Name: | TACKETT MINING, INC. |
Legal type: | Kentucky Corporation |
Status: | Active |
Standing: | Good |
Profit or Non-Profit: | Profit |
File Date: | 18 Jan 2023 (2 years ago) |
Organization Date: | 18 Jan 2023 (2 years ago) |
Last Annual Report: | 06 Nov 2024 (5 months ago) |
Organization Number: | 1254052 |
Industry: | Bituminous Coal and Lignite Mining |
Number of Employees: | Small (0-19) |
ZIP code: | 41653 |
City: | Prestonsburg, Emma, Endicott, Hippo |
Primary County: | Floyd County |
Principal Office: | PO BOX 1352, PRESTONSBURG, KY 41653 |
Place of Formation: | KENTUCKY |
Authorized Shares: | 1000 |
Name | Role |
---|---|
JIMMY TACKETT | Secretary |
Name | Role |
---|---|
JERRY TODD TACKETT | Registered Agent |
Name | Role |
---|---|
JERRY TACKETT | Incorporator |
Name | Role |
---|---|
JERRY TODD TACKETT | President |
Name | File Date |
---|---|
Registered Agent name/address change | 2024-11-06 |
Annual Report Amendment | 2024-11-06 |
Annual Report | 2024-06-23 |
Articles of Incorporation | 2023-01-18 |
Mine Name | Type | Status | Primary Sic | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Mine #3 | Underground | Temporarily Idled | Coal (Bituminous) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Name | Little Ty Coal Co. Inc. |
Role | Operator |
Start Date | 2006-12-14 |
End Date | 2008-05-12 |
Name | Right Fork Energy Inc |
Role | Operator |
Start Date | 2006-02-27 |
End Date | 2006-12-13 |
Name | Blackberry Energy LLC |
Role | Operator |
Start Date | 2008-05-13 |
End Date | 2017-02-14 |
Name | Connor Coal Inc. |
Role | Operator |
Start Date | 2017-02-15 |
End Date | 2017-06-22 |
Name | Little Tackett Mining, L.L.C. |
Role | Operator |
Start Date | 2017-06-23 |
End Date | 2018-05-09 |
Name | Dude Branch III, LLC |
Role | Operator |
Start Date | 2021-09-14 |
End Date | 2023-01-02 |
Name | J & E Mining Inc |
Role | Operator |
Start Date | 2023-12-12 |
End Date | 2024-05-23 |
Name | Tackett Mining, Inc. |
Role | Operator |
Start Date | 2024-05-24 |
Name | Lester And Sons Inc |
Role | Operator |
Start Date | 2018-05-10 |
End Date | 2021-09-13 |
Name | Reliant Contracting, LLC |
Role | Operator |
Start Date | 2023-01-03 |
End Date | 2023-12-11 |
Name | Jerry Tackett |
Role | Current Controller |
Start Date | 2024-05-24 |
Name | Tackett Mining, Inc. |
Role | Current Operator |
Accidents
Accident Date | 2019-12-06 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Struck against stationary object |
Ocupation | Roof bolter, Rock bolter, Pinner, Mobile roof support operator (MRS) |
Narrative | Employee had pulled roof bolter up in #9 entry on 001-1 section to prepare to start bolting place and was bending bolts to be installed first when hand slipped off roof bolt hitting hand on ground and roof bolter. |
Accident Date | 2019-12-05 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Struck by flying object |
Ocupation | Driller operator |
Narrative | Had a bit break off in end of coal drill auger, myself and IE were beating old bit with hammer. Piece of bit broke off hitting IE in the eye, we both were wearing safety glasses but the piece that hit EE busted EE's glasses. |
Accident Date | 2019-10-11 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Caught in, under or between a moving and a stationary object |
Ocupation | Scoop tram operator, Load/Haul/Dump operator |
Narrative | EE stated EE had a leak on one of the bucket jacks, raised head up over top of scoop while scoop still moving to see if EE could see the leak and caught head between scoop and mine roof. |
Accident Date | 2019-10-01 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Struck by falling object |
Ocupation | Scoop car/Scooptram operator, Load/Haul/Dump (LHD) operator, Teletram operator |
