Butler County Quarry
|
Surface
|
Abandoned
|
Crushed, Broken Limestone NEC
|
|
Directions to Mine |
From office take Natcher Parkway South to Exit 26, turn right on US 231 South for a distance of 5.7 miles. Then turn left on KY Highway 1435, go 8/10 of a mile to West Basham Road on Right. Mine is at end of Basham Road.
|
Parties
Name
|
Green River Materials, Inc.
|
Role
|
Operator
|
Start Date
|
2014-12-02
|
End Date
|
2018-04-25
|
|
Name
|
Butler County Materials LLC
|
Role
|
Operator
|
Start Date
|
2005-01-17
|
End Date
|
2014-12-01
|
|
Name
|
Road Builders, LLC
|
Role
|
Operator
|
Start Date
|
2018-04-26
|
End Date
|
2019-11-26
|
|
Name
|
RB Aggregates LLC
|
Role
|
Operator
|
Start Date
|
2019-11-27
|
End Date
|
2021-11-02
|
|
Name
|
Scotty's Contracting & Stone, LLC
|
Role
|
Operator
|
Start Date
|
2021-11-03
|
|
Name
|
Yukon Valley Minerals Inc.
|
Role
|
Operator
|
Start Date
|
1999-03-01
|
End Date
|
2005-01-16
|
|
Name
|
Houchens Industries, Inc
|
Role
|
Current Controller
|
Start Date
|
2021-11-03
|
|
Name
|
Scotty's Contracting & Stone, LLC
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2007-08-20
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Struck against stationary object
|
Ocupation |
Bulldozer operator, Universal operator, Heavy equipment operator, Operating engineer
|
Narrative |
Employee was climbing out of loader and struck his elbow on one of the landing treads. Employee did not leave work and did not seek treatment for elbow until 5 days later.
|
|
Inspections
Start Date |
2023-07-23
|
End Date |
2023-07-25
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
12
|
|
Start Date |
2023-01-29
|
End Date |
2023-02-02
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
8.5
|
|
Start Date |
2022-07-12
|
End Date |
2022-07-12
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
12
|
|
Start Date |
2021-10-01
|
End Date |
2022-03-28
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
3
|
Total Hours |
11.5
|
|
Start Date |
2021-04-01
|
End Date |
2021-09-08
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
24
|
|
Start Date |
2020-10-13
|
End Date |
2021-01-06
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
10
|
|
Start Date |
2020-04-01
|
End Date |
2020-09-02
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
23
|
|
Start Date |
2019-10-01
|
End Date |
2020-03-10
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
13.5
|
|
Start Date |
2019-08-08
|
End Date |
2019-09-16
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
12
|
|
Start Date |
2018-11-05
|
End Date |
2019-01-14
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
18
|
|
Start Date |
2018-09-17
|
End Date |
2018-09-20
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
16.5
|
|
Start Date |
2017-10-30
|
End Date |
2017-11-01
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
10
|
|
Start Date |
2017-06-19
|
End Date |
2017-06-22
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
15
|
|
Start Date |
2017-02-27
|
End Date |
2017-02-28
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
17
|
|
Start Date |
2016-07-21
|
End Date |
2016-07-21
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
11.25
|
|
Start Date |
2016-07-21
|
End Date |
2016-07-21
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
.5
|
|
Start Date |
2016-01-12
|
End Date |
2016-01-12
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
4.75
|
|
Start Date |
2016-01-04
|
End Date |
2016-01-05
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
11.75
|
|
Start Date |
2016-01-04
|
End Date |
2016-01-05
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
.5
|
|
Start Date |
2015-09-17
|
End Date |
2015-09-17
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
1
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2020
|
Annual Hours
|
2093
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2093
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2020
|
Annual Hours
|
1986
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1986
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2019
|
Annual Hours
|
3465
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1733
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2019
|
Annual Hours
|
1942
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1942
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2018
|
Annual Hours
|
14578
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
9
|
Avg. Employee Hours
|
1620
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2018
|
Annual Hours
|
2151
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2151
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2017
|
Annual Hours
|
20055
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
10
|
Avg. Employee Hours
|
2006
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2017
|
Annual Hours
|
2568
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1284
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2016
|
Annual Hours
|
11522
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
1646
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2016
|
Annual Hours
|
1803
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
902
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2015
|
Annual Hours
|
10900
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
1557
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2015
|
Annual Hours
|
1548
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
774
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2008
|
Annual Hours
|
827
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
827
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2008
|
Annual Hours
|
41
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
41
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2007
|
Annual Hours
|
1871
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1871
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2007
|
Annual Hours
|
742
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
742
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2006
|
Annual Hours
|
2926
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2926
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2006
|
Annual Hours
|
1400
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1400
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2005
|
Annual Hours
|
3833
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1917
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2005
|
Annual Hours
|
1934
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1934
|
|
|
Hatcher Quarry
|
Surface
|
Abandoned
|
Crushed, Broken Limestone NEC
|
|
Directions to Mine |
