Marion Mine & Mill
|
Underground
|
Abandoned
|
Crushed, Broken Limestone NEC
|
|
Directions to Mine |
Crittenden County, 8 miles East of Marion on Hwy. 60 East, Mine of left side of road.
|
Parties
Name
|
Kentucky Stone Company
|
Role
|
Operator
|
Start Date
|
1950-01-01
|
End Date
|
1988-11-13
|
|
Name
|
Hanson Aggregates Midwest Inc
|
Role
|
Operator
|
Start Date
|
1988-11-14
|
End Date
|
2000-11-30
|
|
Name
|
Rogers Group Inc
|
Role
|
Operator
|
Start Date
|
2000-12-01
|
|
Name
|
Rogers Group Inc
|
Role
|
Current Controller
|
Start Date
|
2000-12-01
|
|
Name
|
Rogers Group Inc
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2009-08-11
|
Degree Inhury |
DAYS RESTRICTED ACTIVITY ONLY
|
Accident Type |
Over-exertion NEC
|
Ocupation |
Laborer, Bull gang, Parts runner, Roustabout, Roof trimmer/scaler
|
Narrative |
Employee stepped onto a working platform that had different grating and rolled his ankle.
|
|
Accident Date |
2009-08-01
|
Degree Inhury |
DAYS RESTRICTED ACTIVITY ONLY
|
Accident Type |
Fall to lower level, NEC
|
Ocupation |
Laborer, Bull gang, Parts runner, Roustabout, Roof trimmer/scaler
|
Narrative |
EE had finished scaling the face and was standing on a piece of loose rock to see if he missed any. His ankle rolled off the rock and he heard a pop.
|
|
Accident Date |
2004-06-17
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Struck by... NEC
|
Ocupation |
Driller operator
|
Narrative |
employee was changing a drill bit . he hit the old bit with a hammer when a fragment hit him below the knee
|
|
Accident Date |
2000-05-23
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Caught in, under or between NEC
|
Ocupation |
Bulldozer operator, Universal operator, Heavy equipment operator, Operating engineer
|
Narrative |
EMPLOYEE WAS SHUTTING DOORS TO SCREEN AND MASHEDHIS LEFT RING FINGER AND LEFT MIDDLE FINGER.
|
|
Inspections
Start Date |
2011-11-08
|
End Date |
2011-11-09
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
5.5
|
|
Start Date |
2011-02-07
|
End Date |
2011-02-07
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
3
|
|
Start Date |
2010-11-29
|
End Date |
2010-12-01
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
5.5
|
|
Start Date |
2010-11-16
|
End Date |
2010-11-18
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
45.75
|
|
Start Date |
2010-07-28
|
End Date |
2010-07-28
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
5.75
|
|
Start Date |
2010-07-12
|
End Date |
2010-07-15
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
20.25
|
|
Start Date |
2010-04-28
|
End Date |
2010-04-28
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
4.5
|
|
Start Date |
2010-04-12
|
End Date |
2010-04-19
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
45.5
|
|
Start Date |
2010-04-06
|
End Date |
2010-04-06
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
2.75
|
|
Start Date |
2010-02-22
|
End Date |
2010-02-22
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
7.75
|
|
Start Date |
2010-02-08
|
End Date |
2010-02-10
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
29.5
|
|
Start Date |
2009-12-15
|
End Date |
2009-12-15
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
4.75
|
|
Start Date |
2009-11-23
|
End Date |
2009-11-24
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
8
|
|
Start Date |
2009-10-19
|
End Date |
2009-11-05
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
45.25
|
|
Start Date |
2009-09-16
|
End Date |
2009-09-16
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
4
|
|
Start Date |
2009-08-24
|
End Date |
2009-08-25
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
2
|
Total Hours |
28.25
|
|
Start Date |
2009-07-20
|
End Date |
2009-08-06
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
114
|
|
Start Date |
2009-07-15
|
End Date |
2009-07-15
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
4.25
|
|
Start Date |
2009-06-24
|
End Date |
2009-06-24
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
5.75
|
|
Start Date |
2009-05-26
|
End Date |
2009-06-11
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
49.5
|
|
Productions
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2011
|
Annual Hours
|
260
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
260
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2011
|
Annual Hours
|
243
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
243
|
|
Sub-Unit Desc
|
UNDERGROUND
|
Year
|
2010
|
Annual Hours
|
9418
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
8
|
Avg. Employee Hours
|
1177
|
|
Sub-Unit Desc
|
SURFACE AT UNDERGROUND
|
Year
|
2010
|
Annual Hours
|
1602
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1602
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2010
|
Annual Hours
|
8427
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
1685
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2010
|
Annual Hours
|
3228
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1614
|
|
Sub-Unit Desc
|
UNDERGROUND
|
Year
|
2009
|
Annual Hours
|
13820
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
9
|
Avg. Employee Hours
|
1536
|
|
Sub-Unit Desc
|
SURFACE AT UNDERGROUND
|
Year
|
2009
|
Annual Hours
|
3799
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1900
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2009
|
Annual Hours
|
10244
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
2049
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2009
|
Annual Hours
|
4975
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1244
|
|
Sub-Unit Desc
|
UNDERGROUND
|
Year
|
2008
|
Annual Hours
|
8959
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
9
|
Avg. Employee Hours
|
995
|
|
Sub-Unit Desc
|
SURFACE AT UNDERGROUND
|
Year
|
2008
|
Annual Hours
|
1244
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
622
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2008
|
Annual Hours
|
6889
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
1378
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2008
|
Annual Hours
|
4118
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1030
|
|
Sub-Unit Desc
|
UNDERGROUND
|
Year
|
2007
|
Annual Hours
|
14013
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
8
|
Avg. Employee Hours
|
1752
|
|
Sub-Unit Desc
|
SURFACE AT UNDERGROUND
|
Year
|
2007
|
Annual Hours
|
4062
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
2031
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2007
|
Annual Hours
|
8237
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
2059
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2007
|
Annual Hours
|
5068
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1267
|
|
Sub-Unit Desc
|
UNDERGROUND
|
Year
|
2006
|
Annual Hours
|
12809
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
10
|
Avg. Employee Hours
|
1281
|
|
Sub-Unit Desc
|
SURFACE AT UNDERGROUND
|
Year
|
2006
|
Annual Hours
|
2977
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1489
|
|
|
Princeton Mine
|
Underground
|
Active
|
Crushed, Broken Sandstone
|
|
Directions to Mine |
From the office turn right onto N Main St, turn right onto I69 S, Take exit 81 for KY 293 toward Princeton/Providence, take slight left onto ramp to KY 293 S/N Jeffereson St., turn left on KY 293/N Jefferson St, Turn right onto W Market St, Turn left onto W Court Square/N Harrison St, Turn left onto W Main St, Continue straight onto E Main St, Turn right onto CS-1199/N Eagle St, Turn left onto KY 91 S/Hopkinsville st, slight right into Mine
|
Parties
Name
|
Kentucky Stone Company
|
Role
|
Operator
|
Start Date
|
1950-01-01
|
End Date
|
1988-11-13
|
|
Name
|
Hanson Aggregates Midwest Inc
|
Role
|
Operator
|
Start Date
|
1988-11-14
|
End Date
|
2000-11-30
|
|
Name
|
Rogers Group Inc
|
Role
|
Operator
|
Start Date
|
2000-12-01
|
|
Name
|
Rogers Group Inc
|
Role
|
Current Controller
|
Start Date
|
2000-12-01
|
|
Name
|
Rogers Group Inc
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2024-06-20
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Over-exertion in lifting objects
|
Ocupation |
Bulldozer operator, Universal operator, Heavy equipment operator, Operating engineer
|
Narrative |
Employee lifted a chute door to put it back into place (estimated 40lbs) and tore left bicep.
|
|
Inspections
Start Date |
2024-11-18
|
End Date |
2024-11-26
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
3
|
Total Hours |
62.5
|
|
Start Date |
2024-07-01
|
End Date |
2024-07-05
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
37.5
|
|
Start Date |
2024-04-02
|
End Date |
2024-04-08
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
39.5
|
|
Start Date |
2024-02-26
|
End Date |
2024-03-11
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
48
|
|
Start Date |
2024-02-12
|
End Date |
2024-02-20
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
47
|
|
Start Date |
2023-10-31
|
End Date |
2023-11-13
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
28.5
|
|
Start Date |
2023-07-31
|
End Date |
2023-08-01
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
20
|
|
Start Date |
2023-05-17
|
End Date |
2023-05-17
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
6.5
|
|
Start Date |
2023-05-07
|
End Date |
2023-05-09
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
17.25
|
|
Start Date |
2023-04-10
|
End Date |
2023-04-11
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
18.5
|
|
Start Date |
2023-01-17
|
End Date |
2023-01-23
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
42
|
|
Start Date |
2022-10-18
|
End Date |
2022-12-06
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
101
|
|
Start Date |
2022-09-19
|
End Date |
2022-10-06
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
17.5
|
|
Start Date |
2022-08-08
|
End Date |
2022-08-15
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
116.5
|
|
Start Date |
2022-04-18
|
End Date |
2022-04-25
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
24.75
|
|
Start Date |
2022-03-28
|
End Date |
2022-03-29
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
20.5
|
|
Start Date |
2022-01-04
|
End Date |
2022-01-10
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
31.5
|
|
Start Date |
2021-10-04
|
End Date |
2021-10-18
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
27.5
|
|
Start Date |
2021-09-13
|
End Date |
2021-09-28
|
Activity |
Electrical Technical Investigation
|
Number Inspectors |
3
|
Total Hours |
62.5
|
|
Start Date |
2021-07-06
|
End Date |
2021-07-29
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
69
|
|
Productions
Sub-Unit Desc
|
UNDERGROUND
|
Year
|
2024
|
Annual Hours
|
1562
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
391
|
|
Sub-Unit Desc
|
SURFACE AT UNDERGROUND
|
Year
|
2024
|
Annual Hours
|
11773
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
1962
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2024
|
Annual Hours
|
29695
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
16
|
Avg. Employee Hours
|
1856
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2024
|
Annual Hours
|
7670
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1918
|
|
Sub-Unit Desc
|
UNDERGROUND
|
Year
|
2023
|
Annual Hours
|
1963
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
393
|
|
Sub-Unit Desc
|
SURFACE AT UNDERGROUND
|
Year
|
2023
|
Annual Hours
|
13723
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
1960
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2023
|
Annual Hours
|
23992
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
12
|
Avg. Employee Hours
|
1999
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2023
|
Annual Hours
|
8177
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
2044
|
|
Sub-Unit Desc
|
UNDERGROUND
|
Year
|
2022
|
Annual Hours
|
3150
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
525
|
|
Sub-Unit Desc
|
SURFACE AT UNDERGROUND
|
Year
|
2022
|
Annual Hours
|
9682
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
1383
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2022
|
Annual Hours
|
24052
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
16
|
Avg. Employee Hours
|
1503
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2022
|
Annual Hours
|
7989
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
1598
|
|
Sub-Unit Desc
|
UNDERGROUND
|
Year
|
2021
|
Annual Hours
|
2245
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
449
|
|
Sub-Unit Desc
|
SURFACE AT UNDERGROUND
|
Year
|
2021
|
Annual Hours
|
7045
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
1006
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2021
|
Annual Hours
|
14270
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
10
|
Avg. Employee Hours
|
1427
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2021
|
Annual Hours
|
7003
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1751
|
|
Sub-Unit Desc
|
UNDERGROUND
|
Year
|
2020
|
Annual Hours
|
1867
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
267
|
|
Sub-Unit Desc
|
SURFACE AT UNDERGROUND
|
Year
|
2020
|
Annual Hours
|
6288
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
1048
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2020
|
Annual Hours
|
11985
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
11
|
Avg. Employee Hours
|
1090
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2020
|
Annual Hours
|
6737
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
1347
|
|
|
Canton Quarry
|
Surface
|
Active
|
Crushed, Broken Limestone NEC
|
|
Directions to Mine |
I-69/Pennyrile pkwy to KY- 1682W (Exit 11), take KY-1682W then right onto US-68W, turn right on Canton Blue Springs Rd, mine is on right Rogers Group Canton Quarry 2934 Canton Blue Bl Springs Road, Cadiz, KY 42211
|
Parties
Name
|
Kentucky Stone Company
|
Role
|
Operator
|
Start Date
|
1950-01-01
|
End Date
|
1988-11-13
|
|
Name
|
Hanson Aggregates Midwest Inc
|
Role
|
Operator
|
Start Date
|
1988-11-14
|
End Date
|
2000-11-30
|
|
Name
|
Rogers Group, Inc
|
Role
|
Operator
|
Start Date
|
2000-12-01
|
|
Name
|
Rogers Group Inc
|
Role
|
Current Controller
|
Start Date
|
2000-12-01
|
|
Name
|
Rogers Group, Inc
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2024-12-19
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Struck by... NEC
|
Ocupation |
Warehouseman, Bagger, Palletizer/Stacker, Store keeper, Packager, Fabricator, Cleaning plant operator
|
Narrative |
Pliers slipped and hit employee in teeth breaking the two front teeth.
