESP DUST TECHNICAL INVESTIGATION |
Number Inspectors | 1 |
Total Hours | 8 |
Productions
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2002 |
Annual Hours | 32667 |
Annual Coal Prod | 118783 |
Avg. Annual Empl. | 18 |
Avg. Employee Hours | 1815 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2001 |
Annual Hours | 85094 |
Annual Coal Prod | 334229 |
Avg. Annual Empl. | 37 |
Avg. Employee Hours | 2300 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2000 |
Annual Hours | 44584 |
Annual Coal Prod | 194245 |
Avg. Annual Empl. | 19 |
Avg. Employee Hours | 2347 |
Directions to Mine | From Prestonsburg field office off to US23N. Travel approximately 60 miles. The facility mine site will be on the right. |
Parties
Name | Kanawha River Terminals LLC |
Role | Operator |
Start Date | 2008-08-05 |
End Date | 2016-06-27 |
Name | Kentucky May Coal Company Inc |
Role | Operator |
Start Date | 1989-10-01 |
End Date | 1994-05-23 |
Name | Kentucky Coal Terminal |
Role | Operator |
Start Date | 1995-03-13 |
End Date | 2000-11-29 |
Name | Island Fork Construction Ltd |
Role | Operator |
Start Date | 1994-11-17 |
End Date | 1995-03-12 |
Name | Double C Construction Ltd |
Role | Operator |
Start Date | 1994-05-24 |
End Date | 1994-11-16 |
Name | Kentucky Coal Terminal |
Role | Operator |
Start Date | 2000-11-30 |
End Date | 2008-08-04 |
Name | CW Coal Sales, Inc |
Role | Operator |
Start Date | 2016-06-28 |
Name | Shannon Wells |
Role | Current Controller |
Start Date | 2016-06-28 |
Name | CW Coal Sales, Inc |
Role | Current Operator |
Accidents
Accident Date | 2013-04-22 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Struck by falling object |
Ocupation | Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech |
Narrative | EE maintenance Worker for KCT, on 04/22/2013 at approximately 2:00 pm, was reconditioning roller frames on a 226 D9R Dozer. EE was driving the equilibrium bar pin out, and as it was 1/4 inch from being out, ee placed a bolt in it, and was holding onto the bolt when the equilibrium pin came out and the roller frame fell and pinched ee left thumb. |
Accident Date | 2012-11-26 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Caught in, under or between a moving and a stationary object |
Ocupation | Front-end loader, Scraper-loader operator, Pan operator, Payloader, Scraper rig operator |
Narrative | Employee was performing pre-operational inspection of Loader and saw that A/C vent housing above his head in the cab was loose on one side. Employee attempted to snap vent housing back in place and shoved hand through the vent approx. 5 inches and made contact with fan blades resulting in lacerated and broken ring finger on left hand. |
Accident Date | 2012-08-07 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Over-exertion NEC |
Ocupation | Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech |
Narrative | Employee was unloading empty pallet from back of mechanic's truck and when he stepped to the ground his knee gave out and felt pain. This is the same knee that was injured in 7/2011 requiring surgery where the employee was off until he was released to return to work on 4/9/2012. |
Accident Date | 2012-07-16 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Struck by... NEC |
Ocupation | Laborer, Blacksmith, Bull gang, Parts runner, Roustabout, Pick-up man, Pitman |
Narrative | Employee was trimming saplings off the river bank and while in the process of setting the chain saw down the chain saw struck the inside of left leg under knee resulting in laceration requiring 16 stitches. |
Accident Date | 2011-07-20 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Over-exertion NEC |
Ocupation | Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech |
Narrative | Employee had just dismounted a loader being repaired in the shop area and after placing both feet firmly on the shop floor the employee turned to his right and felt a pop in his left knee. Employee did not seek medical attention until 8/15/2011 and was placed off work for 1 week by his physician. |
