Providence #1 Prep Plant
|
Facility
|
Abandoned
|
Coal (Bituminous)
|
|
Directions to Mine |
1.2 miles South of intersecion of Rt 814 & Rt 41-A
|
Parties
Name
|
Island Creek Coal Company
|
Role
|
Operator
|
Start Date
|
1950-01-01
|
End Date
|
1993-06-30
|
|
Name
|
Island Creek Coal Company
|
Role
|
Operator
|
Start Date
|
1993-07-01
|
End Date
|
1994-12-11
|
|
Name
|
Victory Processing Inc
|
Role
|
Operator
|
Start Date
|
1994-12-12
|
End Date
|
1995-01-19
|
|
Name
|
No.1 Contractor Inc.
|
Role
|
Operator
|
Start Date
|
2001-11-12
|
|
Name
|
Victory Processing Inc
|
Role
|
Operator
|
Start Date
|
1995-01-20
|
End Date
|
1996-10-31
|
|
Name
|
Victory Processing Inc
|
Role
|
Operator
|
Start Date
|
1996-11-01
|
End Date
|
2001-11-11
|
|
Name
|
Kenneth O Taylor Jr
|
Role
|
Current Controller
|
Start Date
|
2001-11-12
|
|
Name
|
No.1 Contractor Inc.
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2004-05-25
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Fall onto or against objects
|
Ocupation |
Laborer, Blacksmith, Bull gang, Parts runner, Roustabout, Pick-up man, Pitman
|
Narrative |
STANDING ON ROUNDED PUMP TOP WITH FEET WET. SLIPPED ANF FELL.
|
|
Accident Date |
2001-12-29
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Over-exertion NEC
|
Ocupation |
Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech
|
Narrative |
SLIPPED ON STEPS OF FRONT END LOADER WHILE STARTING ENGINE RESULTING IN A PULLED MUSCLE IN BACK.
|
|
Inspections
Start Date |
2004-10-19
|
End Date |
2004-12-15
|
Activity |
Regular Inspection
|
Number Inspectors |
2
|
Total Hours |
18
|
|
Start Date |
2004-04-01
|
End Date |
2004-09-27
|
Activity |
Regular Inspection
|
Number Inspectors |
2
|
Total Hours |
94
|
|
Start Date |
2004-03-01
|
End Date |
2004-03-01
|
Activity |
SPOT INSPECTION
|
Number Inspectors |
1
|
Total Hours |
8
|
|
Start Date |
2003-09-30
|
End Date |
2004-02-19
|
Activity |
Regular Inspection
|
Number Inspectors |
2
|
Total Hours |
110.75
|
|
Start Date |
2003-05-09
|
End Date |
2003-09-25
|
Activity |
Regular Inspection
|
Number Inspectors |
4
|
Total Hours |
131.75
|
|
Start Date |
2003-04-03
|
End Date |
2003-04-10
|
Activity |
ELECTRICAL SPOT INSPECTION
|
Number Inspectors |
1
|
Total Hours |
22
|
|
Start Date |
2003-03-12
|
End Date |
2003-03-12
|
Activity |
SPOT INSPECTION
|
Number Inspectors |
1
|
Total Hours |
8
|
|
Start Date |
2003-02-20
|
End Date |
2003-02-20
|
Activity |
NOISE TECHNICAL INVESTIGATION
|
Number Inspectors |
1
|
Total Hours |
9.5
|
|
Start Date |
2002-10-28
|
End Date |
2002-11-14
|
Activity |
RESP DUST TECH INSP - SURFACE MINES
|
Number Inspectors |
2
|
Total Hours |
67.75
|
|
Start Date |
2002-10-04
|
End Date |
2003-02-26
|
Activity |
Regular Inspection
|
Number Inspectors |
4
|
Total Hours |
95.25
|
|
Start Date |
2002-09-25
|
End Date |
2002-10-02
|
Activity |
RESP DUST TECH INSP - SURFACE MINES
|
Number Inspectors |
1
|
Total Hours |
16
|
|
Start Date |
2002-09-18
|
End Date |
2002-09-19
|
Activity |
SPOT INSPECTION
|
Number Inspectors |
1
|
Total Hours |
16
|
|
Start Date |
2002-09-17
|
End Date |
2002-10-03
|
Activity |
ELECTRICAL SPOT INSPECTION
|
Number Inspectors |
1
|
Total Hours |
33
|
|
Start Date |
2002-09-16
|
End Date |
2002-09-17
|
Activity |
NOISE TECHNICAL INVESTIGATION
|
Number Inspectors |
1
|
Total Hours |
15.5
|
|
Start Date |
2002-09-09
|
End Date |
2002-09-18
|
Activity |
RESP DUST TECH INSP - SURFACE MINES
|
Number Inspectors |
1
|
Total Hours |
17
|
|
Start Date |
2002-04-04
|
End Date |
2002-09-09
|
Activity |
Regular Inspection
|
Number Inspectors |
1
|
Total Hours |
33
|
|
Start Date |
2002-01-22
|
End Date |
2002-03-15
|
Activity |
ELECTRICAL INSPECTION
|
Number Inspectors |
2
|
Total Hours |
78
|
|
Start Date |
2001-12-17
|
End Date |
2002-03-20
|
Activity |
Regular Inspection
|
Number Inspectors |
1
|
Total Hours |
49
|
|
Productions
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2004
|
Annual Hours
|
8031
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
2677
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2004
|
Annual Hours
|
7039
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
2346
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2003
|
Annual Hours
|
14155
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