|
|
Accident Date |
2017-07-25
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Caught in, under or between a moving and a stationary object
|
Ocupation |
Driller, Highwall operator, Highwall drill operator
|
Narrative |
Driller was changing steels and smashed finger between the 48 wrench and drill mast.
|
|
Accident Date |
2009-07-28
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Fall to the walkway or working surface
|
Ocupation |
Warehouseman, Bagger, Palletizer/Stacker, Store keeper, Packager, Fabricator, Cleaning plant operator
|
Narrative |
After further investigation by the mine company on 01/15/09, it was determine that this incident was an injury. EE was pulling an empty water hose that was caught on a ladder. When the hose caught on the ladder it caused the ee to abruptly stop and fall backwards. Where the ee fell it was dry, even and clear of debris. EE sprained his right shoulder.
|
|
Accident Date |
2008-09-18
|
Degree Inhury |
DAYS RESTRICTED ACTIVITY ONLY
|
Accident Type |
Over-exertion NEC
|
Ocupation |
Belt foreman, Maintenance foreman, Maintenance supervisor
|
Narrative |
A maintenance leader was helping a quality control employee take a bulk sample when he heard his right knee pop.
|
|
Inspections
Start Date |
2024-11-21
|
End Date |
2024-11-26
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
9.25
|
|
Start Date |
2024-06-26
|
End Date |
2024-06-27
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
13.5
|
|
Start Date |
2024-03-11
|
End Date |
2024-03-18
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
16.5
|
|
Start Date |
2023-10-25
|
End Date |
2023-11-07
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
21.5
|
|
Start Date |
2023-04-12
|
End Date |
2023-04-13
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
17
|
|
Start Date |
2022-12-12
|
End Date |
2022-12-13
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
11
|
|
Start Date |
2022-04-20
|
End Date |
2022-04-25
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
11.75
|
|
Start Date |
2022-03-30
|
End Date |
2022-03-30
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
17.5
|
|
Start Date |
2022-02-01
|
End Date |
2022-02-04
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
15
|
|
Start Date |
2021-06-10
|
End Date |
2021-06-11
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
12.5
|
|
Start Date |
2021-01-21
|
End Date |
2021-01-22
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
12
|
|
Start Date |
2020-10-05
|
End Date |
2020-10-06
|
Activity |
Electrical Technical Investigation
|
Number Inspectors |
1
|
Total Hours |
7
|
|
Start Date |
2020-08-05
|
End Date |
2020-08-06
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
15
|
|
Start Date |
2020-01-15
|
End Date |
2020-01-16
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
18
|
|
Start Date |
2019-10-09
|
End Date |
2019-10-09
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
3
|
|
Start Date |
2019-09-19
|
End Date |
2019-09-19
|
Activity |
Part 50 Audit
|
Number Inspectors |
1
|
Total Hours |
4
|
|
Start Date |
2019-06-05
|
End Date |
2019-06-05
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
8
|
|
Start Date |
2019-01-03
|
End Date |
2019-01-04
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
11.5
|
|
Start Date |
2018-05-22
|
End Date |
2018-05-22
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
11
|
|
Start Date |
2018-02-21
|
End Date |
2018-02-21
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
7.5
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2024
|
Annual Hours
|
3089
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
772
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2024
|
Annual Hours
|
6687
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
1115
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2024
|
Annual Hours
|
5661
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
1887
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2023
|
Annual Hours
|
3613
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
903
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2023
|
Annual Hours
|
9511
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
1585
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2023
|
Annual Hours
|
3614
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
1205
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2022
|
Annual Hours
|
2303
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
384
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2022
|
Annual Hours
|
4612
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
769
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2022
|
Annual Hours
|
1761
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
881
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2021
|
Annual Hours
|
1625
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
406
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2021
|
Annual Hours
|
7241
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
8
|
Avg. Employee Hours
|
905
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2021
|
Annual Hours
|
3592
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
1197
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2020
|
Annual Hours
|
1237
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
309
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2020
|
Annual Hours
|
6963
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
8
|
Avg. Employee Hours
|
870
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2020
|
Annual Hours
|
5865
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1466
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2019
|
Annual Hours
|
4293
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
613
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2019
|
Annual Hours
|
4771
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
954
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2019
|
Annual Hours
|
5550
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1388
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2018
|
Annual Hours
|
2422
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
484
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2018
|
Annual Hours
|
3996
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
1332
|
|
|
FLEMINGSBURG QUARRY
|
Surface
|
Active
|
Crushed, Broken Limestone NEC
|
|
Directions to Mine |
Travel 114 to Salyersville continue on Mt. Parkway to 205 N on the right, turn left on 705 then stay straight on 36W, turn right on KY1325, then turn right on KY 11N/KY1325 mines app. 8 miles.
|
Parties
Name
|
Kentucky Stone Company
|
Role
|
Operator
|
Start Date
|
1950-01-01
|
End Date
|
1988-11-13
|
|
Name
|
Heidelberg Materials Midwest Agg, Inc.
|
Role
|
Operator
|
Start Date
|
1988-11-14
|
|
Name
|
Heidelberg Materials AG
|
Role
|
Current Controller
|
Start Date
|
1988-11-14
|
|
Name
|
Heidelberg Materials Midwest Agg, Inc.
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2021-03-24
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Fall onto or against objects
|
Ocupation |
Haul/Off road/Coal/Ore/Pit/Quarry/Rock/Rubber tire truck driver, Transportation truck driver
|
Narrative |
An employee climbed over a hand rail at the primary plant crusher and lost their footing. When the employee slipped, they struck their right side on the handrail. Employee was taken for x-rays and there were no rib fractures. Employee returned to work that day.
|
|
Accident Date |
2020-06-26
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Struck against a moving object
|
Ocupation |
Haul/Off road/Coal/Ore/Pit/Quarry/Rock/Rubber tire truck driver, Transportation truck driver
|
Narrative |
A CAT 773 Haul Truck was passing through the North pit gate, at the same time a CAT 773 was traveling the same route in the opposite direction. As the two vehicles passed, the catwalk on the North bound truck struck the rear fender of the South bound truck.
|
|
Accident Date |
2016-03-01
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Contact with hot objects or substances
|
Ocupation |
Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech
|
Narrative |
Using acetylene torch to remove pin, burnt into oil cavity of the pin causing the hot oil to flash and come back on burning face
|
|
Accident Date |
2012-11-20
|
Degree Inhury |
INJURIES INVOLVNG NONEMPLOYEES
|
Accident Type |
Fall to lower level, NEC
|
Ocupation |
Miner, Prospector, NEC
|
Narrative |
A body was found in the West pit area on 11/20/2012 at approximately 14:00 hours at the Flemingsburg Quarry. Investigation is ongoing.
|
|
Accident Date |
2006-03-13
|
Degree Inhury |
DYS AWY FRM WRK & RESTRCTD ACT
|
Accident Type |
Struck by flying object
|
Ocupation |
Laborer, Blacksmith, Bull gang, Parts runner, Roustabout, Pick-up man, Pitman
|
Narrative |
Two employees were attempting to drive a pin from the bucket of a Samsung SE280 trackhoe. The employee swinging the twenty pound sledgehammer missed the pin and lost his hold on the hammer. The hammer flew approx. 8 feet, striking another employee in the leg. This resulted in a fracture.
|
|
Accident Date |
2006-01-21
|
Degree Inhury |
DYS AWY FRM WRK & RESTRCTD ACT
|
Accident Type |
Caught in, under or between NEC
|
Ocupation |
Master mechanic, Foreman, Supervisor
|
Narrative |
Employee was attempting to put a block under a dozer track when the track moved and caught his right thumb between the block and track. The thumb was fractured and had tendon damage.
|
|
Accident Date |
2005-08-02
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Struck by falling object
|
Ocupation |
Warehouseman, Bagger, Palletizer/Stacker, Store keeper, Packager, Fabricator, Cleaning plant operator
|
Narrative |
The employee was helping in the replacement of a adjusting wedge on a pioneer jaw crusher. The employee was attempting to pry the wedge into position when it came unhooked from the come-a-long. The wedge fell striking the employee in the head. The employee suffered a cut over his eye and one on his finger.