Accident Date | 2007-08-08 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Over-exertion NEC |
Ocupation | Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech |
Narrative | On 8-20-07 Employee Reported to mine supervisor, that on 8-8-07, he was stretching to pick-up a 4x6x1/2 sheet of plate steel with a co-worker, in doing so, he strained his back. on 8-20-07 employee was seen by DR. at the Louisa Medical Clinic, in Louisa Kentucky,and was givin a prescription for pain. Employee did not fail to report to work. |
Accident Date | 2007-06-19 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Struck by falling object |
Ocupation | Warehouseman, Bagger, Palletizer/Stacker, Store keeper, Packager, Fabricator, Cleaning plant operator |
Narrative | Employee opened inspection door on mixer unit to examine a plugged condition. The inspection door was not secured in place and fell, striking the employee's right hand, causing swelling and pain. Employee was taken for X-rays, no fractures were identified, however; the employee was ordered off work for his next shift and given a Prescription for pain. |
Accident Date | 2006-05-20 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Over-exertion in pulling or pushing objects |
Ocupation | Bulldozer operator, Universal operator, Heavy equipment operator, Operating engineer |
Narrative | Employee was moving the portable stairway so he could grease the top jacks on a 988 F model loader. While rolling the stairway into position, the employee strained his lower back, resulting in a lost time accident. |
Accident Date | 2005-11-07 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Fall down stairs |
Ocupation | Coal sampler |
Narrative | MISSED STEP ON STAIRS IN CONTROL ROOM. FELL AND HIT HEAD. |
Accident Date | 2005-10-17 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Struck by... NEC |
Ocupation | Barge/Boat/Dredge/Towbarge/Towboat/Leach operator, Riverman, Deck hand |
Narrative | Employee attempted to re-attach the bucket onto the Skid Steer. At this time employee placed himself between the bucket and the Skid Steer. The bucket was raised approximately 12 inches off the ground. The bucket fell off the boom striking the employee in the back of both heels. This resulted in bruises to his heels and the Dr. prescribing Vicodin for pain. |
Accident Date | 2003-09-18 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Struck by... NEC |
Ocupation | Laborer, Blacksmith, Bull gang, Parts runner, Roustabout, Pick-up man, Pitman |
Narrative | EE WAS MOWING THE GRASS IN AND AROUND THE FACILITY. WHILE USING A STRING TRIMMER A PIECE OF FLOATING DEBRIS PASSED BEHIND HIS EYE PROTECTION AND ENTERED THE LEFT EYE CAUSING PAIN & IRRITATION. |
Accident Date | 2002-06-06 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Fall to the walkway or working surface |
Ocupation | Laborer, Blacksmith, Bull gang, Parts runner, Roustabout, Pick-up man, Pitman |
Narrative | EE BECAME ENTANGLED IN A WATER HOSE THAT HE WAS USING, LOST HIS BALANCE, FALLING ON LT. ELBOW. |
Accident Date | 2001-10-01 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Fall from machine |
Ocupation | Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech |
Narrative | EE BECAME FRIGHTENED BY LOUD NOISE NEAR HIM HE THEN JUMPED FROM STEP LADDER PLACED NEAR COAL HOPPER & BELT LINE. HE WAS APPROX 21/2 FT FROM GROUND HIS RIGHT FOOT COMES IN CONTACT WITH A LUM P OF CAOL & SPRAINS ANKLE. THIS INCIDENT WAS NOT REPORTED TO MGMT UNTIL 10/29/01 |
Accident Date | 2001-05-06 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Fall from machine |
Ocupation | Front-end loader, Scraper-loader operator, Pan operator, Payloader, Scraper rig operator |
Narrative | EE FELL TO GROUND WHILE DESCENDING STEPS LOCATED ON COUNTERWEIGHT ON 988-F LOADER, IN THE ACT OF REFUELING. |
Accident Date | 2001-04-06 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Over-exertion in pulling or pushing objects |
Ocupation | Laborer, Blacksmith, Bull gang, Parts runner, Roustabout, Pick-up man, Pitman |
