No 1 Mine and Mill
|
Surface
|
Abandoned
|
Common Clays NEC
|
|
Directions to Mine |
One mile south of Woodbine, KY
|
Parties
Name
|
General Shale Products Corp
|
Role
|
Operator
|
Start Date
|
1988-03-03
|
End Date
|
2001-08-12
|
|
Name
|
Corbin Brick Company Inc
|
Role
|
Operator
|
Start Date
|
1950-01-01
|
End Date
|
1988-03-02
|
|
Name
|
General Shale Products LLC
|
Role
|
Operator
|
Start Date
|
2001-08-13
|
End Date
|
2004-06-30
|
|
Name
|
General Shale Brick, Inc.
|
Role
|
Operator
|
Start Date
|
2004-07-01
|
|
Name
|
Wienerberger AG
|
Role
|
Current Controller
|
Start Date
|
2004-07-01
|
|
Name
|
General Shale Brick, Inc.
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2004-10-04
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Caught in, under or between NEC
|
Ocupation |
Bulldozer operator, Universal operator, Heavy equipment operator, Operating engineer
|
Narrative |
Employee was fueling D-7 Dozer, when he slipped and caught is finger in the basket, causing a fracture.
|
|
Inspections
Start Date |
2008-03-12
|
End Date |
2008-03-14
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
9
|
|
Start Date |
2007-09-04
|
End Date |
2007-09-05
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
6.5
|
|
Start Date |
2006-08-22
|
End Date |
2006-08-22
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
10
|
|
Start Date |
2006-03-23
|
End Date |
2006-03-23
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
10.5
|
|
Start Date |
2005-10-04
|
End Date |
2005-10-04
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
9
|
|
Start Date |
2005-09-26
|
End Date |
2005-09-29
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
31
|
|
Start Date |
2004-10-27
|
End Date |
2004-10-29
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
1
|
Total Hours |
23
|
|
Start Date |
2004-09-22
|
End Date |
2004-09-22
|
Activity |
MISCELLANEOUS INSPECTION/INVESTIGATION
|
Number Inspectors |
1
|
Total Hours |
8
|
|
Start Date |
2004-08-04
|
End Date |
2004-08-05
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
1
|
Total Hours |
28
|
|
Start Date |
2004-01-05
|
End Date |
2004-01-06
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
1
|
Total Hours |
12
|
|
Start Date |
2003-05-16
|
End Date |
2003-05-16
|
Activity |
COMPLIANCE FOLLOW-UP INSPECTION
|
Number Inspectors |
1
|
Total Hours |
3
|
|
Start Date |
2003-05-01
|
End Date |
2003-05-02
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
2
|
Total Hours |
36
|
|
Start Date |
2003-01-27
|
End Date |
2003-01-27
|
Activity |
COMPLIANCE FOLLOW-UP INSPECTION
|
Number Inspectors |
1
|
Total Hours |
5
|
|
Start Date |
2003-01-13
|
End Date |
2003-01-14
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
2
|
Total Hours |
20
|
|
Start Date |
2002-09-12
|
End Date |
2002-09-12
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
1
|
Total Hours |
14
|
|
Start Date |
2002-01-11
|
End Date |
2002-01-11
|
Activity |
PART 50 AUDIT
|
Number Inspectors |
1
|
Total Hours |
2
|
|
Start Date |
2002-01-10
|
End Date |
2002-01-11
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
1
|
Total Hours |
12
|
|
Start Date |
2001-07-31
|
End Date |
2001-08-02
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
1
|
Total Hours |
17
|
|
Start Date |
2001-01-29
|
End Date |
2001-01-29
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
1
|
Total Hours |
6
|
|
Start Date |
2000-08-28
|
End Date |
2000-08-28
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
1
|
Total Hours |
16
|
|
Productions
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2008
|
Annual Hours
|
80
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
40
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2007
|
Annual Hours
|
5759
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
1152
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2007
|
Annual Hours
|
320
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
160
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2006
|
Annual Hours
|
10545
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
2109
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2006
|
Annual Hours
|
320
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
160
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2005
|
Annual Hours
|
9667
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
1933
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2005
|
Annual Hours
|
320
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
160
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2004
|
Annual Hours
|
10109
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
2022
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2004
|
Annual Hours
|
320
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
160
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2003
|
Annual Hours
|
9983
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
1997
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2003
|
Annual Hours
|
2
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2003
|
Annual Hours
|
320
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
160
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2002
|
Annual Hours
|
10087
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
2017
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2002
|
Annual Hours
|
320
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
160
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2001
|
Annual Hours
|
9314
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
1863
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2001
|
Annual Hours
|
320
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
160
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2000
|
Annual Hours
|
9215
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
1843
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2000
|
Annual Hours
|
320
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
160
|
|
|
Coral Ridge
|
Surface
|
Abandoned
|
Common Clays NEC
|
|
Secondary Sic |
Clay, Ceramic, Refractory Mnls.
