Search icon

JOHN HENRY QUARRIES, LLC

Company Details

Name: JOHN HENRY QUARRIES, LLC
Legal type: Kentucky Limited Liability Company
Status: Inactive
Standing: Bad
File Date: 02 Apr 2004 (21 years ago)
Organization Date: 02 Apr 2004 (21 years ago)
Last Annual Report: 05 Jun 2013 (12 years ago)
Managed By: Members
Organization Number: 0582887
Principal Office: 1908 UNRUH COURT, NEW ALBANY, IN 47150
Place of Formation: KENTUCKY

Registered Agent

Name Role
FRED W. BANKS Registered Agent

Member

Name Role
CUBS LLC Member
JAMES COFFEY & HAL COFFEY OF HICKMAN KY LLC Member
HFT ENTERPRISES LLC Member
ROCKON LLC Member
Fred W Banks Member

Organizer

Name Role
FRED W. BANKS Organizer

Filings

Name File Date
Administrative Dissolution 2014-09-30
Annual Report 2013-06-05
Annual Report 2012-06-26
Annual Report 2011-02-10
Annual Report 2010-03-05
Annual Report 2009-10-05
Annual Report 2008-04-24
Principal Office Address Change 2007-05-14
Annual Report 2007-04-30
Annual Report 2006-03-13

Mines

Mine Name Type Status Primary Sic
Lake City Quarry Surface Abandoned Crushed, Broken Limestone NEC
Directions to Mine Take I-24 West into Kentucky. Take exit 31 and turn right on KY 453N toward Grand Rivers/Smithland. Go 2.6 minles and mine is on the left.

Parties

Name John Henry Quarries, LLC
Role Operator
Start Date 2004-05-01
End Date 2005-12-29
Name Florida Rock Industries Inc
Role Operator
Start Date 2005-12-30
End Date 2007-11-15
Name Vulcan Construction Materials, LLC
Role Operator
Start Date 2007-11-16
Name Vulcan Materials Company
Role Current Controller
Start Date 2007-11-16
Name Vulcan Construction Materials, LLC
Role Current Operator

Accidents

Accident Date 2007-05-22
Degree Inhury DAYS RESTRICTED ACTIVITY ONLY
Accident Type Caught in, under or between a moving and a stationary object
Ocupation Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech
Narrative Employee was helping with changing impact crusher hammers. He got his left little finger smashed between the hammer wedges. His injury required stitches.
Accident Date 2006-04-11
Degree Inhury NO DYS AWY FRM WRK,NO RSTR ACT
Accident Type Struck by... NEC
Ocupation Assayer, Geologist, Metallurgist, Engineer, Engineer management
Narrative Employee was removing a screen bearing. A helper was tapping the bearing raise with a hammer to remove the raise from the screen shaft. A piece of metal came off the raise and hit the employee in the left elbow bend.
Accident Date 2006-01-09
Degree Inhury INJURIES DUE TO NATURAL CAUSES
Accident Type NEC
Ocupation Laborer, Blacksmith, Bull gang, Parts runner, Roustabout, Pick-up man, Pitman
Narrative 911 was called & emergency medical help was dispatched to location - contract employee suffered a heart attack on mining property & was removed by ambulance.
Accident Date 2004-12-09
Degree Inhury DAYS AWAY FROM WORK ONLY
Accident Type Over-exertion in lifting objects
Ocupation Laborer, Blacksmith, Bull gang, Parts runner, Roustabout, Pick-up man, Pitman
Narrative Alleged accident happened when miner moved rock to hold drawbar down on pump.He told other that he thought he hurt his back.he finished week out w/o incident.He called on Monday and said he was going to family dr and she put him off work until 12/27. we sent him to our occupational Dr on 12/14 and he immediately release him for lighduty as of 12/20 he has not reported back to work.