Narrative | EE was loading coal out of face of #3 heading. When small piece of rock fell hitting EE on knee, EE never told. Worked rest of shift, then went to E.R. that night. Said bruised knee cap, nothing broke. |
Accident Date | 2018-01-23 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Caught in, under or between a moving and a stationary object |
Ocupation | Scoop tram operator, Load/Haul/Dump operator |
Narrative | Victim was injured when a scoop rolled forward resulting in victims left leg receiving trauma and fractured fibula, prior to being pulled from under the scoop. |
Accident Date | 2006-11-22 |
Degree Inhury | ACCIDENT ONLY |
Accident Type | Accident type, without injuries |
Ocupation | NO VALUE FOUND |
Narrative | Cutting machine was cutting #1 entry when water started coming in. We evacuated the men & made provisions to pump water. After the water had cleared, it was determined we had cut into a cone hole drilled from above. |
Accident Date | 2006-10-26 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Caught in, under or between running or meshing objects |
Ocupation | Discontinued 1/31/2014. Several other codes cover Scoop Car Operator |
Narrative | Scoop operator was dumping coal onto section tailpiece. He accidentally knocked the guard off of the tailpiece roller & caused the section belt to gob off. He helped the tailpiece man clean it up. According to the tailpiece man, after cleaning, the belt was turned on before the guard was put back on. Emp. tripped & put hand in roller. |
Inspections
Start Date | 2024-10-10 |
End Date | 2024-10-10 |
Activity | Spot Inspection |
Number Inspectors | 1 |
Total Hours | 2.75 |
Start Date | 2024-04-02 |
End Date | 2024-05-29 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 86 |
Start Date | 2024-01-17 |
End Date | 2024-03-21 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 73.5 |
Start Date | 2023-12-04 |
End Date | 2023-12-04 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 8 |
Start Date | 2023-07-06 |
End Date | 2023-08-31 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 4 |
Total Hours | 121.5 |
Start Date | 2023-04-14 |
End Date | 2023-06-29 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 100.75 |
Start Date | 2023-01-06 |
End Date | 2023-03-06 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 2 |
Total Hours | 15.25 |
Start Date | 2022-11-21 |
End Date | 2022-11-21 |
Activity | Spot Inspection |
Number Inspectors | 1 |
Total Hours | 3 |
Start Date | 2022-10-03 |
End Date | 2022-11-02 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 2 |
Total Hours | 13 |
Start Date | 2022-07-06 |
End Date | 2022-09-21 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 5 |
Total Hours | 226.5 |
Start Date | 2022-04-06 |
End Date | 2022-06-28 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 4 |
Total Hours | 230.75 |
Start Date | 2022-01-05 |
End Date | 2022-03-23 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 4 |
Total Hours | 79.5 |
Start Date | 2022-01-03 |
End Date | 2022-01-03 |
Activity | Spot Inspection |
Number Inspectors | 1 |
Total Hours | 9.5 |
Start Date | 2021-12-14 |
End Date | 2021-12-14 |
Activity | 103 (g) Written Notification Hazard Complaint Inspectio |
Number Inspectors | 1 |
Total Hours | 3.25 |
Start Date | 2021-10-28 |
End Date | 2021-12-17 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 2 |
Total Hours | 28.5 |
Start Date | 2021-09-08 |
End Date | 2021-09-08 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 5 |
Start Date | 2021-04-28 |
End Date | 2021-04-28 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 5.5 |
Start Date | 2021-01-08 |
End Date | 2021-03-22 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 15.5 |
Start Date | 2020-10-05 |
End Date | 2020-12-17 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 3 |
Total Hours | 14.5 |