|
Directions to Mine |
Driving directions to 212 S Park Rd, Fairdale, KY 40118 3D2D - more info � 152 W Zandale DrLexington, KY 40503 1. Head south on Nicholasville Rd toward Burt Rd 0.8 mi 2. Turn right to merge onto KY-4 W/New Circle Rd 5.0 mi 3. Continue onto US-60 Bypass W 2.1 mi 4. Take exit 7 for US-421 toward Frankfort/Lexington 0.2 mi 5. Turn left onto US-421 N/Leestown Rd 10.1 mi 6. Turn right onto Georgetown Rd 0.2 mi 7. Turn left to merge onto I-64 W 46.3 mi 8. Take exit 19A to merge onto I-265 S/KY-841 S/Gene Snyder Fwy 15.2 mi 9. Continue onto KY-841 W 2.7 mi 10. Take exit 8 for KY-1020 toward Fairdale 0.3 mi 11. Turn left onto National Turnpike 2.5 mi 12. Turn right onto S Park Rd Destination will be on the left 0.4 mi 212 S Park RdFairdale, KY 40118
|
Parties
Name
|
General Shale Products Corp
|
Role
|
Operator
|
Start Date
|
1950-01-01
|
End Date
|
1986-06-29
|
|
Name
|
General Shale Products Corp
|
Role
|
Operator
|
Start Date
|
1986-06-30
|
End Date
|
2001-08-12
|
|
Name
|
General Shale Products LLC
|
Role
|
Operator
|
Start Date
|
2001-08-13
|
End Date
|
2004-06-30
|
|
Name
|
General Shale Brick, Inc.
|
Role
|
Operator
|
Start Date
|
2004-07-01
|
|
Name
|
Wienerberger AG
|
Role
|
Current Controller
|
Start Date
|
2004-07-01
|
|
Name
|
General Shale Brick, Inc.
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2001-09-03
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Fall from machine
|
Ocupation |
Bulldozer operator, Universal operator, Heavy equipment operator, Operating engineer
|
Narrative |
EE WAS CLIMBING DOWN FROM THE REAR OF THE 627 PAN, LOST HIS FOOTHING MISSED STEP SLIPPED AND FELL BACKWARD LOWER BACK INJURY.