2831
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2003
|
Annual Hours
|
5437
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
1812
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2002
|
Annual Hours
|
12111
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
2422
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2002
|
Annual Hours
|
1824
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1824
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2001
|
Annual Hours
|
529
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
176
|
|
|
No 1 Mine
|
Surface
|
Abandoned
|
Coal (Bituminous)
|
|
Parties
Name
|
No 1 Contractor Inc
|
Role
|
Operator
|
Start Date
|
1996-05-01
|
|
Name
|
Kenneth O Taylor Jr
|
Role
|
Current Controller
|
Start Date
|
1996-05-01
|
|
Name
|
No 1 Contractor Inc
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2000-10-03
|
Degree Inhury |
PERM TOT OR PERM PRTL DISABLTY
|
Accident Type |
Struck against stationary object
|
Ocupation |
Mine manager, Mine foreman, Mine owner
|
Narrative |
SCREWING NUT OFF FAIRLEAD SHAFT WITH PIPE WRENCHSLIPPED AND CUT OFF END OF INDEX FINGER.
|
|
Accident Date |
2000-09-28
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Caught in, under or between NEC
|
Ocupation |
Welder (shop)
|
Narrative |
CHANGING BIT ON DRILL, CUTTING ONE FINGER & BREAKING ONE FINGER.
|
|
Accident Date |
2000-07-31
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Fall onto or against objects
|
Ocupation |
Mine manager, Mine foreman, Mine owner
|
Narrative |
EE TURN TO WALK AWAY FROM PUMP, SLIPPED AND FELL AGAINST PUMP.
|
|
Accident Date |
2000-03-01
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Fall from machine
|
Ocupation |
Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech
|
Narrative |
EE WAS SERVICING DOZER WITH MACK FUEL TRUCK. EE PULLED ON HOSE TO RELEASE REEL. HOSE CAUGHT FIRST TIME THE EE JERKED HARDER ON HOSE. REEL RELEASED AND EE LOST BALANCE AND FELL APPROX. 8 1/2 FE ET INJURING BACK.
|
|
Inspections
Start Date |
2002-10-04
|
End Date |
2002-10-15
|
Activity |
Regular Inspection
|
Number Inspectors |
2
|
Total Hours |
8
|
|
Start Date |
2002-04-04
|
End Date |
2002-07-19
|
Activity |
Regular Inspection
|
Number Inspectors |
1
|
Total Hours |
21
|
|
Start Date |
2001-10-01
|
End Date |
2002-03-15
|
Activity |
Regular Inspection
|
Number Inspectors |
1
|
Total Hours |
12
|
|
Start Date |
2001-09-18
|
End Date |
2001-09-19
|
Activity |
NOISE TECHNICAL INVESTIGATION
|
Number Inspectors |
1
|
Total Hours |
17.5
|
|
Start Date |
2001-08-21
|
End Date |
2001-08-28
|
Activity |
NOISE TECHNICAL INVESTIGATION
|
Number Inspectors |
1
|
Total Hours |
38.5
|
|
Start Date |
2001-08-02
|
End Date |
2001-08-03
|
Activity |
NOISE TECHNICAL INVESTIGATION
|
Number Inspectors |
1
|
Total Hours |
11.5
|
|
Start Date |
2001-08-02
|
End Date |
2001-08-15
|
Activity |
RESP DUST TECH INSP - SURFACE MINES
|
Number Inspectors |
1
|
Total Hours |
13
|
|
Start Date |
2001-04-03
|
End Date |
2001-09-26
|
Activity |
Regular Inspection
|
Number Inspectors |
1
|
Total Hours |
74
|
|
Start Date |
2000-10-02
|
End Date |
2001-03-21
|
Activity |
Regular Inspection
|
Number Inspectors |
1
|
Total Hours |
89
|
|
Start Date |
2000-09-18
|
End Date |
2000-11-27
|
Activity |
RESP DUST TECH INSP - SURFACE MINES
|
Number Inspectors |
1
|
Total Hours |
17.5
|
|
Start Date |
2000-04-10
|
End Date |
2000-09-22
|
Activity |
Regular Inspection
|
Number Inspectors |
2
|
Total Hours |
78
|
|
Start Date |
2000-04-10
|
End Date |
2000-05-31
|
Activity |
ELECTRICAL INSPECTION
|
Number Inspectors |
1
|
Total Hours |
60
|
|
Start Date |
2000-03-07
|
End Date |
2000-03-07
|
Activity |
SPOT INSPECTION
|
Number Inspectors |
2
|
Total Hours |
16
|
|
Start Date |
2000-03-07
|
End Date |
2000-03-07
|
Activity |
NOISE TECHNICAL INVESTIGATION
|
Number Inspectors |
1
|
Total Hours |
14
|
|
Start Date |
2000-03-02
|
End Date |
2000-03-03
|
Activity |
NONFATAL INJURY ACCIDENT INV
|
Number Inspectors |
1
|
Total Hours |
7
|
|
Start Date |
2000-01-31
|
End Date |
2000-02-14
|
Activity |
RESP DUST TECH INSP - SURFACE MINES
|
Number Inspectors |
1
|
Total Hours |
14
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2001
|
Annual Hours
|
29487
|
Annual Coal Prod
|
107940
|
Avg. Annual Empl.
