Directions to Mine |
US 23 N 33.3 miles, left on Penny Road (KY 1469) 1.6 miles, mine entrance on right.
|
Parties
Name
|
New Jet LLC
|
Role
|
Operator
|
Start Date
|
2011-07-22
|
End Date
|
2013-02-12
|
|
Name
|
Bitco Resources Inc.
|
Role
|
Operator
|
Start Date
|
2013-02-13
|
|
Name
|
South Akers Mining Company, LLC
|
Role
|
Operator
|
Start Date
|
2010-05-03
|
End Date
|
2011-07-21
|
|
Name
|
Nova, Inc
|
Role
|
Operator
|
Start Date
|
2009-07-29
|
End Date
|
2010-05-02
|
|
Name
|
Kevin R Yonts
|
Role
|
Current Controller
|
Start Date
|
2013-02-13
|
|
Name
|
Bitco Resources Inc.
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2012-07-09
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Struck by... NEC
|
Ocupation |
Discontinued 1/31/2014. Several other codes cover Scoop Car Operator
|
Narrative |
Employee was positioning waterline to haul UG. A joint had unknowingly got into a bind & when he moved it, it sprang back & hit him in head creating a cut that required stitches.
|
|
Accident Date |
2012-05-15
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Caught in, under or between a moving and a stationary object
|
Ocupation |
Laborer, Bull gang, Parts runner, Roustabout, Roof trimmer/scaler
|
Narrative |
One employee was throwing cinder blocks through a mandoor to the victim. Through a lack of communication, victim started to pick up a block as another one was being thrown resulting in a pinched finger. Right ring finger required stitches and bandaging.
|
|
Accident Date |
2011-04-20
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Over-exertion in lifting objects
|
Ocupation |
Scoop tram operator, Load/Haul/Dump operator
|
Narrative |
Three men were lifting cable in order to hang it from the top. After hanging the cable 1.5 hours later EE said that he thought he had hurt his leg. He worked the rest of the shift and went home, called that night and went to the doctor the next morning.
|
|
Accident Date |
2011-04-18
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Over-exertion NEC
|
Ocupation |
Beltman, Conveyor man, Conveyor belt worker, Mobile bridge carrierman, Feeder operator, Conveyor rider
|
Narrative |
Men were in the process of hanging cable so shuttle car could haul under it. EE's where holding up cable while another ee twisted wire around it in order to hold it up. He then left section and told another ee that he had strained his groin & that he was going home.
|
|
Inspections
Start Date |
2024-11-18
|
End Date |
2024-11-18
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
2.25
|
|
Start Date |
2019-12-17
|
End Date |
2019-12-17
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
5
|
|
Start Date |
2019-05-20
|
End Date |
2019-05-20
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
1.5
|
|
Start Date |
2019-02-20
|
End Date |
2019-02-20
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
5
|
|
Start Date |
2018-10-02
|
End Date |
2018-10-02
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
2
|
|
Start Date |
2018-06-28
|
End Date |
2018-06-28
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
3
|
|
Start Date |
2018-01-18
|
End Date |
2018-01-18
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
2
|
|
Start Date |
2017-11-03
|
End Date |
2017-11-03
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
3.5
|
|
Start Date |
2017-08-23
|
End Date |
2017-08-23
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
4
|
|
Start Date |
2017-05-08
|
End Date |
2017-05-08
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
4.5
|
|
Start Date |
2016-05-31
|
End Date |
2016-05-31
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
4
|
|
Start Date |
2016-04-19
|
End Date |
2016-04-19
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
8
|
|
Start Date |
2016-02-01
|
End Date |
2016-02-02
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
11
|
|
Start Date |
2015-04-24
|
End Date |
2015-04-27
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
10
|
|
Start Date |
2015-01-08
|
End Date |
2015-01-09
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
9
|
|
Start Date |
2014-05-01
|
End Date |
2014-05-01
|
Activity |
Ventilation Technical Investigation
|
Number Inspectors |
1
|
Total Hours |
3
|
|
Start Date |
2014-04-23
|
End Date |
2014-09-29
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
31
|
|
Start Date |
2014-03-12
|
End Date |
2014-03-12
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
8
|
|
Start Date |
2013-12-03
|
End Date |
2013-12-03
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
6
|
|
Start Date |
2013-08-09
|
End Date |
2013-09-17
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
29.5
|
|
Productions
Sub-Unit Desc
|
UNDERGROUND
|
Year
|
2012
|
Annual Hours
|
26264
|
Annual Coal Prod
|
78398
|
Avg. Annual Empl.
|
12
|
Avg. Employee Hours
|
2189
|
|
Sub-Unit Desc
|
SURFACE AT UNDERGROUND
|
Year
|
2012
|
Annual Hours
|
5298
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
2649
|
|
Sub-Unit Desc
|
UNDERGROUND
|
Year
|
2011
|
Annual Hours
|
39466
|
Annual Coal Prod
|
79079
|
Avg. Annual Empl.