|
|
Inspections
Start Date |
2011-05-19
|
End Date |
2011-05-19
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
3
|
|
Start Date |
2010-06-22
|
End Date |
2010-06-22
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
6.75
|
|
Start Date |
2009-07-27
|
End Date |
2009-07-30
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
16
|
|
Start Date |
2009-03-23
|
End Date |
2009-03-23
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
9
|
|
Start Date |
2008-07-14
|
End Date |
2008-07-14
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
3.5
|
|
Start Date |
2008-06-25
|
End Date |
2008-06-25
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
12.5
|
|
Start Date |
2008-01-04
|
End Date |
2008-01-04
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
6.75
|
|
Start Date |
2007-06-08
|
End Date |
2007-06-08
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
3.5
|
|
Start Date |
2007-04-26
|
End Date |
2007-04-30
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
22.5
|
|
Start Date |
2006-04-17
|
End Date |
2006-04-17
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
8
|
|
Start Date |
2005-06-20
|
End Date |
2005-06-20
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
4
|
|
Start Date |
2005-06-08
|
End Date |
2005-06-09
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
18.5
|
|
Start Date |
2004-02-24
|
End Date |
2004-02-25
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
1
|
Total Hours |
17
|
|
Start Date |
2003-10-22
|
End Date |
2003-10-22
|
Activity |
COMPLIANCE FOLLOW-UP INSPECTION
|
Number Inspectors |
1
|
Total Hours |
5
|
|
Start Date |
2003-10-07
|
End Date |
2003-10-07
|
Activity |
COMPLIANCE FOLLOW-UP INSPECTION
|
Number Inspectors |
1
|
Total Hours |
11
|
|
Start Date |
2003-09-30
|
End Date |
2003-10-01
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
1
|
Total Hours |
29
|
|
Start Date |
2001-10-23
|
End Date |
2001-10-23
|
Activity |
PART 50 AUDIT
|
Number Inspectors |
1
|
Total Hours |
2
|
|
Start Date |
2001-10-22
|
End Date |
2001-10-23
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
1
|
Total Hours |
15
|
|
Start Date |
2001-04-10
|
End Date |
2001-04-12
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
1
|
Total Hours |
16
|
|
Start Date |
2000-02-22
|
End Date |
2000-03-03
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
1
|
Total Hours |
28
|
|
Productions
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2011
|
Annual Hours
|
90
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
90
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2010
|
Annual Hours
|
120
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
120
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2009
|
Annual Hours
|
120
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
120
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2008
|
Annual Hours
|
8339
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
2085
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2008
|
Annual Hours
|
120
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
120
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2007
|
Annual Hours
|
7885
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1971
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2007
|
Annual Hours
|
120
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
120
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2006
|
Annual Hours
|
10521
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
2104
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2006
|
Annual Hours
|
120
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
120
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2005
|
Annual Hours
|
10761
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
2152
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2005
|
Annual Hours
|
120
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
120
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2004
|
Annual Hours
|
8901
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
2225
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2004
|
Annual Hours
|
120
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
120
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2003
|
Annual Hours
|
8397
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
2099
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2003
|
Annual Hours
|
120
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
120
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2002
|
Annual Hours
|
8003
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
2001
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2002
|
Annual Hours
|
120
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
120
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2001
|
Annual Hours
|
10548
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
2110
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2001
|
Annual Hours
|
1830
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1830
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2000
|
Annual Hours
|
10363
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
2073
|
|
|
Drake #1
|
Surface
|
Intermittent
|
Common Shale
|
|
Directions to Mine |
Prestonsburg to KY114 West (20 miles) to KY9009 West. Take exit 22 for KY213 toward Stanton. Destination is on the right (2 +miles). 2014 Morris Creek Road, Stanton, KY 40380.
|
Parties
Name
|
Forterra Brick, LLC
|
Role
|
Operator
|
Start Date
|
2003-02-11
|
End Date
|
2017-03-31
|
|
Name
|
Meridian Brick LLC
|
Role
|
Operator
|
Start Date
|
2017-04-01
|
End Date
|
2022-12-19
|
|
Name
|
Sipple Brick Inc
|
Role
|
Operator
|
Start Date
|
1950-01-01
|
End Date
|
2003-02-10
|
|
Name
|
General Shale Brick, Inc.
|
Role
|
Operator
|
Start Date
|
2022-12-20
|
|
Name
|
Wienerberger AG
|
Role
|
Current Controller
|
Start Date
|
2022-12-20
|
|
Name
|
General Shale Brick, Inc.