|
24
|
Avg. Employee Hours
|
1229
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2001
|
Annual Hours
|
639
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
639
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2001
|
Annual Hours
|
7001
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
1167
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2000
|
Annual Hours
|
27287
|
Annual Coal Prod
|
102870
|
Avg. Annual Empl.
|
33
|
Avg. Employee Hours
|
827
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2000
|
Annual Hours
|
7670
|
Avg. Annual Empl.
|
8
|
Avg. Employee Hours
|
959
|
|
|
Stoney Point Mine
|
Surface
|
Abandoned
|
Coal (Bituminous)
|
|
Directions to Mine |
off Rt #109, 1/4 South of Rt #1034 intersection, along 2.5 miles of haulroad
|
Parties
Name
|
Phoenix Coal Processing Company LLC
|
Role
|
Operator
|
Start Date
|
2007-03-27
|
|
Name
|
No 1 Contractor Inc
|
Role
|
Operator
|
Start Date
|
1998-08-01
|
End Date
|
2007-03-26
|
|
Name
|
Phoenix Coal Corporation
|
Role
|
Current Controller
|
Start Date
|
2007-03-27
|
|
Name
|
Phoenix Coal Processing Company LLC
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2008-07-14
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Struck against a moving object
|
Ocupation |
Crane operator, Mobile equipment operator (MEO), Dragline operator, Dropball operator, Rigger
|
Narrative |
EE had set up crane to lift bed off 777A truck Crane was set up perpendicular to the truck & 3' lower in elevation. Rigging was hooked to bed 3 times. As truck bed was swung, the crane tilted toward truck bed slightly. EE started lowering load & began retracting the boom. Crane stopped tilting, EE thought everything was fine, but the crane suddenly laid against truck bed.
|
|
Accident Date |
2007-05-10
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Over-exertion NEC
|
Ocupation |
Coal/ore shovel operator, Shoveler, Power shoveler
|
Narrative |
Injured party was walking over to the mine foreman's truck when he accidentally stepped into a hole twisting his left knee.
|
|
Accident Date |
2006-03-27
|
Degree Inhury |
DYS AWY FRM WRK & RESTRCTD ACT
|
Accident Type |
Fall from machine
|
Ocupation |
Bulldozer operator, Universal operator, Heavy equipment operator, Operating engineer
|
Narrative |
EE WAS POURING WATER INTO RADIATOR (DOZER). HE SLIPPED AND FELL BACKWARDS ONTO GROUND (DISTANCE APPROX. 4-5'). SPRAIN/STRAIN TO BACK.
|
|
Accident Date |
2002-03-23
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Struck by... NEC
|
Ocupation |
Mine manager, Mine foreman, Mine owner
|
Narrative |
STRUCK THUMB WITH HAMMER, CUT REQUIRED STITCHES.