|
16
|
Avg. Employee Hours
|
2467
|
|
Sub-Unit Desc
|
SURFACE AT UNDERGROUND
|
Year
|
2011
|
Annual Hours
|
2636
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
8
|
Avg. Employee Hours
|
330
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2011
|
Annual Hours
|
1040
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1040
|
|
Sub-Unit Desc
|
UNDERGROUND
|
Year
|
2010
|
Annual Hours
|
17136
|
Annual Coal Prod
|
30401
|
Avg. Annual Empl.
|
13
|
Avg. Employee Hours
|
1318
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2010
|
Annual Hours
|
418
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
209
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2010
|
Annual Hours
|
1000
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1000
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2009
|
Annual Hours
|
3555
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
889
|
|
|
Directions to Mine |
Bottom Fork of Wright Fk Northeast of Fleming Neon
|
Parties
Name
|
Raintite Contracting Inc
|
Role
|
Operator
|
Start Date
|
2010-07-19
|
End Date
|
2011-04-12
|
|
Name
|
Mountain Top Hydroseeding Inc
|
Role
|
Operator
|
Start Date
|
2011-04-13
|
End Date
|
2011-09-21
|
|
Name
|
Bitco Resources Inc
|
Role
|
Operator
|
Start Date
|
2011-09-22
|
|
Name
|
Kevin R Yonts
|
Role
|
Current Controller
|
Start Date
|
2011-09-22
|
|
Name
|
Bitco Resources Inc
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2012-05-21
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Caught in, under or between NEC
|
Ocupation |
Roof bolter, Rock bolter, Pinner, Mobile roof support operator (MRS)
|
Narrative |
Wet, muddy Miner slipped on loose structure entangling right foot in structure.
|
|
Inspections
Start Date |
2013-03-05
|
End Date |
2013-03-05
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
2
|
|
Start Date |
2012-10-30
|
End Date |
2012-10-31
|
Activity |
Roof Control Technical Investigation
|
Number Inspectors |
1
|
Total Hours |
6
|
|
Start Date |
2012-10-22
|
End Date |
2012-11-28
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
27.5
|
|
Start Date |
2012-09-10
|
End Date |
2012-09-10
|
Activity |
Spot Inspection
|
Number Inspectors |
2
|
Total Hours |
3.5
|
|
Start Date |
2012-07-09
|
End Date |
2012-09-17
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
5
|
Total Hours |
66
|
|
Start Date |
2012-07-03
|
End Date |
2012-07-03
|
Activity |
Roof Control Technical Investigation
|
Number Inspectors |
1
|
Total Hours |
8
|
|
Start Date |
2012-05-07
|
End Date |
2012-05-15
|
Activity |
Ventilation Technical Investigation
|
Number Inspectors |
1
|
Total Hours |
17
|
|
Start Date |
2012-04-25
|
End Date |
2012-06-27
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
17
|
Total Hours |
277.25
|
|
Start Date |
2012-04-04
|
End Date |
2012-04-05
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
4.5
|
|
Start Date |
2012-01-18
|
End Date |
2012-01-18
|
Activity |
Roof Control Technical Investigation
|
Number Inspectors |
1
|
Total Hours |
8
|
|
Start Date |
2012-01-10
|
End Date |
2012-03-29
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
8
|
Total Hours |
184.25
|
|
Start Date |
2011-11-15
|
End Date |
2011-12-20
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
92
|
|
Start Date |
2011-10-17
|
End Date |
2011-10-18
|
Activity |
Electrical Technical Investigation
|
Number Inspectors |
2
|
Total Hours |
19
|
|
Start Date |
2011-09-26
|
End Date |
2011-09-26
|
Activity |
Roof Control Technical Investigation
|
Number Inspectors |
1
|
Total Hours |
8
|
|
Start Date |
2011-07-15
|
End Date |
2011-07-15
|
Activity |
Roof Control Technical Investigation
|
Number Inspectors |
1
|
Total Hours |
8
|
|
Start Date |
2011-06-03
|
End Date |
2011-06-03
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
8
|
|
Start Date |
2011-04-18
|
End Date |
2011-04-22
|
Activity |
Roof Control Technical Investigation
|
Number Inspectors |
1
|
Total Hours |
16
|
|
Start Date |
2011-04-07
|
End Date |
2011-04-13
|
Activity |
Roof Control Technical Investigation
|
Number Inspectors |
1
|
Total Hours |
8.5
|
|
Start Date |
2011-04-04
|
End Date |
2011-06-17
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
3
|
Total Hours |
51
|
|
Start Date |
2011-03-10
|
End Date |
2011-03-29
|
Activity |
Roof Control Technical Investigation
|
Number Inspectors |
1
|
Total Hours |
40.5
|
|
Productions
Sub-Unit Desc
|
UNDERGROUND
|
Year
|
2012
|
Annual Hours
|
5866
|
Annual Coal Prod
|
14298
|
Avg. Annual Empl.
|
8
|
Avg. Employee Hours
|
733
|
|
Sub-Unit Desc
|
SURFACE AT UNDERGROUND
|
Year
|
2012
|
Annual Hours
|
1320
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
660
|
|
Sub-Unit Desc
|
UNDERGROUND
|
Year
|
2011
|
Annual Hours
|
3542
|
Annual Coal Prod
|
4049
|
Avg. Annual Empl.
|
8
|
Avg. Employee Hours
|
443
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2010
|
Annual Hours
|
1800
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
600
|
|
|