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2005-09-06
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Fall from machine
|
Ocupation |
Haul/Off road/Coal/Ore/Pit/Quarry/Rock/Rubber tire truck driver, Transportation truck driver
|
Narrative |
Mack dump truck was being used to haul raw material to the grinding room stockpile. EE was exiting the truck when his foot slipped and he fell to the ground (fractured rib).
|
|
Inspections
Start Date |
2025-02-06
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
0
|
Total Hours |
0
|
|
Start Date |
2024-08-19
|
End Date |
2024-08-19
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
5.5
|
|
Start Date |
2023-03-06
|
End Date |
2023-03-06
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
9.25
|
|
Start Date |
2021-10-12
|
End Date |
2022-03-17
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
23.25
|
|
Start Date |
2021-09-16
|
End Date |
2021-09-23
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
2.5
|
|
Start Date |
2020-07-24
|
End Date |
2020-07-28
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
11
|
|
Start Date |
2020-03-02
|
End Date |
2020-03-03
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
6.25
|
|
Start Date |
2019-01-03
|
End Date |
2019-01-03
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
5.25
|
|
Start Date |
2018-09-10
|
End Date |
2018-09-10
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
5.5
|
|
Start Date |
2017-02-13
|
End Date |
2017-02-13
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
7.5
|
|
Start Date |
2016-01-28
|
End Date |
2016-01-28
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
4.75
|
|
Start Date |
2014-11-12
|
End Date |
2014-11-12
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
5.75
|
|
Start Date |
2014-08-05
|
End Date |
2014-08-06
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
6.5
|
|
Start Date |
2013-01-02
|
End Date |
2013-01-02
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
7.75
|
|
Start Date |
2011-12-27
|
End Date |
2011-12-29
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
25.5
|
|
Start Date |
2010-11-23
|
End Date |
2010-11-23
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
6.5
|
|
Start Date |
2010-06-23
|
End Date |
2010-07-07
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
7
|
|
Start Date |
2009-01-20
|
End Date |
2009-01-20
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
4.75
|
|
Start Date |
2008-12-30
|
End Date |
2008-12-31
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
14
|
|
Start Date |
2008-08-06
|
End Date |
2008-08-07
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
7.5
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2024
|
Annual Hours
|
0
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
0
|
Avg. Employee Hours
|
0
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2024
|
Annual Hours
|
4
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
4
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2023
|
Annual Hours
|
4
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
4
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2022
|
Annual Hours
|
4
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
4
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2021
|
Annual Hours
|
4
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
4
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2020
|
Annual Hours
|
4
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
4
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2019
|
Annual Hours
|
4
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
4
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2018
|
Annual Hours
|
4
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
4
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2017
|
Annual Hours
|
4
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
4
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2016
|
Annual Hours
|
4
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
4
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2015
|
Annual Hours
|
4
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
4
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2014
|
Annual Hours
|
4
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
4
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2013
|
Annual Hours
|
4
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
4
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2012
|
Annual Hours
|
4
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
4
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2011
|
Annual Hours
|
4
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
4
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2010
|
Annual Hours
|
4
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
4
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2009
|
Annual Hours
|
4
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
4
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2008
|
Annual Hours
|
4
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
4
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2007
|
Annual Hours
|
3132
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1566
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2007
|
Annual Hours
|
48
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
48
|
|
|
WINGO PIT
|
Surface
|
Abandoned
|
Common Clays NEC
|
|
Directions to Mine |
From Mayfield take KY-58 South. go aprox 9 miles and turn left onto State Route 1283. Go 1.5 miles and turn right onto State Route 944. Mine is aprox. 5 mines on right.