|
|
Inspections
Start Date |
2025-01-07
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
8
|
|
Start Date |
2024-04-23
|
End Date |
2024-05-07
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
52.5
|
|
Start Date |
2024-02-12
|
End Date |
2024-02-13
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
13
|
|
Start Date |
2023-07-26
|
End Date |
2023-07-31
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
33.25
|
|
Start Date |
2022-12-28
|
End Date |
2022-12-28
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
6.5
|
|
Start Date |
2022-04-04
|
End Date |
2022-04-11
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
41.25
|
|
Start Date |
2022-03-28
|
End Date |
2022-03-29
|
Activity |
103 (g) Written Notification Hazard Complaint Inspectio
|
Number Inspectors |
1
|
Total Hours |
14.5
|
|
Start Date |
2022-01-04
|
End Date |
2022-01-05
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
10.25
|
|
Start Date |
2021-09-09
|
End Date |
2021-09-23
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
41
|
|
Start Date |
2020-10-13
|
End Date |
2020-11-23
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
56
|
|
Start Date |
2020-10-13
|
End Date |
2020-10-19
|
Activity |
Verbal Hazard Complaint Inspections
|
Number Inspectors |
1
|
Total Hours |
10
|
|
Start Date |
2020-07-08
|
End Date |
2020-07-09
|
Activity |
Verbal Hazard Complaint Inspections
|
Number Inspectors |
1
|
Total Hours |
8.25
|
|
Start Date |
2020-06-29
|
End Date |
2020-06-30
|
Activity |
Verbal Hazard Complaint Inspections
|
Number Inspectors |
1
|
Total Hours |
12.5
|
|
Start Date |
2020-04-28
|
End Date |
2020-04-30
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
22.5
|
|
Start Date |
2019-11-12
|
End Date |
2019-11-14
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
29.5
|
|
Start Date |
2019-05-28
|
End Date |
2019-05-29
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
10
|
|
Start Date |
2018-12-18
|
End Date |
2019-01-03
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
13.25
|
|
Start Date |
2018-06-18
|
End Date |
2018-06-20
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
30.25
|
|
Start Date |
2017-12-06
|
End Date |
2017-12-11
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
15.5
|
|
Start Date |
2017-09-27
|
End Date |
2017-09-27
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
15
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2024
|
Annual Hours
|
4519
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
1506
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2024
|
Annual Hours
|
6845
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1711
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2024
|
Annual Hours
|
1921
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1921
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2023
|
Annual Hours
|
5404
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1351
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2023
|
Annual Hours
|
7686
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1922
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2023
|
Annual Hours
|
1989
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1989
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2022
|
Annual Hours
|
9126
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
1825
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2022
|
Annual Hours
|
7538
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1885
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2022
|
Annual Hours
|
2032
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2032
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2021
|
Annual Hours
|
9751
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
1950
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2021
|
Annual Hours
|
8014
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
2004
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2021
|
Annual Hours
|
2046
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2046
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2020
|
Annual Hours
|
8120
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
2030
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2020
|
Annual Hours
|
9922
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
1984
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2020
|
Annual Hours
|
2067
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2067
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2019
|
Annual Hours
|
8046
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
2012
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2019
|
Annual Hours
|
8619
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
1724
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2019
|
Annual Hours
|
1955
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1955
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2018
|
Annual Hours
|
6861
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1715
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2018
|
Annual Hours
|
7947
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
1589
|
|
|
Tyrone Mine & Mill
|
Underground
|
Active
|
Crushed, Broken Limestone NEC
|
|
Directions to Mine |
1517 Bull Lea Rd Lexington, KY 40511 Get on KY-4 W/US-421 BYP N/W New Cir Rd from Citation Blvd and Newtown Pike 4 min (1.5 mi) Head north toward Bull Lea Rd 164 ft Turn right toward Bull Lea Rd 249 ft Turn right onto Bull Lea Rd 0.2 mi Turn left onto Citation Blvd 0.3 mi Turn right at the 1st cross street onto Newtown Pike 0.7 mi Use the right lane to take the KY-4 W/New Circle Rd ramp to Airport 0.3 mi Follow KY-4 W, US-60 W and KY-9002 W/Bluegrass Pkwy to KY-33 N in Woodford County. Take exit 68 from KY-9002 W/Bluegrass Pkwy 15 min (13.7 mi) Merge onto KY-4 W/US-421 BYP N/W New Cir Rd 1.7 mi Continue onto KY-4 W/W New Cir Rd 2.6 mi Take exit 5B to merge onto US-60 W/Versailles Rd toward Versailles/Bluegrass Pkwy Continue to follow US-60 W 6.2 mi Use the right lane to take the Blue Grass Pkwy ramp to Lawrenceburg/Elizabethtown 0.6 mi Continue onto KY-9002 W/Bluegrass Pkwy 2.4 mi Take exit 68 for KY-33 toward Versailles 0.3 mi Take KY-2113 W/Falling Springs Blvd to US-62 W/Lawrenceburg Rd/Tyrone Pike in Versailles 4 min (2.4 mi) Turn right onto KY-33 N 0.4 mi Turn left onto KY-2113 W/Falling Springs Blvd 2.1 mi Turn left onto US-62 W/Lawrenceburg Rd/Tyrone Pike Continue to follow US-62 W 8 min (6.0 mi) Turn left onto KY-1510 55 s (0.5 mi) 1645 Tyrone Rd Lawrenceburg, KY 40342
|
Parties
Name
|
Kentucky Stone Company
|
Role
|
Operator
|
Start Date
|
1950-01-01
|
End Date
|
1988-11-13
|
|
Name
|
Heidelberg Materials Midwest Agg, Inc.
|
Role
|
Operator
|
Start Date
|
1988-11-14
|
|
Name
|
Heidelberg Materials AG
|
Role
|
Current Controller
|
Start Date
|
1988-11-14
|
|
Name
|
Heidelberg Materials Midwest Agg, Inc.
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2024-12-03
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Over-exertion NEC
|
Ocupation |
Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech
|
Narrative |
Plant Mechanic stepped down from a Ford F-250 plant truck, and turned left ankle when EE touched the floor with their foot. There were no obstructions on the floor at the time of the incident.
|
|
Accident Date |
2019-06-14
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Fall onto or against objects
|
Ocupation |
Front-end loader operator
|
Narrative |
Employee was installing a screen bolt in the screen rail on the middle deck when EE's foot slipped causing EE to fall on EE's side against some metal chute work.
|
|
Accident Date |
2016-07-18
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Over-exertion NEC
|
Ocupation |
Driller operator
|
Narrative |
While the employee was replacing drill steel in drill rig, felt pain in left knee. Conditions were clean and free from debris at the time and location of the incident.
|
|
Accident Date |
2010-04-06
|
Degree Inhury |
DAYS RESTRICTED ACTIVITY ONLY
|
Accident Type |
Over-exertion NEC
|
Ocupation |
Bobcat operator
|
Narrative |
Employee was walking down a flight of stairs on the secondary plant when his right ankle rolled over when stepping from the bottom step to the landing, resulting in a sprained ankle. Steps were dry and free of debris. No lost work days, restricted duty for two working days.
|
|
Accident Date |
2008-10-06
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Struck by flying object
|
Ocupation |
Haul/Off road/Coal/Ore/Pit/Quarry/Rock/Rubber tire truck driver, Transportation truck driver
|
Narrative |
Employee was freeing a lodged flat rock from a head box with a sledge hammer, when a small piece of rock deflected off the top of his safety glasses and hit him on the forehead above his safety glasses, causing a one inch cut above his right eye.
|
|
Accident Date |
2005-07-15
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Struck against stationary object
|
Ocupation |
Laborer, Bull gang, Parts runner, Roustabout, Roof trimmer/scaler
|
Narrative |
EE'S HAND BEING ON WINDOW OPENING AND NOT INSIDE OF CAB OF TRUCK. WET HAUL ROADS DUE TO HUMID CONDITIONS IN MINE. EE GOT 6 STITCHES IN FINGER. NO LOST TIME. FINGER WAS XRAYED.
|
|
Accident Date |
2004-05-18
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Over-exertion NEC
|
Ocupation |
Water truck operator
|
Narrative |
Employee stepped on soft ground while walking across Plant lot and twisted left knee. At first Dr. said it was a sprain. Employee was later sent to Dr. who said employee had some torn cartilage. Later the Dr. decided to do surgery on 8-25-04. There was no lost time until 8-25-04.
|
|
Accident Date |
2001-11-09
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Over-exertion NEC
|
Ocupation |
Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech
|
Narrative |
9/11/01 EE WAS CHANGING A SPEED REDUCER ON THE #4 CONVEYOR. AS EE LIFTED THE SPEED REDUCER HE FELT A PAIN IN BACK WAS REPORTED AS 1ST AID CASE. NO MED TREATMENT WAS REQUIRED. 3/4/02 SAW DR FOR FIRST TIME FOR BACK PAIN RESULT OF 11/09/01 IN CIDENT. RET'D TO DR ON 4/26/02 & WAS UT OFF WORKTHRU 5/24/02
|
|
Inspections
Start Date |
2025-01-07
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
25
|
|
Start Date |
2024-10-15
|
End Date |
2024-10-28
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
19.25
|
|
Start Date |
2024-08-19
|
End Date |
2024-09-03
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
38.5
|
|
Start Date |
2024-08-06
|
End Date |
2024-08-19
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
41.75
|
|
Start Date |
2024-05-07
|
End Date |
2024-05-20
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
34
|
|
Start Date |
2024-01-02
|
End Date |
2024-01-18
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
44
|
|
Start Date |
2023-10-03
|
End Date |
2023-10-06
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
45.5
|
|
Start Date |
2023-10-02
|
End Date |
2023-11-21
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
76
|
|
Start Date |
2023-08-24
|
End Date |
2023-09-13
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
64
|
|
Start Date |
2023-05-17
|
End Date |
2023-05-17
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
5.5
|
|
Start Date |
2023-05-02
|
End Date |
2023-05-15
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
45
|
|
Start Date |
2023-03-03
|
End Date |
2023-03-13
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
57.5
|
|
Start Date |
2023-03-03
|
End Date |
2023-03-03
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
12
|
|
Start Date |
2022-11-23
|
End Date |
2022-12-13
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
77.5
|
|
Start Date |
2022-07-27
|
End Date |
2022-08-17
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
57.25
|
|
Start Date |
2022-05-20
|
End Date |
2022-06-02
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
3
|
Total Hours |
66.25
|
|
Start Date |
2022-03-21
|
End Date |
2022-03-29
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
1
|
|
Start Date |
2022-01-18
|
End Date |
2022-01-24
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
22.5
|
|
Start Date |
2021-10-25
|
End Date |
2021-11-03
|
Activity |
Non-Injury Accident Investigation
|
Number Inspectors |
2
|
Total Hours |
44.5
|
|
Start Date |
2021-10-18
|
End Date |
2021-10-25
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
27
|
|
Productions
Sub-Unit Desc
|
UNDERGROUND
|
Year
|
2024
|
Annual Hours
|
12661
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
10
|
Avg. Employee Hours
|
1266
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2024
|
Annual Hours
|
16808
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
9
|
Avg. Employee Hours
|
1868
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2024
|
Annual Hours
|
5196
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
866
|
|
Sub-Unit Desc
|
UNDERGROUND
|
Year
|
2023
|
Annual Hours
|
20480
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
10
|
Avg. Employee Hours
|
2048
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2023
|
Annual Hours
|
15583
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
9
|
Avg. Employee Hours
|
1731
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2023
|
Annual Hours
|
5362
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
894
|
|
Sub-Unit Desc
|
UNDERGROUND
|
Year
|
2022
|
Annual Hours
|
14776
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
10
|
Avg. Employee Hours
|
1478
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2022
|
Annual Hours
|
14468
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
9
|
Avg. Employee Hours
|
1608
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2022
|
Annual Hours
|
5739
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
957
|
|
Sub-Unit Desc
|
UNDERGROUND
|
Year
|
2021
|
Annual Hours
|
11135
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
1591
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2021
|
Annual Hours
|
12206
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
1744
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2021
|
Annual Hours
|
5384
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
897
|
|
Sub-Unit Desc
|
UNDERGROUND
|
Year
|
2020
|
Annual Hours
|
11137
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
8
|
Avg. Employee Hours
|
1392
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2020
|
Annual Hours
|
12150
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
8
|
Avg. Employee Hours
|
1519
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2020
|
Annual Hours
|
4948
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
825
|
|
Sub-Unit Desc
|
UNDERGROUND
|
Year
|
2019
|
Annual Hours
|
11354
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
10
|
Avg. Employee Hours
|
1135
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2019
|
Annual Hours
|
14042
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
9
|
Avg. Employee Hours
|
1560
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2019
|
Annual Hours
|
4896
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
816
|
|
Sub-Unit Desc
|
UNDERGROUND
|
Year
|
2018
|
Annual Hours
|
9648
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
9
|
Avg. Employee Hours
|
1072
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2018
|
Annual Hours
|
12734
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
9
|
Avg. Employee Hours
|
1415
|
|
|
Irvington Quarry
|
Surface
|
Active
|
Crushed, Broken Limestone NEC
|
|
Directions to Mine |
1382 Hwy 477 Irvington, KY 40246 1. Depart and head east on Bull Lea Rd 79 ft 2. Turn left to stay on Bull Lea Rd 0.1 mi 3. Turn left onto Citation Blvd 0.3 mi 4. Turn left onto KY-922 / Newtown Pike 1.0 mi a. Take the ramp on the right for I-75 North / I-64 West and head toward Cincinnati / Louisville 2.5 mi 5. Keep left, heading toward Frankfort / Louisville 55.8 mi a. At Exit 19A, head right on the ramp for I-265 / KY-841 South toward Gene Snyder Freeway 3.0 mi 6. Road name changes to I-265 W / KY-841 W 22.4 mi, 20 min a. At Exit 1, head right on the ramp for US-31W / US-60 toward Fort Knox / Louisville 0.3 mi 7. Turn left onto US-31W S / US-60 W / Dixie Hwy 14.9 mi 8. Turn right onto US-60 E / Highway 60 17.2 mi 9. Turn right onto KY-79 / S Woodlawn Dr 0.8 mi 10. Turn left onto KY-477 / Highway 477 1.4 mi 11. Turn right 0.1 mi 12. Arrive at destination
|
Parties
Name
|
Liter's Inc.