Start Date | 2020-09-02 |
End Date | 2020-09-24 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 19.25 |
Productions
Sub-Unit Desc | UNDERGROUND |
Year | 2024 |
Annual Hours | 0 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 0 |
Avg. Employee Hours | 0 |
Sub-Unit Desc | SURFACE AT UNDERGROUND |
Year | 2024 |
Annual Hours | 0 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 0 |
Avg. Employee Hours | 0 |
Sub-Unit Desc | UNDERGROUND |
Year | 2022 |
Annual Hours | 1965 |
Annual Coal Prod | 7450 |
Avg. Annual Empl. | 9 |
Avg. Employee Hours | 218 |
Sub-Unit Desc | UNDERGROUND |
Year | 2021 |
Annual Hours | 980 |
Annual Coal Prod | 4800 |
Avg. Annual Empl. | 9 |
Avg. Employee Hours | 109 |
Sub-Unit Desc | UNDERGROUND |
Year | 2019 |
Annual Hours | 8625 |
Annual Coal Prod | 14381 |
Avg. Annual Empl. | 8 |
Avg. Employee Hours | 1078 |
Sub-Unit Desc | SURFACE AT UNDERGROUND |
Year | 2019 |
Annual Hours | 1947 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 2 |
Avg. Employee Hours | 974 |
Sub-Unit Desc | UNDERGROUND |
Year | 2018 |
Annual Hours | 11272 |
Annual Coal Prod | 14675 |
Avg. Annual Empl. | 9 |
Avg. Employee Hours | 1252 |
Sub-Unit Desc | SURFACE AT UNDERGROUND |
Year | 2018 |
Annual Hours | 2861 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 2 |
Avg. Employee Hours | 1431 |
Sub-Unit Desc | UNDERGROUND |
Year | 2017 |
Annual Hours | 3912 |
Annual Coal Prod | 5942 |
Avg. Annual Empl. | 9 |
Avg. Employee Hours | 435 |
Sub-Unit Desc | SURFACE AT UNDERGROUND |
Year | 2017 |
Annual Hours | 1040 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 2 |
Avg. Employee Hours | 520 |
Sub-Unit Desc | UNDERGROUND |
Year | 2007 |
Annual Hours | 8185 |
Annual Coal Prod | 15460 |
Avg. Annual Empl. | 11 |
Avg. Employee Hours | 744 |
Sub-Unit Desc | SURFACE AT UNDERGROUND |
Year | 2007 |
Annual Hours | 960 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 1 |
Avg. Employee Hours | 960 |
Sub-Unit Desc | UNDERGROUND |
Year | 2006 |
Annual Hours | 4180 |
Annual Coal Prod | 8384 |
Avg. Annual Empl. | 6 |
Avg. Employee Hours | 697 |
Sub-Unit Desc | SURFACE AT UNDERGROUND |
Year | 2006 |
Annual Hours | 1528 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 2 |
Avg. Employee Hours | 764 |
Directions to Mine | 4 mile SE of Rt 292 and upper Stingtown Road |
Parties
Name | Road Fork Development Company Inc |
Role | Operator |
Start Date | 2008-08-13 |
End Date | 2012-07-19 |
Name | Road Fork Development Company, Inc. |
Role | Operator |
Start Date | 2012-11-28 |
End Date | 2023-03-08 |
Name | Stanmark Mining, Inc. |
Role | Operator |
Start Date | 2012-07-20 |
End Date | 2012-11-27 |
Name | Trump Energy, Corp |
Role | Operator |
Start Date | 2023-04-21 |
End Date | 2023-12-10 |
Name | HARDY MINING LLC |
Role | Operator |
Start Date | 2023-03-09 |
End Date | 2023-04-20 |
Name | Tackett Mining, Inc. |
Role | Operator |
Start Date | 2023-12-11 |
Name | Jerry Tackett |
Role | Current Controller |
Start Date | 2023-12-11 |
Name | Tackett Mining, Inc. |
Role | Current Operator |
Accidents
Accident Date | 2011-09-15 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Over-exertion NEC |
Ocupation | Laborer, Bull gang, Parts runner, Roustabout, Roof trimmer/scaler |
Narrative | Employee was helping load a cache of SCSR's into the scoop bucket when he twisted his right knee. |
Accident Date | 2011-07-30 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Struck against stationary object |
Ocupation | Bull gang foreman, Labor foreman, Leadman, Section foreman, Shift boss |
Narrative | EE was walking on offside of belt and hit his head on the roof knocking off his hat. He then bent down and got his hat and when he raised up he hit his head on a chain hanger causing a laceration. He received stitches to close the wound |