Inspections

Start Date 2013-07-16
End Date 2013-07-16
Activity Mine Idle Activity
Number Inspectors 1
Total Hours 1
Start Date 2010-01-25
End Date 2010-01-25
Activity Mine Idle Activity
Number Inspectors 1
Total Hours 6
Start Date 2009-03-06
End Date 2009-03-06
Activity Mine Idle Activity
Number Inspectors 1
Total Hours 4.5
Start Date 2008-12-22
End Date 2008-12-22
Activity Mine Idle Activity
Number Inspectors 1
Total Hours 3.75
Start Date 2008-04-07
End Date 2008-04-09
Activity Regular Safety and Health Inspection
Number Inspectors 1
Total Hours 28
Start Date 2007-11-08
End Date 2007-11-08
Activity Compliance Follow-up Inspection
Number Inspectors 1
Total Hours 7
Start Date 2007-10-29
End Date 2007-11-01
Activity Regular Safety and Health Inspection
Number Inspectors 1
Total Hours 38
Start Date 2007-05-29
End Date 2007-05-31
Activity Regular Safety and Health Inspection
Number Inspectors 1
Total Hours 28.25
Start Date 2007-05-24
End Date 2007-05-24
Activity Verbal Hazard Complaint Inspections
Number Inspectors 1
Total Hours 6
Start Date 2007-01-09
End Date 2007-01-11
Activity Regular Safety and Health Inspection
Number Inspectors 1
Total Hours 29.25
Start Date 2006-02-15
End Date 2006-02-22
Activity Regular Safety and Health Inspection
Number Inspectors 1
Total Hours 25.5
Start Date 2006-01-10
End Date 2006-01-11
Activity Spot Inspection
Number Inspectors 1
Total Hours 10.25
Start Date 2005-06-13
End Date 2005-06-15
Activity Regular Safety and Health Inspection
Number Inspectors 1
Total Hours 25.5
Start Date 2004-10-28
End Date 2004-10-28
Activity SPECIAL ENFORCEMENT 3
Number Inspectors 1
Total Hours 1
Start Date 2004-10-26
End Date 2004-10-28
Activity REGULAR INSPECTION
Number Inspectors 1
Total Hours 36

Productions

Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2008
Annual Hours 24106
Annual Coal Prod 0
Avg. Annual Empl. 8
Avg. Employee Hours 3013
Sub-Unit Desc OFFICE WORKERS AT MINE SITE
Year 2008
Annual Hours 4109
Annual Coal Prod 0
Avg. Annual Empl. 2
Avg. Employee Hours 2055
Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2007
Annual Hours 47350
Annual Coal Prod 0
Avg. Annual Empl. 16
Avg. Employee Hours 2959
Sub-Unit Desc OFFICE WORKERS AT MINE SITE
Year 2007
Annual Hours 5308
Annual Coal Prod 0
Avg. Annual Empl. 2
Avg. Employee Hours 2654
Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2006
Annual Hours 36916
Annual Coal Prod 0
Avg. Annual Empl. 15
Avg. Employee Hours 2461
Sub-Unit Desc OFFICE WORKERS AT MINE SITE
Year 2006
Annual Hours 5998
Annual Coal Prod 0
Avg. Annual Empl. 2
Avg. Employee Hours 2999
Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2005
Annual Hours 23648
Annual Coal Prod 0
Avg. Annual Empl. 9
Avg. Employee Hours 2628
Sub-Unit Desc OFFICE WORKERS AT MINE SITE
Year 2005
Annual Hours 5722
Annual Coal Prod 0
Avg. Annual Empl. 3
Avg. Employee Hours 1907
Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2004
Annual Hours 12756
Annual Coal Prod 0
Avg. Annual Empl. 10
Avg. Employee Hours 1276
Sub-Unit Desc OFFICE WORKERS AT MINE SITE
Year 2004
Annual Hours 846
Annual Coal Prod 0
Avg. Annual Empl. 1
Avg. Employee Hours 846

Sources: Kentucky Secretary of State