|
Role
|
Operator
|
Start Date
|
2005-12-19
|
|
Name
|
Kentucky Stone Company
|
Role
|
Operator
|
Start Date
|
1950-01-01
|
End Date
|
1988-11-13
|
|
Name
|
Hanson Aggregates Midwest, Inc.
|
Role
|
Operator
|
Start Date
|
1988-11-14
|
End Date
|
2005-12-18
|
|
Name
|
John G Liter
|
Role
|
Current Controller
|
Start Date
|
2005-12-19
|
|
Name
|
Liter's Inc.
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2020-07-20
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Caught in, under or between a moving and a stationary object
|
Ocupation |
Mine manager, Mine foreman, Mine owner
|
Narrative |
A large piece of metal had lodged in the cone crusher North while trying to remove the metal, the crusher turned and smashed the employee's thumb against the bowl.
|
|
Accident Date |
2016-07-29
|
Degree Inhury |
DYS AWY FRM WRK & RESTRCTD ACT
|
Accident Type |
Fall from scaffolds, walkways, platforms
|
Ocupation |
Utility man, Shift tech, Service/Dump truck operator
|
Narrative |
Employee was changing the pre-screen on a machine and slipped of a platform approximately 3 feet off the ground landing on left shoulder. Suspected rotator cuff injury.
|
|
Accident Date |
2014-11-10
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Fall from machine
|
Ocupation |
Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech
|
Narrative |
Employee was climbing onto D65 Dozer. There was mud on the tracks causing him to slip and fall injuring his shoulder.
|
|
Accident Date |
2013-09-12
|
Degree Inhury |
DAYS RESTRICTED ACTIVITY ONLY
|
Accident Type |
Caught in, under or between a moving and a stationary object
|
Ocupation |
Warehouseman, Bagger, Palletizer/Stacker, Store keeper, Packager, Fabricator, Cleaning plant operator
|
Narrative |
Employee was loosening bolts on an electric motor in order to tighten the V Belts, the ratchet & socket slipped and he mashed his thumb.
|
|
Accident Date |
2009-12-23
|
Degree Inhury |
DYS AWY FRM WRK & RESTRCTD ACT
|
Accident Type |
Fall from machine
|
Ocupation |
Haul/Off road/Coal/Ore/Pit/Quarry/Rock/Rubber tire truck driver, Transportation truck driver
|
Narrative |
While Employee was climbing up the stairs on a volvo haul truck, he lost his footing and fell to the ground.
|
|
Accident Date |
2000-05-08
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Struck by... NEC
|
Ocupation |
Truck driver
|
Narrative |
HE WAS PRYING ON BENT HANDRAIL ON TRUCK TARP PLATFORM THE PRY BAR SLIPPED OFF AND MASHED HIS FINGER BETWEEN THE BAR AND HANDRAIL AND HAD FOUR STITCHES ON LITTLE FINGER.
|
|
Inspections
Start Date |
2024-12-04
|
End Date |
2025-01-15
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
48
|
|
Start Date |
2024-08-19
|
End Date |
2024-08-21
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
23
|
|
Start Date |
2024-03-19
|
End Date |
2024-04-01
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
19.5
|
|
Start Date |
2023-10-16
|
End Date |
2023-11-17
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
29
|
|
Start Date |
2023-06-27
|
End Date |
2023-10-16
|
Activity |
Spot Inspection
|
Number Inspectors |
2
|
Total Hours |
32.5
|
|
Start Date |
2023-06-14
|
End Date |
2023-06-14
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
.5
|
|
Start Date |
2023-06-12
|
End Date |
2023-06-22
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
33
|
|
Start Date |
2022-11-22
|
End Date |
2022-11-28
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
13.5
|
|
Start Date |
2022-07-21
|
End Date |
2022-07-28
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
15.75
|
|
Start Date |
2021-12-07
|
End Date |
2021-12-07
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
11.5
|
|
Start Date |
2021-04-26
|
End Date |
2021-04-27
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
23.5
|
|
Start Date |
2020-12-29
|
End Date |
2020-12-29
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
10
|
|
Start Date |
2020-09-15
|
End Date |
2020-09-15
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
3.5
|
|
Start Date |
2020-05-11
|
End Date |
2020-06-01
|
Activity |
Fatal Accident Investigation
|
Number Inspectors |
2
|
Total Hours |
30.75
|
|
Start Date |
2020-04-16
|
End Date |
2020-04-16
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
11
|
|
Start Date |
2019-12-16
|
End Date |
2019-12-18
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
15.75
|
|
Start Date |
2019-09-25
|
End Date |
2019-09-25
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
4.5
|
|
Start Date |
2019-05-28
|
End Date |
2019-05-31
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
28
|
|
Start Date |
2018-10-03
|
End Date |
2018-10-04
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
18.5
|
|
Start Date |
2018-06-12
|
End Date |
2018-06-13
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
11.75
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2024
|
Annual Hours
|
8423
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
1404
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2024
|
Annual Hours
|
9830
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
1638
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2024
|
Annual Hours
|
2203
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2203
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2023
|
Annual Hours
|
10558
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
1760
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2023
|
Annual Hours
|
10911
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
1819
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2023
|
Annual Hours
|
2312
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2312
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2022
|
Annual Hours
|
9750
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
1393
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2022
|
Annual Hours
|
12421
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
2070
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2022
|
Annual Hours
|
3986
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1993
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2021
|
Annual Hours
|
10028
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
1671
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2021
|
Annual Hours
|
12121
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
1732
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2021
|
Annual Hours
|
3791
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1896
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2020
|
Annual Hours
|
8929
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
1786
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2020
|
Annual Hours
|
12050
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
1721
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2020
|
Annual Hours
|
2184
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2184
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2019
|
Annual Hours
|
10690
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
1782
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2019
|
Annual Hours
|
13063
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
2177
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2019
|
Annual Hours
|
2314
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2314
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2018
|
Annual Hours
|
13058
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
2176
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2018
|
Annual Hours
|
12740
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
1820
|
|
|
Upton Quarry
|
Surface
|
Active
|
Crushed, Broken Limestone NEC
|
|
Directions to Mine |
1517 Bull Lea Rd Lexington, KY 40511 Get on KY-4 W/US-421 BYP N/W New Cir Rd from Citation Blvd and Newtown Pike 4 min (1.5 mi) Head north toward Bull Lea Rd 164 ft Turn right toward Bull Lea Rd 249 ft Turn right onto Bull Lea Rd 0.2 mi Turn left onto Citation Blvd 0.3 mi Turn right at the 1st cross street onto Newtown Pike 0.7 mi Use the right lane to take the KY-4 W/New Circle Rd ramp to Airport 0.3 mi Follow KY-4 W. Take exit 5B from KY-4 W 5 min (4.5 mi) Merge onto KY-4 W/US-421 BYP N/W New Cir Rd 1.7 mi Continue onto KY-4 W/W New Cir Rd 2.6 mi Take exit 5B to merge onto US-60 W/Versailles Rd toward Versailles/Bluegrass Pkwy 0.3 mi Get on KY-9002 W/Bluegrass Pkwy in Woodford County 8 min (6.5 mi) Merge onto US-60 W/Versailles Rd Continue to follow US-60 W 5.9 mi Use the right lane to take the Blue Grass Pkwy ramp to Lawrenceburg/Elizabethtown 0.6 mi Continue on KY-9002 W/Bluegrass Pkwy to Larue County. Take exit 76 from I-65 S 1 hr 16 min (88.4 mi) Continue onto KY-9002 W/Bluegrass Pkwy 70.5 mi Use any lane to take exit 1B to merge onto I-65 S toward Nashville/Paducah/Western Kentucky Pkwy 17.6 mi Take exit 76 for KY-224 toward Upton 0.3 mi Continue on KY-224 W/Upton Talley Rd to your destination in Hardin County 5 min (1.6 mi) Turn right onto KY-224 W/Upton Talley Rd 0.5 mi Turn right onto S Walnut St 0.2 mi Turn left onto Old US 31W Rd/Quarry Rd 0.8 mi Turn right Destination will be on the left 0.2 mi 607 Quarry Rd Upton, KY 42784
|
Parties
Name
|
Kentucky Stone Company
|
Role
|
Operator
|
Start Date
|
1950-01-01
|
End Date
|
1988-11-13
|
|
Name
|
Heidelberg Materials Midwest Agg, Inc.
|
Role
|
Operator
|
Start Date
|
1988-11-14
|
|
Name
|
Heidelberg Materials AG
|
Role
|
Current Controller
|
Start Date
|
1988-11-14
|
|
Name
|
Heidelberg Materials Midwest Agg, Inc.