Accident Date | 2011-07-28 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Struck against a moving object |
Ocupation | Shuttle car operator, Mantrip operator, Ramcar operator, Rail runner, Buggy operator |
Narrative | Employee had stopped at airlock doors, just inside portal, when a second mantrip entered mine and struck first mantrip resulting in a strain to employee in 1st mantrip. Bright sunlight outside had not allowed eyes of 2nd mantrip operator to adjust. |
Accident Date | 2011-07-13 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Fall to the walkway or working surface |
Ocupation | LW Propman, Propman helper, Move crew if LW, Move-up man, Jacksetter, Advanceman LW helper |
Narrative | Employee was in the process of dragging 48 top structure for the belt move they were making. He stepped on another piece of structure causing his knee to turn causing him to fall. |
Accident Date | 2011-01-16 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Fall to the walkway or working surface |
Ocupation | Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech |
Narrative | Employee was walking towards fan house to conduct checks prior to the mine pre-shift, when he fell, causing a strain to his lower back. |
Accident Date | 2010-11-05 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Struck against stationary object |
Ocupation | Bull gang foreman, Labor foreman, Leadman, Section foreman, Shift boss |
Narrative | EE was going up to the face in the #6 heading, when he stepped on the #2 continuous miner cable and twisted his right knee. Seam height was approximately 50. He was taken to ER and was released with no restrictions but continued to experience pain. On Thursday December 16, 2010 he had surgery to repair a torn meniscus. |
Accident Date | 2010-10-30 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Struck by... NEC |
Ocupation | Electrician, Lineman |
Narrative | EE was tightening at the slack adjustment bolt on the Fletcher RRII roof bolter and the wrench slipped and caused a laceration on his middle finger. He received 3 stitches to close the wound. |
Accident Date | 2010-07-12 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Caught in, under or between NEC |
Ocupation | Roof bolter, Rock bolter, Pinner, Mobile roof support operator (MRS) |
Narrative | Employee was in the process of bolting using a two piece steel. After he drilled his starter hole he started his two piece steel and had his index and middle fingers caught causing a laceration. |
Inspections
Start Date | 2025-01-07 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 2 |
Total Hours | 124 |
Start Date | 2024-10-01 |
End Date | 2024-12-19 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 7 |
Total Hours | 219.25 |
Start Date | 2024-09-24 |
End Date | 2024-09-24 |
Activity | 103 (g) Written Notification Hazard Complaint Inspectio |
Number Inspectors | 2 |
Total Hours | 20 |
Start Date | 2024-07-01 |
End Date | 2024-09-18 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 5 |
Total Hours | 216.5 |
Start Date | 2024-05-22 |
End Date | 2024-05-22 |
Activity | Special Emphasis Programs |
Number Inspectors | 1 |
Total Hours | 3 |
Start Date | 2024-04-02 |
End Date | 2024-06-26 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 5 |
Total Hours | 237.25 |
Start Date | 2024-01-04 |
End Date | 2024-03-28 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 4 |
Total Hours | 262.5 |
Start Date | 2023-12-29 |
End Date | 2023-12-29 |
Activity | Spot Inspection |
Number Inspectors | 1 |
Total Hours | 5 |
Start Date | 2023-10-06 |
End Date | 2023-10-10 |
Activity | Verbal Hazard Complaint Inspections |
Number Inspectors | 1 |
Total Hours | 10 |
Start Date | 2023-10-04 |
End Date | 2023-12-14 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 8 |
Total Hours | 132.5 |