Narrative | PULLING WRENCH TO TIGHTEN BOLTS ON BELT SCRAPER. |
Accident Date | 2001-01-15 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Over-exertion in lifting objects |
Ocupation | Bulldozer operator, Universal operator, Heavy equipment operator, Operating engineer |
Narrative | REMOVING METAL FROM THE CRUSHER DECK. LIFTING USING IMPROPER BODY POSITION CAUSED LOSER BACK SPRAIN. |
Accident Date | 2001-01-06 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Over-exertion in lifting objects |
Ocupation | Warehouseman, Bagger, Palletizer/Stacker, Store keeper, Packager, Fabricator, Cleaning plant operator |
Narrative | EE ALONG WITH THREE OTHER EMPLOYEES WERE LIFTING A PIECE OF METAL IN PLACE TO SERVE AS A GUARD FOR A BELTLINE. |
Accident Date | 2000-10-15 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Struck by... NEC |
Ocupation | Warehouseman, Bagger, Palletizer/Stacker, Store keeper, Packager, Fabricator, Cleaning plant operator |
Narrative | EE CLIMBED UP THE LADDER TO SPRAY THE DECK OFF. HE REACHED FOR A HAND HOLD AND GRABBED THE VALVE ON THE HOSE. THE HOSE CAME ON AND THE PRESSURE FROM THE HOSE HIT EE IN THE MOUTH. |
Accident Date | 2000-10-14 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Struck by... NEC |
Ocupation | Auger operator, Auger Crew supervisor |
Narrative | EE WAS WALKING FROM THE AUGER TO SCALEHOUSE & WIND BLEW FOREIGN OBJECT IN EYE |
Accident Date | 2000-04-20 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Caught in, under or between a moving and a stationary object |
Ocupation | Miner, NEC |
Narrative | EE WAS TRYING TO FREE THE BLENDER SHAFT WHEN IT DISLODGED AND SMASHED HIS FINGER. |
Inspections
Start Date | 2025-01-06 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 3 |
Total Hours | 39 |
Start Date | 2024-09-19 |
End Date | 2024-09-20 |
Activity | Spot Inspection |
Number Inspectors | 1 |
Total Hours | 17 |
Start Date | 2024-05-22 |
End Date | 2024-05-22 |
Activity | Special Emphasis Programs |
Number Inspectors | 1 |
Total Hours | 2 |
Start Date | 2024-05-01 |
End Date | 2024-05-29 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 2 |
Total Hours | 75 |
Start Date | 2024-02-06 |
End Date | 2024-03-01 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 3 |
Total Hours | 80 |
Start Date | 2023-09-18 |
End Date | 2023-09-19 |
Activity | Spot Inspection |
Number Inspectors | 1 |
Total Hours | 22 |
Start Date | 2023-05-17 |
End Date | 2023-05-17 |
Activity | Special Emphasis Programs |
Number Inspectors | 1 |
Total Hours | 2 |
Start Date | 2023-04-03 |
End Date | 2023-04-20 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 3 |
Total Hours | 74.75 |
Start Date | 2023-03-16 |
End Date | 2023-03-20 |
Activity | Spot Inspection |
Number Inspectors | 1 |
Total Hours | 15 |
Start Date | 2022-10-27 |
End Date | 2022-12-09 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 5 |
Total Hours | 93 |
Start Date | 2022-04-25 |
End Date | 2022-06-22 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 3 |
Total Hours | 74 |
Start Date | 2022-03-16 |
End Date | 2022-03-21 |
Activity | Spot Inspection |
Number Inspectors | 1 |
Total Hours | 16.5 |
Start Date | 2022-02-24 |
End Date | 2022-03-08 |
Activity | Spot Inspection |
Number Inspectors | 3 |
Total Hours | 41.5 |
Start Date | 2021-10-01 |
End Date | 2021-11-29 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 4 |
Total Hours | 157 |
Start Date | 2021-06-15 |
End Date | 2021-06-22 |
Activity | Spot Inspection |
Number Inspectors | 1 |
Total Hours | 40 |
Start Date | 2021-04-07 |
End Date | 2021-09-15 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 4 |
Total Hours | 91.25 |
Start Date | 2020-10-01 |
End Date | 2020-12-16 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 2 |
Total Hours | 91.5 |
Start Date | 2020-09-09 |
End Date | 2020-09-09 |
Activity | Special Emphasis Programs |
Number Inspectors | 2 |
Total Hours | 13.5 |
Start Date | 2020-08-12 |
End Date | 2020-08-14 |
Activity | Spot Inspection |
Number Inspectors | 1 |