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2023-12-19
|
Degree Inhury |
DAYS RESTRICTED ACTIVITY ONLY
|
Accident Type |
Struck against stationary object
|
Ocupation |
Miner, Prospector, NEC
|
Narrative |
Walking on bench, foot shifted underneath EE from a loose rock, strain to right knee (Became Reportable on 2/26/24)
|
|
Accident Date |
2014-04-17
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Fall from machine
|
Ocupation |
Haul/Off road/Coal/Ore/Pit/Quarry/Rock/Rubber tire truck driver, Transportation truck driver
|
Narrative |
CAT 769C caught fire. Employee jumped from cab platform, fell 7ft resulting in fractured R foot, fractured L tibia at knee, elbow contusion.
|
|
Inspections
Start Date |
2024-05-13
|
End Date |
2024-05-15
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
30
|
|
Start Date |
2024-05-03
|
End Date |
2024-05-03
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
1
|
|
Start Date |
2024-01-30
|
End Date |
2024-02-13
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
18.5
|
|
Start Date |
2023-12-18
|
End Date |
2023-12-21
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
32
|
|
Start Date |
2023-08-29
|
End Date |
2023-09-05
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
26.5
|
|
Start Date |
2023-06-06
|
End Date |
2023-06-07
|
Activity |
Verbal Hazard Complaint Inspections
|
Number Inspectors |
1
|
Total Hours |
7.5
|
|
Start Date |
2022-11-03
|
End Date |
2022-11-15
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
21.25
|
|
Start Date |
2022-07-29
|
End Date |
2022-08-12
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
35
|
|
Start Date |
2022-03-07
|
End Date |
2022-03-15
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
15.5
|
|
Start Date |
2021-04-05
|
End Date |
2021-04-08
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
19.75
|
|
Start Date |
2020-11-30
|
End Date |
2020-12-07
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
15.25
|
|
Start Date |
2020-09-28
|
End Date |
2020-09-28
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
5
|
|
Start Date |
2020-09-14
|
End Date |
2020-09-14
|
Activity |
Electrical Technical Investigation
|
Number Inspectors |
1
|
Total Hours |
12
|
|
Start Date |
2020-08-11
|
End Date |
2020-08-13
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
19
|
|
Start Date |
2020-03-09
|
End Date |
2020-03-09
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
7
|
|
Start Date |
2020-03-03
|
End Date |
2020-03-04
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
15
|
|
Start Date |
2019-10-08
|
End Date |
2019-10-08
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
2
|
|
Start Date |
2019-05-01
|
End Date |
2019-05-02
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
14.5
|
|
Start Date |
2018-10-17
|
End Date |
2018-10-18
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
28
|
|
Start Date |
2018-09-19
|
End Date |
2018-09-20
|
Activity |
Part 50 Audit
|
Number Inspectors |
1
|
Total Hours |
7.25
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2024
|
Annual Hours
|
27209
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
14
|
Avg. Employee Hours
|
1944
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2024
|
Annual Hours
|
8042
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
2011
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2024
|
Annual Hours
|
6435
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
2145
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2023
|
Annual Hours
|
52094
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
20
|
Avg. Employee Hours
|
2605
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2023
|
Annual Hours
|
12638
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
2528
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2023
|
Annual Hours
|
9765
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
2441
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2022
|
Annual Hours
|
35363
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
18
|
Avg. Employee Hours
|
1965
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2022
|
Annual Hours
|
11602
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
2320
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2022
|
Annual Hours
|
6886
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1722
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2021
|
Annual Hours
|
5176
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1294
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2021
|
Annual Hours
|
7019
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1755
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2021
|
Annual Hours
|
4578
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
1526
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2020
|
Annual Hours
|
4642
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
1547
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2020
|
Annual Hours
|
6445
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1611
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2020
|
Annual Hours
|
4404
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1101
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2019
|
Annual Hours
|
3577
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
1192
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2019
|
Annual Hours
|
8244
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
2061
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2019
|
Annual Hours
|
2528
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1264
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2018
|
Annual Hours
|
5332
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
1777
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2018
|
Annual Hours
|
10120
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
2024
|
|
|
Yellow Rock Quarry
|
Underground
|
Abandoned
|
Crushed, Broken Limestone NEC
|
|
Directions to Mine |
New Yellow Rock Road S/W
|
Parties
Name
|
Kentucky Stone Company
|
Role
|
Operator
|
Start Date
|
1950-01-01
|
End Date
|
1988-11-13
|
|
Name
|
Hanson Aggregates Midwest Inc
|
Role
|
Operator
|
Start Date
|
1988-11-14
|
End Date
|
2003-07-22
|
|
Name
|
Hinkle Contracting Company LLC
|
Role
|
Operator
|
Start Date
|
2003-07-23
|
|
Name
|
CRH PLC
|
Role
|
Current Controller
|
Start Date
|
2003-07-23
|
|
Name
|
Hinkle Contracting Company LLC
|
Role
|
Current Operator
|
|
Inspections
Start Date |
2003-10-08
|
End Date |
2003-10-20
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
1
|
Total Hours |
11
|
|
Start Date |
2003-08-25
|
End Date |
2003-08-28
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
1
|
Total Hours |
27
|
|
Start Date |
2003-05-08
|
End Date |
2003-05-08
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
1
|
Total Hours |
11
|
|
Start Date |
2003-01-29
|
End Date |
2003-01-29
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
1
|
Total Hours |
8
|
|
Start Date |
2002-10-31
|
End Date |
2002-10-31
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
1
|
Total Hours |
7
|
|
Start Date |
2002-10-24
|
End Date |
2002-10-24
|
Activity |
SPECIAL ENFORCEMENT 4
|
Number Inspectors |
1
|
Total Hours |
1
|
|
Start Date |
2002-08-13
|
End Date |
2002-08-13
|
Activity |
MISCELLANEOUS INSPECTION/INVESTIGATION
|
Number Inspectors |
1
|
Total Hours |
4
|
|
Start Date |
2002-07-22
|
End Date |
2002-07-22
|
Activity |
COMPLIANCE FOLLOW-UP INSPECTION
|
Number Inspectors |
1
|
Total Hours |
6
|
|
Start Date |
2002-06-12
|
End Date |
2002-06-12
|
Activity |
MISCELLANEOUS INSPECTION/INVESTIGATION
|
Number Inspectors |
1
|
Total Hours |
7
|
|
Start Date |
2002-06-12
|
End Date |
2002-06-12
|
Activity |
COMPLIANCE FOLLOW-UP INSPECTION
|
Number Inspectors |
1
|
Total Hours |
3
|
|
Start Date |
2002-06-05
|
End Date |
2002-06-07
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
1
|
Total Hours |
17
|
|
Start Date |
2002-04-24
|
End Date |
2002-04-25
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
1
|
Total Hours |
8
|
|
Start Date |
2002-01-17
|
End Date |
2002-01-17
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
0
|
Total Hours |
0
|
|
Start Date |
2001-11-26
|
End Date |
2001-11-27
|
Activity |
COMPLIANCE FOLLOW-UP INSPECTION
|
Number Inspectors |
1
|
Total Hours |
6
|
|
Start Date |
2001-10-24
|
End Date |
2001-10-26
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
1
|
Total Hours |
24
|
|
Start Date |
2001-08-23
|
End Date |
2001-08-23
|
Activity |
COMPLIANCE FOLLOW-UP INSPECTION
|
Number Inspectors |
1
|
Total Hours |
8
|
|
Start Date |
2001-07-31
|
End Date |
2001-08-01
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
1
|
Total Hours |
21
|
|
Start Date |
2001-06-18
|
End Date |
2001-06-18
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
1
|
Total Hours |
16
|
|
Start Date |
2001-05-29
|
End Date |
2001-05-30
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
1
|
Total Hours |
21
|
|
Start Date |
2001-05-14
|
End Date |
2001-05-14
|
Activity |
MISCELLANEOUS INSPECTION/INVESTIGATION
|
Number Inspectors |
1
|
Total Hours |
7
|
|
Productions
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2003
|
Annual Hours
|
2662
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1331
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2003
|
Annual Hours
|
3045
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1523
|
|
Sub-Unit Desc
|
UNDERGROUND
|
Year
|
2002
|
Annual Hours
|
3525
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
705
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2002
|
Annual Hours
|
6536
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1634
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2002
|
Annual Hours
|
4152
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
2076
|
|
Sub-Unit Desc
|
UNDERGROUND
|
Year
|
2001
|
Annual Hours
|
4585
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1146
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2001
|
Annual Hours
|
8936
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
1787
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2001
|
Annual Hours
|
4673
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
2337
|
|
Sub-Unit Desc
|
UNDERGROUND
|
Year
|
2000
|
Annual Hours
|
7619
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
1524
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2000
|
Annual Hours
|
11073
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
1846
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2000
|
Annual Hours
|
3416
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
1139
|
|
|
Russellville Quarry & Mill
|
Surface
|
Active
|
Crushed, Broken Limestone NEC
|
|
Directions to Mine |
1136 Morgantown Rd Russellville, KY 42276 1. Depart and head east on Bull Lea Rd 79 ft 2. Turn left to stay on Bull Lea Rd 0.1 mi 3. Turn left onto Citation Blvd 0.3 mi 4. Turn right onto KY-922 / Newtown Pike 0.6 mi 5. Take the ramp on the right and follow signs for KY-4 East 2.8 mi 6. Keep straight to get onto KY-4 S 1.8 mi 7. At Exit 5B, head right on the ramp for US-60 West toward Versailles 6.2 mi a. Take the ramp on the right for Martha Layne Collins Blue Grass Pkwy W and head toward Elizabethtown / Lawrenceburg 1.9 mi 8. Road name changes to Martha Layne Collins Blue Grass Pkwy 68.9 mi 9. Keep straight to get onto Martha Layne Collins Blue Grass Pkwy 0.2 mi 10. Take the ramp for I-65 S 410 ft a. Keep left, heading toward Nashville / Paducah / WESTERN KENTUCKY PARKWAY 2.1 mi b. At Exit 91C-A, head right on the ramp for US-31W toward Elizabethtown / Paducah 0.4 mi 11. Keep left, heading toward Leitchfield / Paducah 42.0 mi a. At Exit 94, head right on the ramp for KY-79 / Morgantown St toward Morgantown 0.2 mi 12. Bear left onto KY-79 / Morgantown St 16.1 mi 13. Turn left onto US-231 S / KY-79 / KY-70 / Beaver Dam Rd 1.8 mi 14. Keep right to stay on KY-70 / Veterans Hwy 1.6 mi a. Take the ramp on the left for William H Natcher Pkwy S and head toward Bowling Green 0.7 mi 15. At Exit 26, head right on the ramp for KY-79 / US-231 toward Morgantown 0.3 mi 16. Turn right onto US-231 S / KY-79 / S Main St 0.7 mi 17. Turn right onto KY-79 / Russellville Rd 26.1 mi 18. Turn left 213 ft 19. Arrive at your destination on the right
|
Parties
Name
|
Kentucky Stone Company
|
Role
|
Operator
|
Start Date
|
1950-01-01
|
End Date
|
1988-11-13
|
|
Name
|
Heidelberg Materials Midwest Agg, Inc.
|
Role
|
Operator
|
Start Date
|
1988-11-14
|
|
Name
|
Heidelberg Materials AG
|
Role
|
Current Controller
|
Start Date
|
1988-11-14
|
|
Name
|
Heidelberg Materials Midwest Agg, Inc.