Start Date | 2023-07-07 |
End Date | 2023-09-27 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 3 |
Total Hours | 82.25 |
Start Date | 2023-04-14 |
End Date | 2023-06-26 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 33.5 |
Start Date | 2023-03-09 |
End Date | 2023-03-31 |
Activity | Spot Inspection |
Number Inspectors | 1 |
Total Hours | 29 |
Start Date | 2013-06-20 |
End Date | 2013-06-20 |
Activity | Mine Idle Activity |
Number Inspectors | 1 |
Total Hours | 4.5 |
Start Date | 2013-03-14 |
End Date | 2013-03-15 |
Activity | Mine Idle Activity |
Number Inspectors | 1 |
Total Hours | 6.25 |
Start Date | 2013-01-09 |
End Date | 2013-01-09 |
Activity | Mine Idle Activity |
Number Inspectors | 1 |
Total Hours | 3 |
Start Date | 2012-12-17 |
End Date | 2012-12-17 |
Activity | Mine Idle Activity |
Number Inspectors | 1 |
Total Hours | 2 |
Start Date | 2012-09-18 |
End Date | 2012-09-18 |
Activity | Mine Idle Activity |
Number Inspectors | 1 |
Total Hours | 1 |
Start Date | 2012-08-14 |
End Date | 2012-09-11 |
Activity | Electrical Technical Investigation |
Number Inspectors | 2 |
Total Hours | 15.5 |
Start Date | 2012-06-21 |
End Date | 2012-06-21 |
Activity | Roof Control Technical Investigation |
Number Inspectors | 1 |
Total Hours | 8 |
Productions
Sub-Unit Desc | UNDERGROUND |
Year | 2024 |
Annual Hours | 20672 |
Annual Coal Prod | 48918 |
Avg. Annual Empl. | 13 |
Avg. Employee Hours | 1590 |
Sub-Unit Desc | SURFACE AT UNDERGROUND |
Year | 2024 |
Annual Hours | 2122 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 1 |
Avg. Employee Hours | 2122 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2024 |
Annual Hours | 0 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 0 |
Avg. Employee Hours | 0 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2024 |
Annual Hours | 0 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 0 |
Avg. Employee Hours | 0 |
Sub-Unit Desc | UNDERGROUND |
Year | 2023 |
Annual Hours | 1116 |
Annual Coal Prod | 2464 |
Avg. Annual Empl. | 10 |
Avg. Employee Hours | 112 |
Sub-Unit Desc | SURFACE AT UNDERGROUND |
Year | 2023 |
Annual Hours | 149 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 1 |
Avg. Employee Hours | 149 |
Sub-Unit Desc | UNDERGROUND |
Year | 2013 |
Annual Hours | 284 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 3 |
Avg. Employee Hours | 95 |
Sub-Unit Desc | SURFACE AT UNDERGROUND |
Year | 2013 |
Annual Hours | 94 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 1 |
Avg. Employee Hours | 94 |
Sub-Unit Desc | UNDERGROUND |
Year | 2012 |
Annual Hours | 15762 |
Annual Coal Prod | 26464 |
Avg. Annual Empl. | 19 |
Avg. Employee Hours | 830 |
Sub-Unit Desc | SURFACE AT UNDERGROUND |
Year | 2012 |
Annual Hours | 1557 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 2 |
Avg. Employee Hours | 779 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2012 |
Annual Hours | 2159 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 4 |
Avg. Employee Hours | 540 |
Sub-Unit Desc | UNDERGROUND |
Year | 2011 |
Annual Hours | 95646 |
Annual Coal Prod | 144587 |
Avg. Annual Empl. | 39 |
Avg. Employee Hours | 2452 |
Sub-Unit Desc | SURFACE AT UNDERGROUND |
Year | 2011 |
Annual Hours | 7520 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 3 |
Avg. Employee Hours | 2507 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2011 |
Annual Hours | 8598 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 5 |
Avg. Employee Hours | 1720 |
Sub-Unit Desc | UNDERGROUND |
Year | 2010 |
Annual Hours | 41794 |
Annual Coal Prod | 99057 |
Avg. Annual Empl. | 20 |
Avg. Employee Hours | 2090 |
Sub-Unit Desc | SURFACE AT UNDERGROUND |
Year | 2010 |
Annual Hours | 5663 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 3 |
Avg. Employee Hours | 1888 |