Total Hours | 29.5 |
Start Date | 2020-04-13 |
End Date | 2020-05-11 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 3 |
Total Hours | 112 |
Productions
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2024 |
Annual Hours | 21677 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 8 |
Avg. Employee Hours | 2710 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2023 |
Annual Hours | 16035 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 8 |
Avg. Employee Hours | 2004 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2022 |
Annual Hours | 21148 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 9 |
Avg. Employee Hours | 2350 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2021 |
Annual Hours | 19386 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 8 |
Avg. Employee Hours | 2423 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2020 |
Annual Hours | 16106 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 8 |
Avg. Employee Hours | 2013 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2019 |
Annual Hours | 23299 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 11 |
Avg. Employee Hours | 2118 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2018 |
Annual Hours | 26865 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 10 |
Avg. Employee Hours | 2687 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2017 |
Annual Hours | 23006 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 9 |
Avg. Employee Hours | 2556 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2016 |
Annual Hours | 14846 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 8 |
Avg. Employee Hours | 1856 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2015 |
Annual Hours | 22832 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 10 |
Avg. Employee Hours | 2283 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2015 |
Annual Hours | 1042 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 1 |
Avg. Employee Hours | 1042 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2014 |
Annual Hours | 32546 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 12 |
Avg. Employee Hours | 2712 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2014 |
Annual Hours | 4774 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 2 |
Avg. Employee Hours | 2387 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2013 |
Annual Hours | 36114 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 15 |
Avg. Employee Hours | 2408 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2013 |
Annual Hours | 4271 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 2 |
Avg. Employee Hours | 2136 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2012 |
Annual Hours | 30749 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 11 |
Avg. Employee Hours | 2795 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2012 |
Annual Hours | 4177 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 2 |
Avg. Employee Hours | 2089 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2011 |
Annual Hours | 37488 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 16 |
Avg. Employee Hours | 2343 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2011 |
Annual Hours | 4467 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 2 |
Avg. Employee Hours | 2234 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2010 |
Annual Hours | 46312 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 20 |
Avg. Employee Hours | 2316 |
Parties
Name | Quad Mining Company Inc |
Role | Operator |
Start Date | 1993-09-01 |
End Date | 1994-11-28 |
Name | Desert Mining Inc |
Role | Operator |
Start Date | 1994-11-29 |
End Date | 1995-06-18 |
Name | Island Fork Construction Ltd |
Role | Operator |
Start Date | 1996-07-02 |
End Date | 1997-08-03 |
Name | Circle H Coal Inc |
Role | Operator |
Start Date | 1997-08-04 |
Name | Ho-Jo Coal Inc |
Role | Operator |
Start Date | 1995-06-19 |
End Date | 1996-02-11 |
Name | Shawna Lea Coal Company Inc |
Role | Operator |
Start Date | 1996-02-12 |