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2017-09-22
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Struck by... NEC
|
Ocupation |
Laborer, Blacksmith, Bull gang, Parts runner, Roustabout, Pick-up man, Pitman
|
Narrative |
The S-2 screen had stopped while crushing. The injured employee was removing the screen doors using a 16 inch spud bar. As the employee unhinged a door, the door sprung outward and struck the employee in left forearm.
|
|
Accident Date |
2016-03-14
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Over-exertion in wielding or throwing objects
|
Ocupation |
Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech
|
Narrative |
A plant Mechanic was attempting to remove a rear center pin block on a Euclid 324TD Haul Truck. EE was using hand tools such as a hammer, chisel and wrenches. As ee worked ee noticed a pain in lower back that radiated through pelvic area.
|
|
Accident Date |
2013-01-22
|
Degree Inhury |
INJURIES INVOLVNG NONEMPLOYEES
|
Accident Type |
Contact with cold
|
Ocupation |
Miner, Prospector, NEC
|
Narrative |
Second-hand info: Five minor children approx. 15 y/o were trespassing on mine property, bypassed several No Trespassing signs, a locked gate, and a barricade in front of an old underground portal. Emergency services contacted the mine site to report people stuck in the underground. Children were off property before mine personnel arrived at the old portal.
|
|
Accident Date |
2009-05-11
|
Degree Inhury |
DYS AWY FRM WRK & RESTRCTD ACT
|
Accident Type |
Fall from machine
|
Ocupation |
Warehouseman, Bagger, Palletizer/Stacker, Store keeper, Packager, Fabricator, Cleaning plant operator
|
Narrative |
Injured employee was using a come-a-long attached to a sheave on a 4 foot cone crusher. While he was pulling the come-a-long handle back and forth, the chain slipped and he lost his balance and fell back approximately 57 to the ground.
|
|
Accident Date |
2004-07-08
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Fall from machine
|
Ocupation |
Crane operator, Mobile equipment operator (MEO), Dragline operator, Dropball operator, Rigger
|
Narrative |
Miner fell approximately 4 feet to a work platform surrounding the cone crusher in the secondary plant.
|
|
Accident Date |
2001-06-28
|
Degree Inhury |
PERM TOT OR PERM PRTL DISABLTY
|
Accident Type |
Caught in, under or between NEC
|
Ocupation |
Truck driver
|
Narrative |
EE WAS USING PRY BAR TO MOVE SCREEN WHEN IT SLIPPED AND CAUGHT HIS FINGER AGAINST THE HAND RAIL.FIFTH FINGER OF RIGHT HAND WAS SEVERED AT THE LAST KNUCKLE.
|
|
Inspections
Start Date |
2024-11-27
|
End Date |
2024-12-18
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
76.5
|
|
Start Date |
2024-09-23
|
End Date |
2024-09-23
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
9.5
|
|
Start Date |
2024-08-12
|
End Date |
2024-08-27
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
20.75
|
|
Start Date |
2024-05-22
|
End Date |
2024-05-22
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
2.5
|
|
Start Date |
2024-05-21
|
End Date |
2024-06-05
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
35
|
|
Start Date |
2023-10-10
|
End Date |
2023-12-11
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
3
|
Total Hours |
79
|
|
Start Date |
2023-09-19
|
End Date |
2023-09-26
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
4.5
|
|
Start Date |
2023-06-22
|
End Date |
2023-06-28
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
32
|
|
Start Date |
2023-01-20
|
End Date |
2023-01-25
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
27.5
|
|
Start Date |
2022-06-15
|
End Date |
2022-06-28
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
44.75
|
|
Start Date |
2022-01-26
|
End Date |
2022-02-01
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
21
|
|
Start Date |
2021-08-12
|
End Date |
2021-08-13
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
12
|
|
Start Date |
2021-05-10
|
End Date |
2021-05-13
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
37
|
|
Start Date |
2021-02-22
|
End Date |
2021-02-22
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
5
|
|
Start Date |
2021-02-03
|
End Date |
2021-02-04
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
17.5
|
|
Start Date |
2020-09-29
|
End Date |
2020-09-29
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
7
|
|
Start Date |
2020-07-29
|
End Date |
2020-07-30
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
17
|
|
Start Date |
2020-03-16
|
End Date |
2020-03-19
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
19.5
|
|
Start Date |
2020-03-10
|
End Date |
2020-03-12
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
19
|
|
Start Date |
2019-10-08
|
End Date |
2019-10-08
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
2
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2024
|
Annual Hours
|
19458
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
8
|
Avg. Employee Hours
|
2432
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2024
|
Annual Hours
|
6108
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
2036
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2024
|
Annual Hours
|
4452
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
2226
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2023
|
Annual Hours
|
22400
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
12
|
Avg. Employee Hours
|
1867
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2023
|
Annual Hours
|
4050
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1013
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2023
|
Annual Hours
|
5029
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
1676
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2022
|
Annual Hours
|
11705
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
2341
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2022
|
Annual Hours
|
11336
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
2267
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2022
|
Annual Hours
|
4528
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
2264
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2021
|
Annual Hours
|
10973
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
2743
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2021
|
Annual Hours
|
15563
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
3113
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2021
|
Annual Hours
|
5445
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
2723
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2020
|
Annual Hours
|
12652
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
3163
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2020
|
Annual Hours
|
13310
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
2662
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2020
|
Annual Hours
|
4993
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
2497
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2019
|
Annual Hours
|
11686
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
2922
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2019
|
Annual Hours
|
14087
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
2817
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2019
|
Annual Hours
|
5244
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
2622
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2018
|
Annual Hours
|
13603
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
3401
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2018
|
Annual Hours
|
14247
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
2849
|
|
|
MT. VERNON MINE & MILL
|
Underground
|
Active
|
Crushed, Broken Limestone NEC
|
|
Directions to Mine |
Take US 25 E North 21 miles to Corbin. Take I-75 North 30 miles to Exit 59. Turn left on US-25 Towards Mt. Vernon. Travel 2 miles to US-150 junction. Continue straight on US-150 Appr. 3/4 mile - mine on right.
|
Parties
Name
|
Kentucky Stone Company
|
Role
|
Operator
|
Start Date
|
1950-01-01
|
End Date
|
1988-11-13
|
|
Name
|
Heidelberg Materials Midwest Agg, Inc.
|
Role
|
Operator
|
Start Date
|
1988-11-14
|
|
Name
|
Heidelberg Materials AG
|
Role
|
Current Controller
|
Start Date
|
1988-11-14
|
|
Name
|
Heidelberg Materials Midwest Agg, Inc.
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2023-04-24
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Over-exertion NEC
|
Ocupation |
Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech
|
Narrative |
An employee had an impactor liner, approximately 70 lbs, setting stationary on the impactor platform while changing worn curtain liners in the machine. The liner became imbalanced and began to fall to the catwalk. The employee moved to reposition the liner but was unsuccessful causing a sprained lumbar in EE's lower right back area.
|
|
Accident Date |
2020-09-04
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Fall onto or against objects
|
Ocupation |
Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech
|
Narrative |
A mobile equipment mechanic was investigating a failed hydraulic line on the 980G loader. The mechanic was standing on the rear offside step and slipped, causing left forearm to slide between the alternator and the fiberglass radiator guard. The contact caused a laceration to forearm.
|
|
Accident Date |
2019-05-01
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Over-exertion NEC
|
Ocupation |
Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech
|
Narrative |
Injured was replacing a bushing on a Symons 4.25 crusher. As they descended the fixed caged ladder and stepped to the ground they landed awkwardly and suffered back pain. EE sought medical treatment,was diagnosed as lumbar strain. Given pain medication and muscle relaxers and instructed to rest for 2 days. EE's total time working at this quarry was one day.
|
|
Accident Date |
2019-03-11
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Struck by... NEC
|
Ocupation |
Bull gang foreman, Labor foreman, Leadman, Section foreman, Shift boss
|
Narrative |
Employee was tightening a bolt on a wear plate on a 980G Front End Loader. The hammer employee was using to hold the bolt slipped, causing the bolt to strike right middle finger while being spun by an impact wrench. The contact caused a laceration requiring 7 sutures to close. The employee was not wearing gloves at the time of injury.
|
|
Accident Date |
2018-08-14
|
Degree Inhury |
DYS AWY FRM WRK & RESTRCTD ACT
|
Accident Type |
Over-exertion NEC
|
Ocupation |
Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech
|
Narrative |
The night shift QC Technician was working in the QC Lab at the time of incident. When ee lifted a bucket of stone for sampling, ee lost balance and twisted left knee.
|
|
Accident Date |
2016-10-13
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Struck by... NEC
|
Ocupation |
Truck driver
|
Narrative |
Employee was attempting to dislodge a section of liner that was jammed in the cone crusher. When ee struck the Manganese liner with a hammer, it fragmented; and a piece hit right index finger causing a laceration.
|
|
Accident Date |
2013-03-16
|
Degree Inhury |
INJURIES INVOLVNG NONEMPLOYEES
|
Accident Type |
Fall to lower level, NEC
|
Ocupation |
Miner, NEC
|
Narrative |
While evading police on 3/16, a man entered mine property and fell into a sink hole that entered old underground mine workings. Man was transported to hospital. Mine personnel were made aware of the event on 3/20 and notified MSHA immediately. Deteriorated fence around the hole was replaced.
|
|
Accident Date |
2013-01-16
|
Degree Inhury |
INJURIES DUE TO NATURAL CAUSES
|
Accident Type |
NEC
|
Ocupation |
Bull gang foreman, Labor foreman, Leadman, Section foreman, Shift boss
|
Narrative |
Personal health issue, not work related. Employee was receiving site specific hazard training at the mine when the employee collapsed and started having seizures. The employee was transported via ambulance to the local hospital. Employee returned to work without restrictions two days later. The employee had a history of seizures.
|
|
Accident Date |
2011-03-28
|
Degree Inhury |
DAYS RESTRICTED ACTIVITY ONLY
|
Accident Type |
Fall from ladders
|
Ocupation |
Electrician, Lineman
|
Narrative |
Employee was climbing an extension ladder to secure the top of the ladder, which was leaning against a conduit rack. The employee was standing on the 9th or 10th rung when the ladder feet slipped, causing the ladder to slide down the conduits. Employee rode the ladder down, causing a sprained left hand and sprained right foot.
|
|
Accident Date |
2010-07-25
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Flash burns (welding)
|
Ocupation |
Loader head operator, Roscoe operator
|
Narrative |
Employee was welding in the primary feeder hooper and recieved a welding flash burn on his eyes. There were two employees welding at the time.
