Name: | RIGHT FORK ENERGY, INC. |
Legal type: | Kentucky Corporation |
Status: | Inactive |
Standing: | Bad |
Profit or Non-Profit: | Profit |
File Date: | 23 Mar 2005 (20 years ago) |
Organization Date: | 23 Mar 2005 (20 years ago) |
Last Annual Report: | 23 Jun 2006 (19 years ago) |
Organization Number: | 0609070 |
ZIP code: | 41543 |
City: | Mc Andrews |
Primary County: | Pike County |
Principal Office: | 2889 PINSONFORK RD, MCANDREWS, KY 41543 |
Place of Formation: | KENTUCKY |
Authorized Shares: | 1000 |
Name | Role |
---|---|
FRED RUNYON JR | Registered Agent |
Name | Role |
---|---|
JACK MAY | Member |
Name | Role |
---|---|
ERIC MAY | Secretary |
Name | Role |
---|---|
ERIC MAY | Treasurer |
Name | Role |
---|---|
JACK MAY | Director |
Name | Role |
---|---|
JACK MAY | Signature |
Name | Role |
---|---|
JACK M MAY | Incorporator |
Name | File Date |
---|---|
Administrative Dissolution | 2007-11-01 |
Annual Report | 2006-06-23 |
Articles of Incorporation | 2005-03-23 |
Mine Name | Type | Status | Primary Sic | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
No. 1 | Underground | Abandoned and Sealed | Coal (Bituminous) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Name | Right Fork Energy Inc |
Role | Operator |
Start Date | 2005-07-06 |
Name | Jack M May |
Role | Current Controller |
Start Date | 2005-07-06 |
Name | Right Fork Energy Inc |
Role | Current Operator |
Accidents
Accident Date | 2006-07-27 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Struck against stationary object |
Ocupation | Laborer, Bull gang, Faceman, Parts runner, Roustabout, Roof trimmer/scaler |
Narrative | Injured employee was riding a 3 wheel ride and turned to go over to the next entry and hit a scoop that was left unattended with the lights off. The collision caused the injured employee to hit his head in the roof causing a laceration to the right temple area. |
Accident Date | 2006-07-06 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Struck by falling object |
Ocupation | Roof bolter, Rock bolter, Pinner, Mobile roof support operator (MRS) |
Narrative | Employee was bolting an area shot out for clearance. He was installing the bolts out of sequence when a piece of draw rock fell on his back. |
Accident Date | 2005-11-01 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Struck against stationary object |
Ocupation | Roof bolter, Rock bolter, Pinner, Mobile roof support operator (MRS) |
Narrative | EMPLOYEE WAS CRAWLING BESIDE ROOF BOLTER & CAUGHT SHOULDER ON ROOF BOLT. |
Inspections
Start Date | 2012-06-01 |
End Date | 2012-06-01 |
Activity | Mine Idle Activity |
Number Inspectors | 1 |
Total Hours | 1.5 |
Start Date | 2010-01-21 |
End Date | 2010-01-21 |
Activity | Spot Inspection |
Number Inspectors | 2 |
Total Hours | 5 |
Start Date | 2009-12-22 |
End Date | 2009-12-23 |
Activity | Mine Idle Activity |
Number Inspectors | 1 |
Total Hours | 4 |
Start Date | 2007-05-08 |
End Date | 2007-05-08 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 3 |
Start Date | 2007-04-27 |
End Date | 2007-04-27 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 4 |
Start Date | 2007-01-31 |
End Date | 2007-02-05 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 23 |
Start Date | 2006-10-04 |
End Date | 2006-11-09 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 2 |
Total Hours | 20 |
Start Date | 2006-07-06 |
End Date | 2006-07-25 |
Activity | Non-Fatal Accident Investigation |
Number Inspectors | 4 |
Total Hours | 50.5 |
Start Date | 2006-07-03 |
End Date | 2006-09-20 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 5 |
Total Hours | 139.5 |