End Date | 1996-07-01 |
Name | Hackney Mark A |
Role | Current Controller |
Start Date | 1997-08-04 |
Name | Circle H Coal Inc |
Role | Current Operator |
Inspections
Start Date | 2004-03-30 |
End Date | 2004-03-30 |
Activity | SPOT INSPECTION |
Number Inspectors | 1 |
Total Hours | 4 |
Start Date | 2001-09-27 |
End Date | 2001-09-27 |
Activity | SPOT INSPECTION |
Number Inspectors | 1 |
Total Hours | 2.5 |
Parties
Name | R B M Enterprises Inc |
Role | Operator |
Start Date | 1994-02-01 |
End Date | 1995-10-24 |
Name | Island Fork Construction Ltd |
Role | Operator |
Start Date | 1995-10-25 |
Name | Amon L Mahon |
Role | Current Controller |
Start Date | 1995-10-25 |
Name | Island Fork Construction Ltd |
Role | Current Operator |
Directions to Mine | 0.2 Miles From RT 292 at Slaters Branch |
Parties
Name | General Mining LLC |
Role | Operator |
Start Date | 2007-07-01 |
Name | Big Hill Mining Inc |
Role | Operator |
Start Date | 1994-04-01 |
End Date | 1996-01-16 |
Name | Island Fork Construction Ltd |
Role | Operator |
Start Date | 1996-01-17 |
End Date | 2007-06-30 |
Name | Rodney A Robinson; Pat R Childers |
Role | Current Controller |
Start Date | 2007-07-01 |
Name | General Mining LLC |
Role | Current Operator |
Inspections
Start Date | 2007-07-10 |
End Date | 2007-07-10 |
Activity | Spot Inspection |
Number Inspectors | 1 |
Total Hours | 8 |
Directions to Mine | 2 Miles West (on Carter Branch) off Rt. 632 |
Parties
Name | Chrisco Services Inc |
Role | Operator |
Start Date | 1997-01-17 |
End Date | 1999-10-03 |
Name | Hi Tech Coal Inc |
Role | Operator |
Start Date | 1995-09-01 |
End Date | 1996-05-29 |
Name | Island Fork Construction Ltd |
Role | Operator |
Start Date | 1996-05-30 |
End Date | 1997-01-16 |
Name | DAMCO LLC |
Role | Operator |
Start Date | 2004-09-24 |
End Date | 2005-01-09 |
Name | Sassy Coal Co., Inc. |
Role | Operator |
Start Date | 2005-01-10 |
Name | Chafin Brothers Mining Inc |
Role | Operator |
Start Date | 1999-10-04 |
End Date | 2004-09-23 |
Name | Charles T Norman |
Role | Current Controller |
Start Date | 2005-01-10 |
Name | Sassy Coal Co., Inc. |
Role | Current Operator |
Accidents
Accident Date | 2000-05-01 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Over-exertion NEC |
Ocupation | Beltman, Conveyor man, Conveyor belt worker, Mobile bridge carrierman, Feeder operator, Conveyor rider |
Narrative | HE WAS SHOVELING OUT FROM UNDER #2 HEAD AND SAIDHE HURT HIS BACK. |
Accident Date | 2000-04-26 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Struck against a moving object |
Ocupation | Electrician, Lineman |
Narrative | OPERATING SCOOP HURT LEFT KNEE. |
Accident Date | 2000-02-29 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Over-exertion in pulling or pushing objects |
Ocupation | Beltman, Conveyor man, Conveyor belt worker, Mobile bridge carrierman, Feeder operator, Conveyor rider |
Narrative | HE WAS PUTTING IN A PIECE OF SKIRT RUBBER IN TAILPIECE & WAS TIGHTENING UP A BOLT & FELT SOMETHING POP IN HIS RIGHT ARM. |
Inspections
Start Date | 2006-01-05 |
End Date | 2006-01-05 |
Activity | Spot Inspection |
Number Inspectors | 2 |
Total Hours | 4 |
Start Date | 2006-01-03 |
End Date | 2006-03-08 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 4 |
Total Hours | 77 |
Start Date | 2005-10-11 |
End Date | 2005-12-21 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 2 |
Total Hours | 94.25 |
Start Date | 2005-07-05 |
End Date | 2005-08-22 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 3 |
Total Hours | 95 |
Start Date | 2005-04-11 |
End Date | 2005-06-17 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 3 |
Total Hours | 69 |
Start Date | 2005-03-30 |
End Date | 2005-03-31 |
Activity | RESP DUST TECH INSP - U. G. MINES |
Number Inspectors | 1 |
Total Hours | 12.5 |
Start Date | 2005-03-24 |
End Date | 2005-03-31 |
Activity | RESP DUST TECH INSP - SURFACE MINES |
Number Inspectors | 1 |
Total Hours | 6 |
Start Date | 2005-03-22 |
End Date | 2005-03-22 |
Activity | NOISE TECHNICAL INVESTIGATION |