|
|
Accident Date |
2009-05-12
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Over-exertion NEC
|
Ocupation |
Ledgeman/hand, Quarry man
|
Narrative |
Employee was climbing into crane when he felt a strain in his left shoulder.
|
|
Accident Date |
2009-04-21
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Fall to the walkway or working surface
|
Ocupation |
Electrician, Lineman
|
Narrative |
Employee was carrying a bundle of conduit and walking beside a 36 deep trenchline. Employee lost his footing and slipped into the trenchline, causing the employee to sprain his left knee. The employee has not lost any time due to the injury.
|
|
Accident Date |
2001-10-24
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Struck against stationary object
|
Ocupation |
Warehouseman, Bagger, Palletizer/Stacker, Store keeper, Packager, Fabricator, Cleaning plant operator
|
Narrative |
EE WAS REMOVING A HUGE ROCK ON #2 CONVEYOR WITH A BAR AND THE BAR SLIPPED AND HE HIT HIS LEFT HAND ON THE GUARD.
|
|
Inspections
Start Date |
2024-10-24
|
End Date |
2025-01-08
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
7
|
|
Start Date |
2024-10-15
|
End Date |
2024-11-12
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
3
|
Total Hours |
98
|
|
Start Date |
2024-08-26
|
End Date |
2024-09-16
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
43.75
|
|
Start Date |
2024-05-22
|
End Date |
2024-05-22
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
1.25
|
|
Start Date |
2024-05-20
|
End Date |
2024-05-29
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
40
|
|
Start Date |
2024-02-26
|
End Date |
2024-03-06
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
24
|
|
Start Date |
2023-10-25
|
End Date |
2023-11-06
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
48.25
|
|
Start Date |
2023-08-28
|
End Date |
2023-08-30
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
32
|
|
Start Date |
2023-05-01
|
End Date |
2023-06-05
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
71.5
|
|
Start Date |
2023-02-14
|
End Date |
2023-02-22
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
46.5
|
|
Start Date |
2022-11-07
|
End Date |
2022-11-28
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
55.5
|
|
Start Date |
2022-09-06
|
End Date |
2022-09-19
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
35
|
|
Start Date |
2022-04-04
|
End Date |
2022-04-18
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
31
|
|
Start Date |
2022-01-10
|
End Date |
2022-03-21
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
41.5
|
|
Start Date |
2021-11-15
|
End Date |
2021-11-18
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
39
|
|
Start Date |
2021-09-01
|
End Date |
2021-09-23
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
46
|
|
Start Date |
2021-04-01
|
End Date |
2021-04-15
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
44.75
|
|
Start Date |
2021-02-08
|
End Date |
2021-02-17
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
36
|
|
Start Date |
2020-10-08
|
End Date |
2020-10-15
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
36.25
|
|
Start Date |
2020-08-10
|
End Date |
2020-08-17
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
46.5
|
|
Productions
Sub-Unit Desc
|
UNDERGROUND
|
Year
|
2024
|
Annual Hours
|
13867
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
1981
|
|
Sub-Unit Desc
|
SURFACE AT UNDERGROUND
|
Year
|
2024
|
Annual Hours
|
13621
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
1946
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2024
|
Annual Hours
|
14407
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
10
|
Avg. Employee Hours
|
1441
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2024
|
Annual Hours
|
2087
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2087
|
|
Sub-Unit Desc
|
UNDERGROUND
|
Year
|
2023
|
Annual Hours
|
14684
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
2098
|
|
Sub-Unit Desc
|
SURFACE AT UNDERGROUND
|
Year
|
2023
|
Annual Hours
|
10389
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
2078
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2023
|
Annual Hours
|
18051
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
11
|
Avg. Employee Hours
|
1641
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2023
|
Annual Hours
|
2111
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2111
|
|
Sub-Unit Desc
|
UNDERGROUND
|
Year
|
2022
|
Annual Hours
|
20811
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
9
|
Avg. Employee Hours
|
2312
|
|
Sub-Unit Desc
|
SURFACE AT UNDERGROUND
|
Year
|
2022
|
Annual Hours
|
9038
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
2260
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2022
|
Annual Hours
|
17595
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
10
|
Avg. Employee Hours
|
1760
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2022
|
Annual Hours
|
2351
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1176
|
|
Sub-Unit Desc
|
UNDERGROUND
|
Year
|
2021
|
Annual Hours
|
19413
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
9
|
Avg. Employee Hours
|
2157
|
|
Sub-Unit Desc
|
SURFACE AT UNDERGROUND
|
Year
|
2021
|
Annual Hours
|
7616
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
2539
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2021
|
Annual Hours
|
16679
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
10
|
Avg. Employee Hours
|
1668
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2021
|
Annual Hours
|
2630
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1315
|
|
Sub-Unit Desc
|
UNDERGROUND
|
Year
|
2020
|
Annual Hours
|
9647
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
2412
|
|
Sub-Unit Desc
|
SURFACE AT UNDERGROUND
|
Year
|
2020
|
Annual Hours
|
6957
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
2319
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2020
|
Annual Hours
|
18853
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
11
|
Avg. Employee Hours
|
1714
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2020
|
Annual Hours
|
3349
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
670
|
|
|
Franklin Quarry & Mill
|
Surface
|
Active
|
Crushed, Broken Limestone NEC
|
|
Directions to Mine |
1517 Bull Lea Rd Lexington, KY 40511 Get on KY-4 W/US-421 BYP N/W New Cir Rd from Citation Blvd and Newtown Pike 4 min (1.5 mi) Head north toward Bull Lea Rd 164 ft Turn right toward Bull Lea Rd 249 ft Turn right onto Bull Lea Rd 0.2 mi Turn left onto Citation Blvd 0.3 mi Turn right at the 1st cross street onto Newtown Pike 0.7 mi Use the right lane to take the KY-4 W/New Circle Rd ramp to Airport 0.3 mi Follow KY-9002 W/Bluegrass Pkwy and I-65 S to Scottsville Rd in Bowling Green. Take exit 22 from I-65 S 2 hr 13 min (153 mi) Merge onto KY-4 W/US-421 BYP N/W New Cir Rd 1.7 mi Continue onto KY-4 W/W New Cir Rd 2.6 mi Take exit 5B to merge onto US-60 W/Versailles Rd toward Versailles/Bluegrass Pkwy Continue to follow US-60 W 6.2 mi Use the right lane to take the Blue Grass Pkwy ramp to Lawrenceburg/Elizabethtown 0.6 mi Continue onto KY-9002 W/Bluegrass Pkwy 70.5 mi Use any lane to take exit 1B to merge onto I-65 S toward Nashville/Paducah/Western Kentucky Pkwy 71.3 mi Take exit 22 toward Bowling Green 0.2 mi Take KY-884 S/Three Springs Rd to Old Nashville Rd in Simpson County 18 min (12.5 mi) Merge onto Scottsville Rd 0.3 mi Use the left 2 lanes to turn left onto KY-884 S/Three Springs Rd 9.6 mi Turn right onto Woodburn Allen Springs Rd 0.3 mi Turn left at the 1st cross street onto US-31W S/Nashville Rd Continue to follow US-31W S 2.2 mi Turn right onto Old Nashville Rd Destination will be on the left 0.1 mi 211 Old Nashville Rd Franklin, KY 42134
|
Parties
Name
|
Kentucky Stone Company
|
Role
|
Operator
|
Start Date
|
1950-01-01
|
End Date
|
1988-11-13
|
|
Name
|
Heidelberg Materials Midwest Agg, Inc.
|
Role
|
Operator
|
Start Date
|
1988-11-14
|
|
Name
|
Heidelberg Materials AG
|
Role
|
Current Controller
|
Start Date
|
1988-11-14
|
|
Name
|
Heidelberg Materials Midwest Agg, Inc.
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2021-06-17
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Struck by... NEC
|
Ocupation |
Warehouseman, Bagger, Palletizer/Stacker, Store keeper, Packager, Fabricator, Cleaning plant operator
|
Narrative |
Injured employee was attempting to strike a belt clamp with a hand held hammer. IE inadvertently struck right pinky finger. The injury required two sutures to close a wound on the tip of the finger.
|
|
Accident Date |
2017-10-04
|
Degree Inhury |
INJURIES INVOLVNG NONEMPLOYEES
|
Accident Type |
Fall from scaffolds, walkways, platforms
|
Ocupation |
Haul/Off road/Coal/Ore/Pit/Quarry/Rock/Rubber tire truck driver, Transportation truck driver
|
Narrative |
At approximately 8:15 am (CST) customer driver climbed over a concrete barricade to retrieve their weigh ticket. When they stepped down, they fell on their left side. Person was treated and released with no restrictions.
|
|
Accident Date |
2008-07-26
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Fall onto or against objects
|
Ocupation |
Front-end loader, Scraper-loader operator, Pan operator, Payloader, Scraper rig operator
|
Narrative |
Injured employee slipped on a rain soaked step and fell, resulting in a laceration to his left elbow which required 3 stitches.
|
|
Accident Date |
2005-07-20
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Struck against a moving object
|
Ocupation |
Front-end loader, Scraper-loader operator, Pan operator, Payloader, Scraper rig operator
|
Narrative |
EE WAS OPERATING MOBILE VIBRATOR ON THE NEW PARKING LOT BEHIND THE SHOP. THE NEXT DAY HE MADE COMMENTS OF HIS BACK BEING STIFF. ON 08/08/05, HE COMPLAINED ABOUT HIS BACK AND WENT TO HIS DR ABOUT THE BACK PAIN. DR RESTRICTED HIM FROM WORK UNTIL THE 17TH OR UNTIL THE NEXT CHECK-UP.
|
|
Accident Date |
2005-06-22
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Struck by... NEC
|
Ocupation |
Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech
|
Narrative |
Employee went to pull the 2x4 board that was attached to the banding strap, which was used for banding the water discharge pipe. The band was stapled to the 2x4 board, snatched the employee's right hand below the thumb, close to the palm.
|
|
Accident Date |
2003-10-22
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Fall onto or against objects
|
Ocupation |
Warehouseman, Bagger, Palletizer/Stacker, Store keeper, Packager, Fabricator, Cleaning plant operator
|
Narrative |
EE RECIEVED A CRACKED RIB WHEN HE WALKED UP THE STEPS STAIRS WITH HIS HANDS IN COAT POCKETS LOOSING HIS BALANCE CAUSING HIM TO FALL AGAINST HANDRAIL. CRACKED RIB.