Start Date | 2006-04-03 |
End Date | 2006-06-08 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 3 |
Total Hours | 111 |
Start Date | 2006-01-06 |
End Date | 2006-03-24 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 6 |
Total Hours | 224.25 |
Start Date | 2005-12-27 |
End Date | 2005-12-27 |
Activity | Spot Inspection |
Number Inspectors | 1 |
Total Hours | 8 |
Start Date | 2005-11-01 |
End Date | 2005-12-20 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 4 |
Total Hours | 96 |
Start Date | 2005-10-14 |
End Date | 2005-10-14 |
Activity | Spot Inspection |
Number Inspectors | 1 |
Total Hours | 4 |
Start Date | 2005-08-16 |
End Date | 2005-09-23 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 4 |
Total Hours | 70 |
Start Date | 2005-07-26 |
End Date | 2005-08-15 |
Activity | Electrical Technical Investigation |
Number Inspectors | 2 |
Total Hours | 12 |
Productions
Sub-Unit Desc | UNDERGROUND |
Year | 2006 |
Annual Hours | 11357 |
Annual Coal Prod | 24441 |
Avg. Annual Empl. | 12 |
Avg. Employee Hours | 946 |
Sub-Unit Desc | SURFACE AT UNDERGROUND |
Year | 2006 |
Annual Hours | 3747 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 2 |
Avg. Employee Hours | 1874 |
Sub-Unit Desc | UNDERGROUND |
Year | 2005 |
Annual Hours | 11050 |
Annual Coal Prod | 14917 |
Avg. Annual Empl. | 17 |
Avg. Employee Hours | 650 |
Sub-Unit Desc | SURFACE AT UNDERGROUND |
Year | 2005 |
Annual Hours | 2600 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 4 |
Avg. Employee Hours | 650 |
Directions to Mine | Route 194 to Route 632 to Route 3419 on Callaway Branch, Near Ransom, in Pike County, Ky. |
Parties
Name | Little Ty Coal Co. Inc. |
Role | Operator |
Start Date | 2006-12-14 |
End Date | 2008-05-12 |
Name | Right Fork Energy Inc |
Role | Operator |
Start Date | 2006-02-27 |
End Date | 2006-12-13 |
Name | Blackberry Energy LLC |
Role | Operator |
Start Date | 2008-05-13 |
End Date | 2017-02-14 |
Name | Connor Coal Inc. |
Role | Operator |
Start Date | 2017-02-15 |
End Date | 2017-06-22 |
Name | Little Tackett Mining, L.L.C. |
Role | Operator |
Start Date | 2017-06-23 |
End Date | 2018-05-09 |
Name | Dude Branch III, LLC |
Role | Operator |
Start Date | 2021-09-14 |
End Date | 2023-01-02 |
Name | J & E Mining Inc |
Role | Operator |
Start Date | 2023-12-12 |
End Date | 2024-05-23 |
Name | Tackett Mining, Inc. |
Role | Operator |
Start Date | 2024-05-24 |
Name | Lester And Sons Inc |
Role | Operator |
Start Date | 2018-05-10 |
End Date | 2021-09-13 |
Name | Reliant Contracting, LLC |
Role | Operator |
Start Date | 2023-01-03 |
End Date | 2023-12-11 |
Name | Jerry Tackett |
Role | Current Controller |
Start Date | 2024-05-24 |
Name | Tackett Mining, Inc. |
Role | Current Operator |
Accidents
Accident Date | 2019-12-06 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Struck against stationary object |
Ocupation | Roof bolter, Rock bolter, Pinner, Mobile roof support operator (MRS) |
Narrative | Employee had pulled roof bolter up in #9 entry on 001-1 section to prepare to start bolting place and was bending bolts to be installed first when hand slipped off roof bolt hitting hand on ground and roof bolter. |
Accident Date | 2019-12-05 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Struck by flying object |
Ocupation | Driller operator |
Narrative | Had a bit break off in end of coal drill auger, myself and IE were beating old bit with hammer. Piece of bit broke off hitting IE in the eye, we both were wearing safety glasses but the piece that hit EE busted EE's glasses. |