Number Inspectors | 1 |
Total Hours | 6 |
Start Date | 2005-03-21 |
End Date | 2005-03-28 |
Activity | Regular Inspection |
Number Inspectors | 1 |
Total Hours | 34.5 |
Start Date | 2004-03-30 |
End Date | 2004-03-30 |
Activity | SPOT INSPECTION |
Number Inspectors | 1 |
Total Hours | 4 |
Start Date | 2001-01-19 |
End Date | 2001-01-19 |
Activity | Regular Inspection |
Number Inspectors | 1 |
Total Hours | 2 |
Start Date | 2000-10-19 |
End Date | 2000-10-19 |
Activity | ACCIDENT PREVENTION SPOT INSPECTION |
Number Inspectors | 1 |
Total Hours | 2 |
Start Date | 2000-10-19 |
End Date | 2000-10-19 |
Activity | Regular Inspection |
Number Inspectors | 1 |
Total Hours | 2 |
Start Date | 2000-07-31 |
End Date | 2000-07-31 |
Activity | Regular Inspection |
Number Inspectors | 1 |
Total Hours | 2 |
Start Date | 2000-07-05 |
End Date | 2000-07-17 |
Activity | SPOT INSPECTION |
Number Inspectors | 2 |
Total Hours | 8.5 |
Start Date | 2000-06-15 |
End Date | 2000-06-15 |
Activity | ELECTRICAL SPOT INSPECTION |
Number Inspectors | 2 |
Total Hours | 4 |
Start Date | 2000-06-06 |
End Date | 2000-07-05 |
Activity | RESP DUST TECH INSP - U. G. MINES |
Number Inspectors | 1 |
Total Hours | 19 |
Start Date | 2000-05-12 |
End Date | 2000-05-19 |
Activity | ELECTRICAL SPOT INSPECTION |
Number Inspectors | 1 |
Total Hours | 29.5 |
Start Date | 2000-05-12 |
End Date | 2000-05-12 |
Activity | SPOT INSPECTION |
Number Inspectors | 1 |
Total Hours | 1.5 |
Start Date | 2000-04-10 |
End Date | 2000-05-24 |
Activity | RESP DUST TECH INSP - U. G. MINES |
Number Inspectors | 1 |
Total Hours | 11 |
Productions
Sub-Unit Desc | UNDERGROUND |
Year | 2006 |
Annual Hours | 1225 |
Annual Coal Prod | 2547 |
Avg. Annual Empl. | 10 |
Avg. Employee Hours | 123 |
Sub-Unit Desc | SURFACE AT UNDERGROUND |
Year | 2006 |
Annual Hours | 795 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 5 |
Avg. Employee Hours | 159 |
Sub-Unit Desc | UNDERGROUND |
Year | 2005 |
Annual Hours | 13443 |
Annual Coal Prod | 35778 |
Avg. Annual Empl. | 14 |
Avg. Employee Hours | 960 |
Sub-Unit Desc | SURFACE AT UNDERGROUND |
Year | 2005 |
Annual Hours | 4471 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 4 |
Avg. Employee Hours | 1118 |
Sub-Unit Desc | UNDERGROUND |
Year | 2000 |
Annual Hours | 8412 |
Annual Coal Prod | 18532 |
Avg. Annual Empl. | 11 |
Avg. Employee Hours | 765 |
Directions to Mine | Akers Branch, Printer, KY |
Parties
Name | North Star Mining, Inc. |
Role | Operator |
Start Date | 2002-03-25 |
Name | Island Fork Construction Ltd |
Role | Operator |
Start Date | 1995-11-01 |
End Date | 2002-03-24 |
Name | Carl Kirk |
Role | Current Controller |
Start Date | 2002-03-25 |
Name | North Star Mining, Inc. |
Role | Current Operator |
Accidents
Accident Date | 2003-12-28 |
Degree Inhury | ACCIDENT ONLY |
Accident Type | Accident type, without injuries |
Ocupation | NO VALUE FOUND |
Narrative | HAD A ROCK FALL 1ST BREAK BETWEEN #3 & #4 INTERSECTION ABOUT 5' HIGH. REBOLTED & SET CRIBS & TIMBERS. |
Accident Date | 2003-12-23 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Struck by... NEC |
Ocupation | Electrician, Lineman |
Narrative | EMPLOYEE WAS PUTTING COIL BREAKER IN MINER HEAD - PUT HEAD OF MINER IN TOP OF ROOF TO PUT PRESSURES ON COIL BREAKER - WHEN THEY LEFT THE HEAD BACK DOWN - EMPLOYEE WENT TO GRAB THE COIL BREAKER - IT FLEW OUT AND STRUCK HIM IN THE FACE. EMPLOYEE SUSTAINED CUTS TO THE MOUTH AND LIP (9 STITCHES) , 1 BROKEN AND 1 LOOSE TOOTH, AND A CONCUSSION. |
Inspections
Start Date | 2004-08-24 |
End Date | 2004-08-24 |
Activity | SPOT INSPECTION |
Number Inspectors | 1 |
Total Hours | 3 |
Start Date | 2004-07-12 |
End Date | 2004-07-12 |
Activity | Regular Inspection |
Number Inspectors | 1 |
Total Hours | 5 |
Start Date | 2004-04-15 |
End Date | 2004-05-10 |
Activity | Regular Inspection |
Number Inspectors | 2 |
Total Hours | 24 |
Start Date | 2004-04-06 |
End Date | 2004-04-06 |
Activity | RESP DUST TECH INSP - U. G. MINES |
Number Inspectors | 1 |
Total Hours | 10 |
Start Date | 2004-02-25 |