Directions to Mine | 2.5 MILES FROM THE JUNCTION OF KY. RTE. 319 AND RTE. 3419. LEFT FORK OF BLACKBERRY CREEK. ON NETLEY FORK ROAD, PIKE COUNTY, KY. |
Parties
Name | TENNCO INC. |
Role | Operator |
Start Date | 2022-03-25 |
End Date | 2024-05-21 |
Name | BEECH TREE MINING LLC |
Role | Operator |
Start Date | 2018-12-04 |
End Date | 2020-03-05 |
Name | Trump Energy Corp. |
Role | Operator |
Start Date | 2020-03-06 |
End Date | 2020-09-13 |
Name | PODIUM MINING LLC |
Role | Operator |
Start Date | 2020-09-14 |
End Date | 2022-03-24 |
Name | Tackett Mining, Inc. |
Role | Operator |
Start Date | 2024-05-22 |
Name | Jerry Tackett |
Role | Current Controller |
Start Date | 2024-05-22 |
Name | Tackett Mining, Inc. |
Role | Current Operator |
Accidents
Accident Date | 2020-11-25 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Struck by... NEC |
Ocupation | Beltman, Conveyor man, Conveyor belt worker, Mobile bridge carrierman, Feeder operator, Conveyor rider |
Narrative | Employee was using a knife to cut belt and the knife slid causing injury to hand. |
Inspections
Start Date | 2025-01-15 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 2 |
Total Hours | 35 |
Start Date | 2024-10-01 |
End Date | 2024-12-19 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 6 |
Total Hours | 218.25 |
Start Date | 2024-08-30 |
End Date | 2024-08-30 |
Activity | Special Emphasis Programs |
Number Inspectors | 1 |
Total Hours | 1.5 |
Start Date | 2024-07-11 |
End Date | 2024-09-04 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 2 |
Total Hours | 26.5 |
Start Date | 2024-04-08 |
End Date | 2024-06-17 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 3 |
Total Hours | 26 |
Start Date | 2024-01-12 |
End Date | 2024-03-26 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 2 |
Total Hours | 16 |
Start Date | 2023-11-06 |
End Date | 2023-12-21 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 6.5 |
Start Date | 2023-07-05 |
End Date | 2023-08-24 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 9.5 |
Start Date | 2023-04-24 |
End Date | 2023-04-24 |
Activity | Spot Inspection |
Number Inspectors | 1 |
Total Hours | 8 |
Start Date | 2023-04-11 |
End Date | 2023-04-17 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 2 |
Total Hours | 16.5 |
Start Date | 2023-01-05 |
End Date | 2023-03-20 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 4 |
Total Hours | 106.75 |
Start Date | 2022-10-03 |
End Date | 2022-12-22 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 3 |
Total Hours | 186.25 |
Start Date | 2022-07-13 |
End Date | 2022-09-28 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 9 |
Total Hours | 247 |
Start Date | 2022-04-04 |
End Date | 2022-06-29 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 4 |
Total Hours | 150.25 |
Start Date | 2022-01-27 |
End Date | 2022-02-14 |
Activity | Verbal Hazard Complaint Inspections |
Number Inspectors | 2 |
Total Hours | 35.75 |
Start Date | 2022-01-19 |
End Date | 2022-01-20 |
Activity | 103 (g) Written Notification Hazard Complaint Inspectio |
Number Inspectors | 2 |
Total Hours | 22.75 |
Start Date | 2022-01-03 |
End Date | 2022-03-25 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 6 |
Total Hours | 290.5 |
Start Date | 2021-10-07 |
End Date | 2021-10-08 |
Activity | Verbal Hazard Complaint Inspections |
Number Inspectors | 2 |
Total Hours | 20 |
Start Date | 2021-10-01 |
End Date | 2021-12-27 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 4 |
Total Hours | 139.5 |
Start Date | 2021-07-25 |
End Date | 2021-07-28 |
Activity | Verbal Hazard Complaint Inspections |
Number Inspectors | 1 |
Total Hours | 4.75 |
Productions
Sub-Unit Desc | UNDERGROUND |
Year | 2024 |
Annual Hours | 1014 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 3 |
Avg. Employee Hours | 338 |
Sub-Unit Desc | SURFACE AT UNDERGROUND |