Accident Date | 2019-10-11 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Caught in, under or between a moving and a stationary object |
Ocupation | Scoop tram operator, Load/Haul/Dump operator |
Narrative | EE stated EE had a leak on one of the bucket jacks, raised head up over top of scoop while scoop still moving to see if EE could see the leak and caught head between scoop and mine roof. |
Accident Date | 2019-10-01 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Struck by falling object |
Ocupation | Scoop car/Scooptram operator, Load/Haul/Dump (LHD) operator, Teletram operator |
Narrative | EE was loading coal out of face of #3 heading. When small piece of rock fell hitting EE on knee, EE never told. Worked rest of shift, then went to E.R. that night. Said bruised knee cap, nothing broke. |
Accident Date | 2018-01-23 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Caught in, under or between a moving and a stationary object |
Ocupation | Scoop tram operator, Load/Haul/Dump operator |
Narrative | Victim was injured when a scoop rolled forward resulting in victims left leg receiving trauma and fractured fibula, prior to being pulled from under the scoop. |
Accident Date | 2006-11-22 |
Degree Inhury | ACCIDENT ONLY |
Accident Type | Accident type, without injuries |
Ocupation | NO VALUE FOUND |
Narrative | Cutting machine was cutting #1 entry when water started coming in. We evacuated the men & made provisions to pump water. After the water had cleared, it was determined we had cut into a cone hole drilled from above. |
Accident Date | 2006-10-26 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Caught in, under or between running or meshing objects |
Ocupation | Discontinued 1/31/2014. Several other codes cover Scoop Car Operator |
Narrative | Scoop operator was dumping coal onto section tailpiece. He accidentally knocked the guard off of the tailpiece roller & caused the section belt to gob off. He helped the tailpiece man clean it up. According to the tailpiece man, after cleaning, the belt was turned on before the guard was put back on. Emp. tripped & put hand in roller. |
Inspections
Start Date | 2024-10-10 |
End Date | 2024-10-10 |
Activity | Spot Inspection |
Number Inspectors | 1 |
Total Hours | 2.75 |
Start Date | 2024-04-02 |
End Date | 2024-05-29 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 86 |
Start Date | 2024-01-17 |
End Date | 2024-03-21 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 73.5 |
Start Date | 2023-12-04 |
End Date | 2023-12-04 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 8 |
Start Date | 2023-07-06 |
End Date | 2023-08-31 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 4 |
Total Hours | 121.5 |
Start Date | 2023-04-14 |
End Date | 2023-06-29 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 100.75 |
Start Date | 2023-01-06 |
End Date | 2023-03-06 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 2 |
Total Hours | 15.25 |
Start Date | 2022-11-21 |
End Date | 2022-11-21 |
Activity | Spot Inspection |
Number Inspectors | 1 |
Total Hours | 3 |
Start Date | 2022-10-03 |
End Date | 2022-11-02 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 2 |
Total Hours | 13 |
Start Date | 2022-07-06 |
End Date | 2022-09-21 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 5 |
Total Hours | 226.5 |
Start Date | 2022-04-06 |
End Date | 2022-06-28 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 4 |
Total Hours | 230.75 |
Start Date | 2022-01-05 |
End Date | 2022-03-23 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 4 |
Total Hours | 79.5 |
Start Date | 2022-01-03 |
End Date | 2022-01-03 |
Activity | Spot Inspection |
Number Inspectors | 1 |