|
|
Inspections
Start Date |
2024-12-04
|
End Date |
2025-01-22
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
59
|
|
Start Date |
2024-09-24
|
End Date |
2024-09-24
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
8
|
|
Start Date |
2024-05-22
|
End Date |
2024-05-22
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
2.75
|
|
Start Date |
2024-05-13
|
End Date |
2024-05-29
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
46.5
|
|
Start Date |
2023-10-18
|
End Date |
2023-11-01
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
41
|
|
Start Date |
2023-09-11
|
End Date |
2023-09-15
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
19.5
|
|
Start Date |
2023-03-13
|
End Date |
2023-03-20
|
Activity |
Verbal Hazard Complaint Inspections
|
Number Inspectors |
1
|
Total Hours |
18.5
|
|
Start Date |
2023-02-27
|
End Date |
2023-03-03
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
53
|
|
Start Date |
2022-08-10
|
End Date |
2022-08-12
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
30
|
|
Start Date |
2022-06-08
|
End Date |
2022-06-08
|
Activity |
103 (g) Written Notification Hazard Complaint Inspectio
|
Number Inspectors |
1
|
Total Hours |
9
|
|
Start Date |
2022-01-24
|
End Date |
2022-02-01
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
22
|
|
Start Date |
2021-04-27
|
End Date |
2021-04-30
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
35.25
|
|
Start Date |
2020-12-07
|
End Date |
2020-12-14
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
14.25
|
|
Start Date |
2020-09-29
|
End Date |
2020-09-29
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
3
|
|
Start Date |
2020-07-27
|
End Date |
2020-07-28
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
13
|
|
Start Date |
2020-03-11
|
End Date |
2020-03-12
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
10
|
|
Start Date |
2019-10-02
|
End Date |
2019-10-02
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
3
|
|
Start Date |
2019-05-06
|
End Date |
2019-05-07
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
12
|
|
Start Date |
2019-01-14
|
End Date |
2019-01-17
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
14.5
|
|
Start Date |
2018-07-11
|
End Date |
2018-07-12
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
14.25
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2024
|
Annual Hours
|
18618
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
2660
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2024
|
Annual Hours
|
18687
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
2670
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2024
|
Annual Hours
|
6801
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
2267
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2023
|
Annual Hours
|
19629
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
8
|
Avg. Employee Hours
|
2454
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2023
|
Annual Hours
|
21423
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
8
|
Avg. Employee Hours
|
2678
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2023
|
Annual Hours
|
7383
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
2461
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2022
|
Annual Hours
|
20542
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
9
|
Avg. Employee Hours
|
2282
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2022
|
Annual Hours
|
25009
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
10
|
Avg. Employee Hours
|
2501
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2022
|
Annual Hours
|
7187
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
2396
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2021
|
Annual Hours
|
14087
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
8
|
Avg. Employee Hours
|
1761
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2021
|
Annual Hours
|
15388
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
2198
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2021
|
Annual Hours
|
6078
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1520
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2020
|
Annual Hours
|
10534
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
2107
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2020
|
Annual Hours
|
8852
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
1770
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2020
|
Annual Hours
|
5546
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
1849
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2019
|
Annual Hours
|
12671
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
2112
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2019
|
Annual Hours
|
7816
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1954
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2019
|
Annual Hours
|
5383
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
1794
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2018
|
Annual Hours
|
13570
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
2714
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2018
|
Annual Hours
|
8525
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
2131
|
|
|
Elkton Quarry
|
Surface
|
Active
|
Crushed, Broken Limestone NEC
|
|
Directions to Mine |
Right from office on to N Main St, Turn right on I69 S, Follow I69 S 9.9 miles, Take exit 106 B-A for Pennyrile Pkwy & Continue on Pennyrile Pkwy 24.5 miles to Exit 9-KY 80-E/US 68E/McLean Ave in Hopkinsville, Turn left on KY 80 E/US 68 E and follow for 13.3 miles, turn left on Arthur Henderson Rd. for 0.01 miles and then turn right on W Jefferson Hwy ****If you reach KY 475/Trenton Tress Shop Rd, you've gone too far****
|
Parties
Name
|
Kentucky Stone Company
|
Role
|
Operator
|
Start Date
|
1950-01-01
|
End Date
|
1988-11-13
|
|
Name
|
Heidelberg Materials Midwest Agg, Inc.
|
Role
|
Operator
|
Start Date
|
1988-11-14
|
|
Name
|
Heidelberg Materials AG
|
Role
|
Current Controller
|
Start Date
|
1988-11-14
|
|
Name
|
Heidelberg Materials Midwest Agg, Inc.
|
Role
|
Current Operator
|
|
Inspections
Start Date |
2024-10-23
|
End Date |
2024-10-28
|
Activity |
Verbal Hazard Complaint Inspections
|
Number Inspectors |
1
|
Total Hours |
15
|
|
Start Date |
2024-09-03
|
End Date |
2024-09-05
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
23
|
|
Start Date |
2024-08-19
|
End Date |
2024-08-22
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
16
|
|
Start Date |
2024-02-14
|
End Date |
2024-02-20
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
32
|
|
Start Date |
2023-08-14
|
End Date |
2023-08-15
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
9
|
|
Start Date |
2002-04-01
|
End Date |
2002-04-02
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
1
|
Total Hours |
15
|
|
Start Date |
2001-07-19
|
End Date |
2001-07-19
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
1
|
Total Hours |
12
|
|
Start Date |
2001-02-06
|
End Date |
2001-02-08
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
1
|
Total Hours |
34
|
|
Start Date |
2000-04-18
|
End Date |
2000-04-21
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
1
|
Total Hours |
32
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2024
|
Annual Hours
|
11937
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
9
|
Avg. Employee Hours
|
1326
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2024
|
Annual Hours
|
4061
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
1354
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2023
|
Annual Hours
|
3725
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
621
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2023
|
Annual Hours
|
2842
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
947
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2002
|
Annual Hours
|
1801
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
450
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2002
|
Annual Hours
|
1313
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
438
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2001
|
Annual Hours
|
5898
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
1966
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2001
|
Annual Hours
|
19488
|
Avg. Annual Empl.
|
9
|
Avg. Employee Hours
|
2165
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2001
|
Annual Hours
|
4796
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
1599
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2000
|
Annual Hours
|
3484
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1742
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2000
|
Annual Hours
|
18407
|
Avg. Annual Empl.
|
8
|
Avg. Employee Hours
|
2301
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2000
|
Annual Hours
|
5285
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
1762
|
|
|
Princeton No 2 Mine
|
Surface
|
Abandoned
|
Crushed, Broken Limestone NEC
|
|
Parties
Name
|
Kentucky Stone Company
|
Role
|
Operator
|
Start Date
|
1950-01-01
|
End Date
|
1988-11-13
|
|
Name
|
Kentucky Stone Company
|
Role
|
Operator
|
Start Date
|
1988-11-14
|
|
Name
|
Hanson PLC
|
Role
|
Current Controller
|
Start Date
|
1988-11-14
|
|
Name
|
Kentucky Stone Company
|
Role
|
Current Operator
|
|
|
Pulaski Quarry
|
Surface
|
Abandoned
|
Crushed, Broken Limestone NEC
|
|
Directions to Mine |
1 mile South of Kentucky Hwy. 80 on Kentucky Hwy. 1003, east of Somerset, KY.
|
Parties
Name
|
Kentucky Stone Company
|
Role
|
Operator
|
Start Date
|
1950-01-01
|
End Date
|
1988-11-13
|
|
Name
|
Hanson Aggregates Midwest Inc
|
Role
|
Operator
|
Start Date
|
1988-11-14
|
|
Name
|
Heidelberg Materials AG
|
Role
|
Current Controller
|
Start Date
|
1988-11-14
|
|
Name
|
Hanson Aggregates Midwest Inc
|
Role
|
Current Operator
|
|
Inspections
Start Date |
2004-02-23
|
End Date |
2004-02-23
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
1
|
Total Hours |
9
|
|
Start Date |
2003-03-20
|
End Date |
2003-03-20
|
Activity |
SPECIAL ENFORCEMENT 3
|
Number Inspectors |
2
|
Total Hours |
4
|
|
Start Date |
2003-03-19
|
End Date |
2003-03-20
|
Activity |
SPECIAL ENFORCEMENT 3
|
Number Inspectors |
2
|
Total Hours |
28
|
|
Start Date |
2003-03-19
|
End Date |
2003-03-19
|
Activity |
PART 50 AUDIT
|
Number Inspectors |
2
|
Total Hours |
6
|
|
Start Date |
2002-10-21
|
End Date |
2002-10-21
|
Activity |
SPECIAL ENFORCEMENT 4
|
Number Inspectors |
1
|
Total Hours |
2
|
|
Start Date |
2002-05-01
|
End Date |
2002-05-01
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
1
|
Total Hours |
7
|
|
Start Date |
2001-11-28
|
End Date |
2001-11-29
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
1
|
Total Hours |
11
|
|
Start Date |
2001-07-19
|
End Date |
2001-07-20
|
Activity |
COMPLIANCE FOLLOW-UP INSPECTION
|
Number Inspectors |
1
|
Total Hours |
4
|
|
Start Date |
2001-07-16
|
End Date |
2001-07-18
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
2
|
Total Hours |
17
|
|
Start Date |
2001-04-09
|
End Date |
2001-04-09
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
1
|
Total Hours |
3
|
|
Start Date |
2000-11-14
|
End Date |
2000-11-15
|
Activity |
HAZARD COMPLAINT INSPECTION
|
Number Inspectors |
1
|
Total Hours |
11
|
|
Start Date |
2000-08-09
|
End Date |
2000-08-11
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
1
|
Total Hours |
8
|
|
Start Date |
2000-02-23
|
End Date |
2000-02-25
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
1
|
Total Hours |
20
|
|
Productions
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2004
|
Annual Hours
|
120
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
120
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2004
|
Annual Hours
|
120
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
120
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2003
|
Annual Hours
|
96
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
96
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2003
|
Annual Hours
|
2246
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1123
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2003
|
Annual Hours
|
3987
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
1329
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2002
|
Annual Hours
|
5602
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
1867
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2002
|
Annual Hours
|
11204
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
1601
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2002
|
Annual Hours
|
7623
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1906
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2001
|
Annual Hours
|
5549
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1387
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2001
|
Annual Hours
|
15044
|
Avg. Annual Empl.
|
8
|
Avg. Employee Hours
|
1881
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2001
|
Annual Hours
|
7431
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1858
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2000
|
Annual Hours
|
7704
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1926
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2000
|
Annual Hours
|
21484
|
Avg. Annual Empl.
|
11
|
Avg. Employee Hours
|
1953
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2000
|
Annual Hours
|
7872
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1968
|
|
|
Harrodsburg Mine
|
Surface
|
Abandoned
|
Crushed, Broken Limestone NEC
|
|
Parties
Name
|
Kentucky Stone Company
|
Role
|
Operator
|
Start Date
|
1981-06-01
|
End Date
|
1988-11-13
|
|
Name
|
Kentucky Stone Company
|
Role
|
Operator
|
Start Date
|
1988-11-14
|
|
Name
|
Hanson PLC
|
Role
|
Current Controller
|
Start Date
|
1988-11-14
|
|
Name
|
Kentucky Stone Company
|
Role
|
Current Operator
|
|
|
ROCKFIELD QUARRY
|
Surface
|
Abandoned
|
Crushed, Broken Limestone NEC
|
|
Parties
Name
|
Kentucky Stone Company
|
Role
|
Operator
|
Start Date
|
1992-05-01
|
|
Name
|
Hanson PLC
|
Role
|
Current Controller
|
Start Date
|
1992-05-01
|
|
Name
|
Kentucky Stone Company
|
Role
|
Current Operator
|
|
|