Year | 2024 |
Annual Hours | 536 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 1 |
Avg. Employee Hours | 536 |
Sub-Unit Desc | UNDERGROUND |
Year | 2023 |
Annual Hours | 9321 |
Annual Coal Prod | 5415 |
Avg. Annual Empl. | 13 |
Avg. Employee Hours | 717 |
Sub-Unit Desc | SURFACE AT UNDERGROUND |
Year | 2023 |
Annual Hours | 1106 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 1 |
Avg. Employee Hours | 1106 |
Sub-Unit Desc | UNDERGROUND |
Year | 2022 |
Annual Hours | 23547 |
Annual Coal Prod | 23528 |
Avg. Annual Empl. | 17 |
Avg. Employee Hours | 1385 |
Sub-Unit Desc | SURFACE AT UNDERGROUND |
Year | 2022 |
Annual Hours | 2088 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 1 |
Avg. Employee Hours | 2088 |
Sub-Unit Desc | UNDERGROUND |
Year | 2021 |
Annual Hours | 5240 |
Annual Coal Prod | 8200 |
Avg. Annual Empl. | 16 |
Avg. Employee Hours | 328 |
Sub-Unit Desc | SURFACE AT UNDERGROUND |
Year | 2021 |
Annual Hours | 640 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 2 |
Avg. Employee Hours | 320 |
Sub-Unit Desc | UNDERGROUND |
Year | 2020 |
Annual Hours | 4160 |
Annual Coal Prod | 6000 |
Avg. Annual Empl. | 13 |
Avg. Employee Hours | 320 |
Sub-Unit Desc | SURFACE AT UNDERGROUND |
Year | 2020 |
Annual Hours | 320 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 1 |
Avg. Employee Hours | 320 |
Sub-Unit Desc | UNDERGROUND |
Year | 2019 |
Annual Hours | 28800 |
Annual Coal Prod | 23846 |
Avg. Annual Empl. | 12 |
Avg. Employee Hours | 2400 |
Directions to Mine | From US 23 cross the Island Creek Road Bridge onto Route 1426, and proceed to Route 1426 to Route 3416, take Route 3416 to the end of the Route to the Jobsite. |
Parties
Name | Tackett Mining, Inc. |
Role | Operator |
Start Date | 2023-04-03 |
Name | Jerry Tackett |
Role | Current Controller |
Start Date | 2023-04-03 |
Name | Tackett Mining, Inc. |
Role | Current Operator |
Inspections
Start Date | 2025-02-03 |
End Date | 2025-02-03 |
Activity | Spot Inspection |
Number Inspectors | 0 |
Total Hours | 0 |
Start Date | 2024-10-07 |
End Date | 2024-10-07 |
Activity | Spot Inspection |
Number Inspectors | 1 |
Total Hours | 3 |
Start Date | 2024-04-23 |
End Date | 2024-05-02 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 9 |
Start Date | 2024-01-05 |
End Date | 2024-03-13 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 3 |
Total Hours | 18.25 |
Start Date | 2023-10-13 |
End Date | 2023-12-13 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 7 |
Total Hours | 130.5 |
Start Date | 2023-07-06 |
End Date | 2023-09-28 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 6 |
Total Hours | 218.75 |
Start Date | 2023-05-23 |
End Date | 2023-05-26 |
Activity | Non-Injury Accident Investigation |
Number Inspectors | 1 |
Total Hours | 26.5 |
Start Date | 2023-05-16 |
End Date | 2023-06-26 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 5 |
Total Hours | 63 |
Start Date | 2023-05-10 |
End Date | 2023-05-10 |
Activity | Spot Inspection |
Number Inspectors | 1 |
Total Hours | 4 |
Start Date | 2023-04-17 |
End Date | 2023-04-17 |
Activity | Spot Inspection |
Number Inspectors | 1 |
Total Hours | 9 |
Productions
Sub-Unit Desc | UNDERGROUND |
Year | 2024 |
Annual Hours | 0 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 0 |
Avg. Employee Hours | 0 |
Sub-Unit Desc | SURFACE AT UNDERGROUND |
Year | 2024 |
Annual Hours | 0 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 0 |
Avg. Employee Hours | 0 |
Sub-Unit Desc | UNDERGROUND |
Year | 2023 |
Annual Hours | 9612 |
Annual Coal Prod | 15812 |
Avg. Annual Empl. | 9 |
Avg. Employee Hours | 1068 |
Sub-Unit Desc | SURFACE AT UNDERGROUND |
Year | 2023 |
Annual Hours | 1698 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 1 |
Avg. Employee Hours | 1698 |
Sources: Kentucky Secretary of State