End Date | 2004-02-25 |
Activity | NOISE TECHNICAL INVESTIGATION |
Number Inspectors | 1 |
Total Hours | 3.75 |
Start Date | 2004-02-25 |
End Date | 2004-02-25 |
Activity | RESP DUST TECH INSP - SURFACE MINES |
Number Inspectors | 1 |
Total Hours | 4.25 |
Start Date | 2004-02-02 |
End Date | 2004-02-04 |
Activity | RESP DUST TECH INSP - U. G. MINES |
Number Inspectors | 1 |
Total Hours | 11 |
Start Date | 2004-01-05 |
End Date | 2004-03-31 |
Activity | Regular Inspection |
Number Inspectors | 3 |
Total Hours | 83.25 |
Start Date | 2003-12-30 |
End Date | 2003-12-30 |
Activity | NON-INJURY ACCIDENT INVESTIGATION |
Number Inspectors | 1 |
Total Hours | 4 |
Start Date | 2003-12-30 |
End Date | 2003-12-30 |
Activity | ACCIDENT PREVENTION SPOT INSPECTION |
Number Inspectors | 1 |
Total Hours | 4 |
Start Date | 2003-12-01 |
End Date | 2003-12-12 |
Activity | RESP DUST TECH INSP - U. G. MINES |
Number Inspectors | 1 |
Total Hours | 12 |
Start Date | 2003-10-14 |
End Date | 2003-10-21 |
Activity | RESP DUST TECH INSP - U. G. MINES |
Number Inspectors | 1 |
Total Hours | 11 |
Start Date | 2003-10-06 |
End Date | 2003-12-29 |
Activity | Regular Inspection |
Number Inspectors | 1 |
Total Hours | 112.5 |
Start Date | 2003-10-01 |
End Date | 2003-10-01 |
Activity | ACCIDENT PREVENTION SPOT INSPECTION |
Number Inspectors | 1 |
Total Hours | 5.5 |
Start Date | 2003-08-19 |
End Date | 2003-08-28 |
Activity | RESP DUST TECH INSP - U. G. MINES |
Number Inspectors | 1 |
Total Hours | 9.5 |
Start Date | 2003-07-14 |
End Date | 2003-09-19 |
Activity | Regular Inspection |
Number Inspectors | 2 |
Total Hours | 130 |
Start Date | 2003-07-08 |
End Date | 2003-07-14 |
Activity | RESP DUST TECH INSP - U. G. MINES |
Number Inspectors | 1 |
Total Hours | 15 |
Start Date | 2003-05-13 |
End Date | 2003-05-13 |
Activity | SPOT INSPECTION |
Number Inspectors | 1 |
Total Hours | 5 |
Start Date | 2003-05-06 |
End Date | 2003-06-26 |
Activity | FATAL ACCIDENT INVESTIGATION |
Number Inspectors | 1 |
Total Hours | 17.5 |
Start Date | 2003-04-09 |
End Date | 2003-05-05 |
Activity | Regular Inspection |
Number Inspectors | 1 |
Total Hours | 87.25 |
Productions
Sub-Unit Desc | UNDERGROUND |
Year | 2004 |
Annual Hours | 21315 |
Annual Coal Prod | 78034 |
Avg. Annual Empl. | 27 |
Avg. Employee Hours | 789 |
Sub-Unit Desc | SURFACE AT UNDERGROUND |
Year | 2004 |
Annual Hours | 3220 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 4 |
Avg. Employee Hours | 805 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2004 |
Annual Hours | 191 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 1 |
Avg. Employee Hours | 191 |
Sub-Unit Desc | UNDERGROUND |
Year | 2003 |
Annual Hours | 66011 |
Annual Coal Prod | 325202 |
Avg. Annual Empl. | 29 |
Avg. Employee Hours | 2276 |
Sub-Unit Desc | SURFACE AT UNDERGROUND |
Year | 2003 |
Annual Hours | 10813 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 5 |
Avg. Employee Hours | 2163 |
Sub-Unit Desc | UNDERGROUND |
Year | 2002 |
Annual Hours | 56573 |
Annual Coal Prod | 260847 |
Avg. Annual Empl. | 29 |
Avg. Employee Hours | 1951 |
Sub-Unit Desc | SURFACE AT UNDERGROUND |
Year | 2002 |
Annual Hours | 9051 |
Avg. Annual Empl. | 5 |
Avg. Employee Hours | 1810 |
Sub-Unit Desc | UNDERGROUND |
Year | 2001 |
Annual Hours | 71701 |
Annual Coal Prod | 288555 |
Avg. Annual Empl. | 34 |
Avg. Employee Hours | 2109 |
Sub-Unit Desc | SURFACE AT UNDERGROUND |
Year | 2001 |
Annual Hours | 9909 |
Avg. Annual Empl. | 5 |
Avg. Employee Hours | 1982 |
Sub-Unit Desc | UNDERGROUND |
Year | 2000 |
Annual Hours | 68670 |
Annual Coal Prod | 261628 |
Avg. Annual Empl. | 31 |
Avg. Employee Hours | 2215 |
Sub-Unit Desc | SURFACE AT UNDERGROUND |
Year | 2000 |
Annual Hours | 10038 |
Avg. Annual Empl. | 6 |
Avg. Employee Hours | 1673 |
Parties
Name | Island Fork Construction Ltd |
Role | Operator |
Start Date | 1999-03-01 |
Name | Amon L Mahon |
Role | Current Controller |
Start Date | 1999-03-01 |
Name | Island Fork Construction Ltd |
Role | Current Operator |
Parties
Name | Island Fork Construction Ltd |