Total Hours | 9.5 |
Start Date | 2021-12-14 |
End Date | 2021-12-14 |
Activity | 103 (g) Written Notification Hazard Complaint Inspectio |
Number Inspectors | 1 |
Total Hours | 3.25 |
Start Date | 2021-10-28 |
End Date | 2021-12-17 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 2 |
Total Hours | 28.5 |
Start Date | 2021-09-08 |
End Date | 2021-09-08 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 5 |
Start Date | 2021-04-28 |
End Date | 2021-04-28 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 5.5 |
Start Date | 2021-01-08 |
End Date | 2021-03-22 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 15.5 |
Start Date | 2020-10-05 |
End Date | 2020-12-17 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 3 |
Total Hours | 14.5 |
Start Date | 2020-09-02 |
End Date | 2020-09-24 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 19.25 |
Productions
Sub-Unit Desc | UNDERGROUND |
Year | 2024 |
Annual Hours | 0 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 0 |
Avg. Employee Hours | 0 |
Sub-Unit Desc | SURFACE AT UNDERGROUND |
Year | 2024 |
Annual Hours | 0 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 0 |
Avg. Employee Hours | 0 |
Sub-Unit Desc | UNDERGROUND |
Year | 2022 |
Annual Hours | 1965 |
Annual Coal Prod | 7450 |
Avg. Annual Empl. | 9 |
Avg. Employee Hours | 218 |
Sub-Unit Desc | UNDERGROUND |
Year | 2021 |
Annual Hours | 980 |
Annual Coal Prod | 4800 |
Avg. Annual Empl. | 9 |
Avg. Employee Hours | 109 |
Sub-Unit Desc | UNDERGROUND |
Year | 2019 |
Annual Hours | 8625 |
Annual Coal Prod | 14381 |
Avg. Annual Empl. | 8 |
Avg. Employee Hours | 1078 |
Sub-Unit Desc | SURFACE AT UNDERGROUND |
Year | 2019 |
Annual Hours | 1947 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 2 |
Avg. Employee Hours | 974 |
Sub-Unit Desc | UNDERGROUND |
Year | 2018 |
Annual Hours | 11272 |
Annual Coal Prod | 14675 |
Avg. Annual Empl. | 9 |
Avg. Employee Hours | 1252 |
Sub-Unit Desc | SURFACE AT UNDERGROUND |
Year | 2018 |
Annual Hours | 2861 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 2 |
Avg. Employee Hours | 1431 |
Sub-Unit Desc | UNDERGROUND |
Year | 2017 |
Annual Hours | 3912 |
Annual Coal Prod | 5942 |
Avg. Annual Empl. | 9 |
Avg. Employee Hours | 435 |
Sub-Unit Desc | SURFACE AT UNDERGROUND |
Year | 2017 |
Annual Hours | 1040 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 2 |
Avg. Employee Hours | 520 |
Sub-Unit Desc | UNDERGROUND |
Year | 2007 |
Annual Hours | 8185 |
Annual Coal Prod | 15460 |
Avg. Annual Empl. | 11 |
Avg. Employee Hours | 744 |
Sub-Unit Desc | SURFACE AT UNDERGROUND |
Year | 2007 |
Annual Hours | 960 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 1 |
Avg. Employee Hours | 960 |
Sub-Unit Desc | UNDERGROUND |
Year | 2006 |
Annual Hours | 4180 |
Annual Coal Prod | 8384 |
Avg. Annual Empl. | 6 |
Avg. Employee Hours | 697 |
Sub-Unit Desc | SURFACE AT UNDERGROUND |
Year | 2006 |
Annual Hours | 1528 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 2 |
Avg. Employee Hours | 764 |
Directions to Mine | Rt. 3419 - Left Fk. of Blackberry Creek - Mine on Netley Fork of Left Fk. of Blackberry |
Parties
Name | Right Fork Energy Inc |
Role | Operator |
Start Date | 2006-10-31 |
End Date | 2007-02-14 |
Name | Netley Branch Coal Co Inc |
Role | Operator |
Start Date | 2007-02-15 |
End Date | 2008-03-23 |
Name | Blackberry Energy LLC |
Role | Operator |
Start Date | 2008-03-24 |
End Date | 2011-02-24 |
Name | New Tech Mining Inc. |
Role | Operator |
Start Date | 2011-02-25 |
End Date | 2018-09-25 |
Name | PLATINUM ENERGY LLC |
Role | Operator |
Start Date | 2018-09-26 |
Name | Bill C Smith |