|
Parties
Name
|
Meridian Brick LLC
|
Role
|
Operator
|
Start Date
|
2017-04-01
|
End Date
|
2022-12-19
|
|
Name
|
Boral Bricks Inc
|
Role
|
Operator
|
Start Date
|
2000-07-20
|
End Date
|
2017-03-31
|
|
Name
|
Tony Grooms Construction Company
|
Role
|
Operator
|
Start Date
|
2000-06-01
|
End Date
|
2000-07-19
|
|
Name
|
General Shale Brick, Inc.
|
Role
|
Operator
|
Start Date
|
2022-12-20
|
|
Name
|
Wienerberger AG
|
Role
|
Current Controller
|
Start Date
|
2022-12-20
|
|
Name
|
General Shale Brick, Inc.
|
Role
|
Current Operator
|
|
Inspections
Start Date |
2018-10-11
|
End Date |
2018-10-11
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
8
|
|
Start Date |
2017-12-06
|
End Date |
2017-12-06
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
10.75
|
|
Start Date |
2017-02-15
|
End Date |
2017-02-15
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
3.25
|
|
Start Date |
2016-09-15
|
End Date |
2016-09-15
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
2.5
|
|
Start Date |
2011-02-03
|
End Date |
2011-02-03
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
5
|
|
Start Date |
2010-08-24
|
End Date |
2010-08-25
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
15
|
|
Start Date |
2009-11-18
|
End Date |
2009-11-19
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
22.25
|
|
Start Date |
2009-09-21
|
End Date |
2009-09-21
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
1.75
|
|
Start Date |
2009-07-14
|
End Date |
2009-07-14
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
15
|
|
Start Date |
2009-06-24
|
End Date |
2009-06-24
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
3.25
|
|
Start Date |
2009-04-08
|
End Date |
2009-04-08
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
1.75
|
|
Start Date |
2008-09-30
|
End Date |
2008-10-06
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
13.5
|
|
Start Date |
2008-02-05
|
End Date |
2008-02-05
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
8
|
|
Start Date |
2006-04-19
|
End Date |
2006-04-19
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
4.25
|
|
Start Date |
2005-08-18
|
End Date |
2005-08-18
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
4
|
|
Start Date |
2004-06-08
|
End Date |
2004-06-09
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
1
|
Total Hours |
19
|
|
Start Date |
2003-12-16
|
End Date |
2003-12-16
|
Activity |
MISCELLANEOUS INSPECTION/INVESTIGATION
|
Number Inspectors |
1
|
Total Hours |
6
|
|
Start Date |
2003-09-08
|
End Date |
2003-09-08
|
Activity |
COMPLIANCE FOLLOW-UP INSPECTION
|
Number Inspectors |
1
|
Total Hours |
1
|
|
Start Date |
2003-05-06
|
End Date |
2003-05-06
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
2
|
Total Hours |
6
|
|
Start Date |
2002-10-29
|
End Date |
2002-10-29
|
Activity |
MISCELLANEOUS INSPECTION/INVESTIGATION
|
Number Inspectors |
1
|
Total Hours |
2
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2018
|
Annual Hours
|
14
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
14
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2017
|
Annual Hours
|
16
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
16
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2016
|
Annual Hours
|
28
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
28
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2015
|
Annual Hours
|
39
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
39
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2014
|
Annual Hours
|
40
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
40
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2013
|
Annual Hours
|
80
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
40
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2012
|
Annual Hours
|
80
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
40
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2011
|
Annual Hours
|
110
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
55
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2010
|
Annual Hours
|
120
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
60
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2009
|
Annual Hours
|
90
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
45
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2008
|
Annual Hours
|
80
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
40
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2007
|
Annual Hours
|
150
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
75
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2006
|
Annual Hours
|
160
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
80
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2005
|
Annual Hours
|
66
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
66
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2004
|
Annual Hours
|
76
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
38
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2003
|
Annual Hours
|
1539
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
308
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2002
|
Annual Hours
|
824
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
275
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2001
|
Annual Hours
|
1353
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
338
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2000
|
Annual Hours
|
1719
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
344
|
|
|