Role | Operator |
Start Date | 2001-01-01 |
Name | Amon L Mahon |
Role | Current Controller |
Start Date | 2001-01-01 |
Name | Island Fork Construction Ltd |
Role | Current Operator |
Accidents
Accident Date | 2001-03-15 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Over-exertion in lifting objects |
Ocupation | Blaster, Shooter, Shotfirer, Explosive worker, Powder gang/monkey |
Narrative | EMPLOYEE WAS LIFTING A BOX OF PRIMERS AND STRAINED RIGHT LEG. |
Inspections
Start Date | 2002-10-07 |
End Date | 2003-03-26 |
Activity | Regular Inspection |
Number Inspectors | 1 |
Total Hours | 23 |
Start Date | 2002-06-20 |
End Date | 2002-08-26 |
Activity | Regular Inspection |
Number Inspectors | 1 |
Total Hours | 40 |
Start Date | 2001-10-01 |
End Date | 2002-03-28 |
Activity | Regular Inspection |
Number Inspectors | 1 |
Total Hours | 52 |
Start Date | 2001-04-16 |
End Date | 2001-09-24 |
Activity | Regular Inspection |
Number Inspectors | 1 |
Total Hours | 66 |
Productions
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2002 |
Annual Hours | 30927 |
Annual Coal Prod | 93992 |
Avg. Annual Empl. | 20 |
Avg. Employee Hours | 1546 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2002 |
Annual Hours | 10855 |
Avg. Annual Empl. | 6 |
Avg. Employee Hours | 1809 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2001 |
Annual Hours | 61714 |
Annual Coal Prod | 313669 |
Avg. Annual Empl. | 27 |
Avg. Employee Hours | 2286 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2001 |
Annual Hours | 15016 |
Avg. Annual Empl. | 8 |
Avg. Employee Hours | 1877 |
Parties
Name | Island Fork Construction Ltd |
Role | Operator |
Start Date | 2001-09-01 |
Name | Amon L Mahon |
Role | Current Controller |
Start Date | 2001-09-01 |
Name | Island Fork Construction Ltd |
Role | Current Operator |
Inspections
Start Date | 2002-03-20 |
End Date | 2002-03-20 |
Activity | Regular Inspection |
Number Inspectors | 1 |
Total Hours | 3 |
Start Date | 2002-03-15 |
End Date | 2002-03-15 |
Activity | Regular Inspection |
Number Inspectors | 0 |
Total Hours | 0 |
Start Date | 2002-02-28 |
End Date | 2002-02-28 |
Activity | ACCIDENT PREVENTION SPOT INSPECTION |
Number Inspectors | 1 |
Total Hours | 4 |
Start Date | 2001-09-25 |
End Date | 2001-09-27 |
Activity | Regular Inspection |
Number Inspectors | 1 |
Total Hours | 13 |
Productions
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2002 |
Annual Hours | 1666 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 5 |
Avg. Employee Hours | 333 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2001 |
Annual Hours | 9057 |
Annual Coal Prod | 1042 |
Avg. Annual Empl. | 16 |
Avg. Employee Hours | 566 |
Directions to Mine | 2.5 miles SE of White Plains on Mt. Carmel-Pond River Road. |
Parties
Name | Island Fork Construction, LTD |
Role | Operator |
Start Date | 2002-06-11 |
Name | Amon L Mahon |
Role | Current Controller |
Start Date | 2002-06-11 |
Name | Island Fork Construction, LTD |
Role | Current Operator |
Inspections
Start Date | 2003-04-01 |
End Date | 2003-09-12 |
Activity | Regular Inspection |
Number Inspectors | 1 |
Total Hours | 37 |
Start Date | 2003-03-13 |
End Date | 2003-03-31 |
Activity | RESP DUST TECH INSP - SURFACE MINES |
Number Inspectors | 1 |
Total Hours | 19.5 |
Start Date | 2003-03-06 |
End Date | 2003-03-10 |
Activity | NOISE TECHNICAL INVESTIGATION |
Number Inspectors | 1 |
Total Hours | 21 |
Start Date | 2002-10-03 |
End Date | 2003-03-26 |
Activity | Regular Inspection |
Number Inspectors | 2 |
Total Hours | 48.5 |
Start Date | 2002-08-27 |
End Date | 2002-09-26 |
Activity | Regular Inspection |
Number Inspectors | 1 |
Total Hours | 22 |
Productions
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2003 |
Annual Hours | 25380 |
Annual Coal Prod | 170176 |
Avg. Annual Empl. | 24 |
Avg. Employee Hours | 1058 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2002 |
Annual Hours | 23111 |
Annual Coal Prod | 121057 |
Avg. Annual Empl. | 20 |
Avg. Employee Hours | 1156 |
Sources: Kentucky Secretary of State