|
|
Inspections
Start Date |
2008-10-03
|
End Date |
2008-11-17
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
22.5
|
|
Start Date |
2008-04-01
|
End Date |
2008-09-22
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
4
|
Total Hours |
72.25
|
|
Start Date |
2007-10-02
|
End Date |
2008-03-19
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
3
|
Total Hours |
49.5
|
|
Start Date |
2007-08-17
|
End Date |
2007-08-21
|
Activity |
Other Technical Compliance Investigations
|
Number Inspectors |
1
|
Total Hours |
8
|
|
Start Date |
2007-06-26
|
End Date |
2007-09-19
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
35
|
|
Start Date |
2007-05-15
|
End Date |
2007-05-15
|
Activity |
Other Technical Compliance Investigations
|
Number Inspectors |
1
|
Total Hours |
5
|
|
Start Date |
2007-04-18
|
End Date |
2007-04-18
|
Activity |
Other Technical Compliance Investigations
|
Number Inspectors |
1
|
Total Hours |
6
|
|
Start Date |
2006-10-05
|
End Date |
2006-10-26
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
9
|
|
Start Date |
2006-04-05
|
End Date |
2006-08-15
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
12
|
|
Start Date |
2005-10-04
|
End Date |
2006-02-24
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
12
|
|
Start Date |
2005-04-14
|
End Date |
2005-09-16
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
18
|
|
Start Date |
2004-10-04
|
End Date |
2005-01-21
|
Activity |
Regular Inspection
|
Number Inspectors |
4
|
Total Hours |
44
|
|
Start Date |
2004-04-19
|
End Date |
2004-09-29
|
Activity |
Regular Inspection
|
Number Inspectors |
3
|
Total Hours |
179.25
|
|
Start Date |
2003-12-05
|
End Date |
2003-12-09
|
Activity |
ELECTRICAL INSPECTION
|
Number Inspectors |
1
|
Total Hours |
16
|
|
Start Date |
2003-09-30
|
End Date |
2004-03-23
|
Activity |
Regular Inspection
|
Number Inspectors |
0
|
Total Hours |
0
|
|
Start Date |
2003-09-30
|
End Date |
2004-03-23
|
Activity |
Regular Inspection
|
Number Inspectors |
2
|
Total Hours |
78.5
|
|
Start Date |
2003-04-04
|
End Date |
2003-09-09
|
Activity |
Regular Inspection
|
Number Inspectors |
2
|
Total Hours |
57
|
|
Start Date |
2002-10-04
|
End Date |
2003-03-27
|
Activity |
Regular Inspection
|
Number Inspectors |
2
|
Total Hours |
77
|
|
Start Date |
2002-09-30
|
End Date |
2002-09-30
|
Activity |
NOISE TECHNICAL INVESTIGATION
|
Number Inspectors |
1
|
Total Hours |
6.25
|
|
Start Date |
2002-09-30
|
End Date |
2002-10-24
|
Activity |
RESP DUST TECH INSP - SURFACE MINES
|
Number Inspectors |
1
|
Total Hours |
9.75
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2008
|
Annual Hours
|
24025
|
Annual Coal Prod
|
80492
|
Avg. Annual Empl.
|
19
|
Avg. Employee Hours
|
1264
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2007
|
Annual Hours
|
35535
|
Annual Coal Prod
|
172517
|
Avg. Annual Empl.
|
23
|
Avg. Employee Hours
|
1545
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2006
|
Annual Hours
|
637
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
637
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2004
|
Annual Hours
|
77240
|
Annual Coal Prod
|
328426
|
Avg. Annual Empl.
|
30
|
Avg. Employee Hours
|
2575
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2004
|
Annual Hours
|
8460
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
2115
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2003
|
Annual Hours
|
56464
|
Annual Coal Prod
|
196262
|
Avg. Annual Empl.
|
24
|
Avg. Employee Hours
|
2353
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2003
|
Annual Hours
|
9600
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
1920
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2002
|
Annual Hours
|
42412
|
Annual Coal Prod
|
188470
|
Avg. Annual Empl.
|
18
|
Avg. Employee Hours
|
2356
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2002
|
Annual Hours
|
13465
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
1924
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2001
|
Annual Hours
|
7265
|
Annual Coal Prod
|
8337
|
Avg. Annual Empl.
|
19
|
Avg. Employee Hours
|
382
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2001
|
Annual Hours
|
2304
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
384
|
|
|
Stony Point Mine
|
Surface
|
Abandoned
|
Coal (Bituminous)
|
|
Parties
Role
|
Current Controller
|
Start Date
|
1950-01-01
|
|
Name
|
No 1 Contractor Inc
|
Role
|
Current Operator
|
|
|
No 2
|
Surface
|
Abandoned
|
Coal (Bituminous)
|
|
Directions to Mine |
Off Rt #109, 1/4 mile South of Rt # 1034 intersection along 2.5 miles of haulroad in Hopkins County KY near Nebo
|
Parties
Name
|
No 1 Contractor Inc
|
Role
|
Operator
|
Start Date
|
2007-06-04
|
|
Name
|
Kenneth O Taylor Jr
|
Role
|
Current Controller
|
Start Date
|
2007-06-04
|
|
Name
|
No 1 Contractor Inc
|
Role
|
Current Operator
|
|
Inspections
Start Date |
2007-06-26
|
End Date |
2007-08-28
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
14.5
|
|
Start Date |
2007-06-25
|
End Date |
2007-06-25
|
Activity |
Other Technical Compliance Investigations
|
Number Inspectors |
1
|
Total Hours |
7
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2007
|
Annual Hours
|
347
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
347
|
|
|