Driving directions to 7787 Bowling Green Rd, Morgantown, KY 42261 3D2D - more info � 152 W Zandale DrLexington, KY 40503 1. Head south on Nicholasville Rd toward Burt Rd 0.8 mi 2. Turn right to merge onto KY-4 W/New Circle Rd 4.7 mi 3. Take exit 5B to merge onto US-60 W/Versailles Rd toward Versailles/Bluegrass Pkwy Continue to follow US-60 W 6.3 mi 4. Take the Blue Grass Pkwy ramp to Lawrenceburg/Elizabethtown 0.7 mi 5. Merge onto Martha Layne Collins Blue Grass Pkwy 70.5 mi 6. Take exit 1B on the left to merge onto I-65 S toward Nashville/Paducah/Western Kentucky Pkwy 2.1 mi 7. Take exit 91 for US-31W N/KY-61 N toward Paducah/Elizabethtown 0.5 mi 8. Follow signs for Owensboro/Paducah/Western Kentucky Pkwy and merge onto KY-9001 W/Hwy 9001 W/Rte 9001 W/State 9001 W/State Hwy 9001 W/State Route 9001 W/Wendell H. Ford Western Kentucky Pkwy 59.7 mi 9. Take exit 77B for William H Natcher Pkwy S toward Bowling Green 0.3 mi 10. Merge onto William H. Natcher Green River Pkwy 14.6 mi 11. Take exit 26 for US-231/KY-79 toward Morgantown 0.3 mi 12. Turn right onto KY-79 S/US-231 S/Bowling Green Rd Continue to follow US-231 S/Bowling Green Rd Destination will be on the right 5.8 mi 7787 Bowling Green RdMorgantown, KY 42261
|
Parties
Name
|
Green River Materials Inc
|
Role
|
Operator
|
Start Date
|
2004-08-09
|
|
Name
|
Adam Q Gabbard
|
Role
|
Current Controller
|
Start Date
|
2004-08-09
|
|
Name
|
Green River Materials Inc
|
Role
|
Current Operator
|
|
Inspections
Start Date |
2016-01-05
|
End Date |
2016-01-05
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
2.25
|
|
Start Date |
2015-09-24
|
End Date |
2015-09-25
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
7.5
|
|
Start Date |
2015-04-30
|
End Date |
2015-04-30
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
.25
|
|
Start Date |
2015-04-30
|
End Date |
2015-04-30
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
4.5
|
|
Start Date |
2015-03-17
|
End Date |
2015-03-17
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
5.25
|
|
Start Date |
2014-12-04
|
End Date |
2014-12-16
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
18.5
|
|
Start Date |
2014-09-04
|
End Date |
2014-09-05
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
16
|
|
Start Date |
2014-03-07
|
End Date |
2014-03-07
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
12.75
|
|
Start Date |
2013-05-23
|
End Date |
2013-05-30
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
37
|
|
Start Date |
2012-10-31
|
End Date |
2012-11-01
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
19.25
|
|
Start Date |
2012-08-08
|
End Date |
2012-08-08
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
3.25
|
|
Start Date |
2012-08-02
|
End Date |
2012-08-02
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
11.75
|
|
Start Date |
2011-12-01
|
End Date |
2011-12-01
|
Activity |
Part 50 Audit
|
Number Inspectors |
1
|
Total Hours |
1.5
|
|
Start Date |
2011-12-01
|
End Date |
2011-12-01
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
12.5
|
|
Start Date |
2011-09-06
|
End Date |
2011-09-08
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
15.5
|
|
Start Date |
2010-11-17
|
End Date |
2010-11-17
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
8
|
|
Start Date |
2010-07-29
|
End Date |
2010-07-29
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
10.5
|
|
Start Date |
2010-07-12
|
End Date |
2010-07-12
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
5.75
|
|
Start Date |
2010-06-28
|
End Date |
2010-06-29
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
9
|
|
Start Date |
2010-06-24
|
End Date |
2010-06-24
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
11.75
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2015
|
Annual Hours
|
2550
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
364
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2015
|
Annual Hours
|
492
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
246
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2014
|
Annual Hours
|
14215
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
8
|
Avg. Employee Hours
|
1777
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2014
|
Annual Hours
|
1871
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1871
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2013
|
Annual Hours
|
14362
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
2052
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2013
|
Annual Hours
|
2060
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2060
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2012
|
Annual Hours
|
12679
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
8
|
Avg. Employee Hours
|
1585
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2012
|
Annual Hours
|
1940
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1940
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2011
|
Annual Hours
|
11070
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
1581
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2011
|
Annual Hours
|
2017
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2017
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2010
|
Annual Hours
|
9877
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
1411
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2010
|
Annual Hours
|
1995
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1995
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2009
|
Annual Hours
|
7119
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
1424
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2009
|
Annual Hours
|
1962
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1962
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2008
|
Annual Hours
|
7231
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1808
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2008
|
Annual Hours
|
1981
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1981
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2007
|
Annual Hours
|
7511
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
1252
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2007
|
Annual Hours
|
1664
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1664
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2006
|
Annual Hours
|
5836
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
1945
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2006
|
Annual Hours
|
1896
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1896
|
|
|
Clay Pit # 1
|
Surface
|
Abandoned
|
Common Clays NEC
|
|
Directions to Mine |
2.3 miles west of Natcher Parkway Exit 27 on Hwy 231
|
Parties
Name
|
Green River Materials Inc.
|
Role
|
Operator
|
Start Date
|
2004-08-23
|
|
Name
|
Adam Q Gabbard
|
Role
|
Current Controller
|
Start Date
|
2004-08-23
|
|
Name
|
Green River Materials Inc.
|
Role
|
Current Operator
|
|
Inspections
Start Date |
2005-05-11
|
End Date |
2005-05-11
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
4
|
|
Productions
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2005
|
Annual Hours
|
1
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1
|
|
|
Belltown Quarry
|
Surface
|
Abandoned
|
Crushed, Broken Limestone NEC
|
|
Directions to Mine |
North on US 231 past Hartford Ky. Turn left on to County Rd.2688 also known as Heflen-Maxwell Rd. go West 2/10 of a mile.
|
Parties
Name
|
Green River Materials Inc
|
Role
|
Operator
|
Start Date
|
2005-05-03
|
|
Name
|
Adam Q Gabbard
|
Role
|
Current Controller
|
Start Date
|
2005-05-03
|
|
Name
|
Green River Materials Inc
|
Role
|
Current Operator
|
|
|