Role | Current Controller |
Start Date | 2018-09-26 |
Name | PLATINUM ENERGY LLC |
Role | Current Operator |
Inspections
Start Date | 2019-10-11 |
End Date | 2019-10-11 |
Activity | Mine Idle Activity |
Number Inspectors | 1 |
Total Hours | 5.5 |
Start Date | 2019-08-08 |
End Date | 2019-08-08 |
Activity | Mine Idle Activity |
Number Inspectors | 1 |
Total Hours | 5 |
Start Date | 2018-12-18 |
End Date | 2018-12-18 |
Activity | Spot Inspection |
Number Inspectors | 1 |
Total Hours | 7 |
Start Date | 2018-10-17 |
End Date | 2018-10-31 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 23.5 |
Start Date | 2018-09-12 |
End Date | 2018-09-18 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 2 |
Total Hours | 34 |
Start Date | 2018-08-17 |
End Date | 2018-08-17 |
Activity | Spot Inspection |
Number Inspectors | 1 |
Total Hours | 5.5 |
Start Date | 2012-06-01 |
End Date | 2012-06-01 |
Activity | Mine Idle Activity |
Number Inspectors | 1 |
Total Hours | 2 |
Start Date | 2011-07-22 |
End Date | 2011-07-22 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 3.5 |
Start Date | 2010-03-29 |
End Date | 2010-03-30 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 5 |
Start Date | 2010-03-08 |
End Date | 2010-03-09 |
Activity | Roof Control Technical Investigation |
Number Inspectors | 1 |
Total Hours | 3 |
Start Date | 2009-12-22 |
End Date | 2009-12-22 |
Activity | Mine Idle Activity |
Number Inspectors | 1 |
Total Hours | 1 |
Start Date | 2009-04-27 |
End Date | 2009-04-27 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 8 |
Start Date | 2009-01-02 |
End Date | 2009-03-23 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 44.75 |
Start Date | 2008-11-12 |
End Date | 2008-11-13 |
Activity | 103 (g) Written Notification Hazard Complaint Inspectio |
Number Inspectors | 4 |
Total Hours | 18 |
Start Date | 2008-10-01 |
End Date | 2008-12-31 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 5 |
Total Hours | 170 |
Start Date | 2008-08-01 |
End Date | 2008-09-08 |
Activity | Non-Injury Accident Investigation |
Number Inspectors | 6 |
Total Hours | 72.5 |
Start Date | 2008-07-02 |
End Date | 2008-09-29 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 6 |
Total Hours | 170.25 |
Start Date | 2008-04-28 |
End Date | 2008-06-30 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 2 |
Total Hours | 124.25 |
Start Date | 2008-03-28 |
End Date | 2008-03-28 |
Activity | Compliance Follow-up Inspection |
Number Inspectors | 1 |
Total Hours | 4 |
Start Date | 2008-02-25 |
End Date | 2008-03-18 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 37.5 |
Productions
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2019 |
Annual Hours | 440 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 11 |
Avg. Employee Hours | 40 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2019 |
Annual Hours | 40 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 1 |
Avg. Employee Hours | 40 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2009 |
Annual Hours | 440 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 1 |
Avg. Employee Hours | 440 |
Sub-Unit Desc | UNDERGROUND |
Year | 2008 |
Annual Hours | 19432 |
Annual Coal Prod | 35293 |
Avg. Annual Empl. | 30 |
Avg. Employee Hours | 648 |
Sub-Unit Desc | SURFACE AT UNDERGROUND |
Year | 2008 |
Annual Hours | 1960 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 3 |
Avg. Employee Hours | 653 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2008 |
Annual Hours | 2040 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 3 |
Avg. Employee Hours | 680 |
Sources: Kentucky Secretary of State